Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial General Building, Electrical, Hvac/Mechanical, Plumbing work permitted August 6, 2025, with 4 permits through August 6, 2025, declaring $850,000 of work. Contractor on record: Island Construction Corporation.
Proposed (N) custom pool and SPA, max 6” depth to the level 34th of a (N) mixed used 34-story high rise building. The scope includes stainless steel shell · wall and floor coating: non-skid tile (white) · filtration system: high-rate sand filtration system · sanitation system: chemical pumps and tanks, chemistry controller · accessories: life safety equipment and signage - design per local code · deck equipment: handrails, anchors, ADA lift as required. New Building permit under a separate permit: grading permit - PRJ#1057347, public improvement plan - PRJ#1057058 permit PRJ#1057347; APN#…
San Diego permit records name Island Construction Corporation as the contractor on this project.
4 permits issued Aug 6 – Aug 6, newest first.
| Issued | Permit | Contractor | Value |
|---|
In San Diego, biggest first.
| applied Dec 9 | #PMT-3327054 Mechanical Pmt For mechanical works associated with a proposed (N) custom pool and SPA, max 6” depth to the level 34th of a (N) mixed used 34-story high rise building. The scope includes stainless steel shell · wall and floor coating: non-skid tile (white) · filtration system: high-rate sand filtration system ·… Status: Closed | Island Construction Corporation | — |
| applied Dec 9 | #PMT-3327049 Building Permit Proposed (N) custom pool and SPA, max 6” depth to the level 34th of a (N) mixed used 34-story high rise building. The scope includes stainless steel shell · wall and floor coating: non-skid tile (white) · filtration system: high-rate sand filtration system · sanitation system: chemical pumps and… Status: Issued | Island Construction Corporation | $850K |
| applied Dec 9 | #PMT-3327053 Electrical Pmt For electrical works associated with a proposed (N) custom pool and SPA, max 6” depth to the level 34th of a (N) mixed used 34-story high rise building. The scope includes stainless steel shell · wall and floor coating: non-skid tile (white) · filtration system: high-rate sand filtration system ·… Status: Closed | Island Construction Corporation | — |
| applied Dec 9 | #PMT-3327055 Plumbing Pmt For plumbing works associated with a proposed (N) custom pool and SPA, max 6” depth to the level 34th of a (N) mixed used 34-story high rise building. The scope includes stainless steel shell · wall and floor coating: non-skid tile (white) · filtration system: high-rate sand filtration system ·… Status: Closed | Island Construction Corporation | — |