Commercial Electrical, Solar work permitted March 6, 2026, with 2 permits through August 10, 2026. Contractor on record: Kelsie Castro.
7.98 KW PV Array, 19 Modules, 27 KWH Energy Storage System
San Diego permit records name Kelsie Castro and Matthew Good as the contractors on this project.
2 permits issued Mar 6 – Aug 10, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 10 | #PMT-3432827 Photovoltaic - SB 379 7.98 KW PV Array, 19 Modules, 27 KWH Energy Storage System Status: Closed | Kelsie Castro |
In San Diego, biggest first.
| — |
| applied Mar 6 | #PMT-3405038 No-Plan - Nonresidential/Multifamily - Electrical Msp replacement 125amp. SDGE installed a OPSO on the gas so the panel can remain at the existing location. Status: Closed | Matthew Good | — |