Commercial General Building, Electrical, Fire Protection, Plumbing work permitted July 1, 2026, with 5 permits through August 18, 2026, declaring $5,073,120 of work. Contractor on record: PCL Construction.
For the renovation of existing 4th floor pool deck and fitness center at Manchester Grand Hyatt.Exterior scope of work includes: new pool bar and food service equipment new and modified plumbing new and modified electrical remove existing planters and install new deck slab infill new pool bar canopy and structural columns remove existing cabana structures and install new cabana structures in new location interior scope of work includes: new floor and wall finishes at fitness and fitness restrooms (no electrical scope) new fitness gym equipment (no electrical scope)
San Diego permit records name PCL Construction, HCI Systems, Inc. and Pyro-Comm Systems, Inc. as the contractors on this project.
5 permits issued Jul 1 – Aug 18, newest first.
In San Diego, biggest first.
| Issued | Permit | Contractor | Value |
|---|
| applied Jul 2 | #PMT-3425021 Approval - Construction - Fire Pmt - Suppression Deferred Fire Sprinklers with Plans. PRJ-1149677, PMT-3394533. Status: Inspection Followup | HCI Systems, Inc. | — |
| applied Jul 31 | #PMT-3430854 Approval - Construction - Fire Pmt - Alarm Deferred Fire Alarm Affidavit. 0 Devices/Appliances. PRJ-1149677 PMT-3394533. Status: Issued | Pyro-Comm Systems, Inc. | — |
| applied Dec 30 | #PMT-3394533 Building Permit For the renovation of existing 4th floor pool deck and fitness center at Manchester Grand Hyatt.Exterior scope of work includes: new pool bar and food service equipment new and modified plumbing new and modified electrical remove existing planters and install new deck slab infill new pool bar… Status: Inspection Followup | PCL Construction | $5.1M |
| applied Dec 30 | #PMT-3394537 Plumbing Pmt Associated plumbing work for the renovation of existing 4th floor pool deck and fitness center at Manchester Grand Hyatt. Status: Inspection Followup | PCL Construction | — |
| applied Dec 30 | #PMT-3394535 Electrical Pmt Associated electrical work for the renovation of existing 4th floor pool deck and fitness center at Manchester Grand Hyatt. Status: Inspection Followup | PCL Construction | — |