Get ProEvery project in every city · from $79/mo
Get Promultifamily project · San Diego, CA
Multifamily General Building, Plumbing work permitted June 1, 2026, with 2 permits through June 8, 2026, declaring $336,927 of work. Contractor on record: carlos Herrera.
For a proposed two-story building with (2) ADUs plus 1 affordable (Moderate) ADU and 1 bonus ADU with total of (4) ADUs, detached from an existing one-story SDU. BC CODE 1041.
San Diego permit records name carlos Herrera as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
2 permits issued Jun 1 – Jun 8, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 30 | #PMT-3231435 Plumbing Pmt Plumbing work associated with a proposed two-story building with (2) ADUs plus 1 affordable (Moderate) ADU and 1 bonus ADU with total of (4) ADUs, detached from an existing one-story SDU. |
In San Diego, biggest first.
Status: Issued
| carlos Herrera |
| — |
| applied Jun 30 | #PMT-3231431 Building Permit For a proposed two-story building with (2) ADUs plus 1 affordable (Moderate) ADU and 1 bonus ADU with total of (4) ADUs, detached from an existing one-story SDU. BC CODE 1041. Status: Issued | carlos Herrera | $337K |