Multifamily Electrical work permitted November 19, 2025. Contractor on record: D & N Electric, Inc..
For the proposed removal of the existing main switch and 9 meters, and the existing service entrance conductors installed on the building. The installation of a new Square D brand 600-AMP 120/240-volt main switch and parallel 350 KCMIL service entrance conductors using the existing service riser conduits. Upgrade the grounding system conductors as required. Reconnect the existing apartment panel feeder to the new meter equipment. The work will be done on an existing MDU. RM-1-1 R-301263 02/28/2006
San Diego permit records name D & N Electric, Inc. as the contractor on this project.
1 permit issued Nov 19 – Nov 19, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 3 | #PMT-3373137 Electrical Pmt For the proposed removal of the existing main switch and 9 meters, and the existing service entrance conductors installed on the building. The installation of a new Square D brand 600-AMP 120/240-volt main switch and parallel 350 KCMIL service entrance conductors using the existing service riser… |
In San Diego, biggest first.
Status: Closed
| D & N Electric, Inc. |
| — |