Get Procommercial project · San Diego, CA
Commercial Electrical, Hvac/Mechanical work permitted May 16, 2025, with 4 permits through July 6, 2026. Contractor on record: Alyson Jines.
Like for Like replacements in same locations of (3) 2 ton heat pump hvac systems located in Building 10's Laundry Room, Community Room, and Leasing Office.
San Diego permit records name Alyson Jines and Charge on LLC as the contractors on this project.
4 permits issued May 16 – Jul 6, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 6 | #PMT-3425330 No-Plan - Nonresidential/Multifamily - Mechanical Like for Like replacements in same locations of (3) 2 ton heat pump hvac systems located in Building 10's Laundry Room, Community Room, and Leasing Office. |
In San Diego, biggest first.
Status: Closed
| Alyson Jines |
| — |
| applied Jul 6 | #PMT-3425314 No-Plan - Nonresidential/Multifamily - Mechanical Like for like replacement in same location of (1) 2 ton heat pump HVAC system located in building 1's Laundry room. Status: Closed | Alyson Jines | — |
| applied Jul 6 | #PMT-3425322 No-Plan - Nonresidential/Multifamily - Mechanical Like for like replacement in same location of (1) 2 ton heat pump hvac system located in building 8 laundry room. Status: Closed | Alyson Jines | — |
| applied Mar 31 | #PMT-3345905 No-Plan - Nonresidential/Multifamily - Electrical Scope install a total of 3 solar monitoring devices (Itron Meters) into an existing PV system. Meter will be installed in-line with existing conduits and circuits. 50-200 AMP Circuit Monitoring devices to be located at Bldgs 4,5 and 10 at the existing PV AC disconnect. Status: Inspection Followup | Charge on LLC | — |