Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial Electrical, Mep, Solar work permitted November 19, 2024, with 3 permits through September 5, 2025. Contractor on record: Ampere electric.
Replacing 100 amp main panel to 125 amp in the same location
San Diego permit records name Ampere electric, Ecowater System of San Diego and Kelsie Castro as the contractors on this project.
3 permits issued Nov 19 – Sep 5, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 5 | #PMT-3373641 No-Plan - Nonresidential/Multifamily - Electrical |
In San Diego, biggest first.
Replacing 100 amp main panel to 125 amp in the same location
Status: Issued
| Ampere electric |
| — |
| applied Dec 6 | #PMT-3326808 No-Plan - Residential - Combination Mech/Elec/Plum Status: Issued | Ecowater System of San Diego | — |
| applied Nov 19 | #PMT-3323879 Photovoltaic - SB 379 Status: Closed | Kelsie Castro | — |