Commercial Electrical work permitted May 23, 2025. Contractor on record: Michael Scalzo.
REMOVE EXISTING ZINSCO 400A MAIN SERVICE BOARD, (3) EXISTING 200A ZINSCO SUB PANELS AND EXISTING MCC BOARD. INSTALL NEW 400A MAIN SERVICE BOARD AND (3) NEW 200A 3 PHASE PANEL BOARDS. INSTALL NEW CONDUIT AND WIRE TO FEED NEW J-BOX TO INTERCEPT MCC FEED AND RECONNECT TO NEW PANEL D WITH EXISTING CONDUIT AND WIRE. RECONNECT AND REFEED EXISTING BRANCH CIRCUITS CONDUIT AND WIRES FOR PANEL A AND B. ALL BRANCH CIRCUITS ARE EXISTING. NO ADDITIONAL LOADS ARE BEING ADDED.
San Diego permit records name Michael Scalzo as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
1 permit issued May 23 – May 23, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied May 23 | #PMT-3355270 No-Plan - Nonresidential/Multifamily - Electrical REMOVE EXISTING ZINSCO 400A MAIN SERVICE BOARD, (3) EXISTING 200A ZINSCO SUB PANELS AND EXISTING MCC BOARD. INSTALL NEW 400A MAIN SERVICE BOARD AND (3) NEW 200A 3 PHASE PANEL BOARDS. INSTALL NEW CONDUIT AND WIRE TO FEED NEW J-BOX TO INTERCEPT MCC FEED AND RECONNECT TO NEW PANEL D WITH EXISTING… |
Status: Issued
| Michael Scalzo |
| — |