Commercial General Building, Electrical work permitted November 19, 2024, with 6 permits through August 19, 2026.
SINGLE PDF PROCESS/ EMERGENCY COORDINATION CENTER HVAC UPGRADE ROOF; INSTALL AIR TO WATER HEAT PUMP, REBALANCE HYDRONIC PUMPS, PIPING AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
6 permits issued Nov 19 – Aug 19, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 19 | #2026-061615-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ EMERGENCY COORDINATION CENTER HVAC UPGRADE ROOF; INSTALL AIR TO WATER HEAT PUMP, REBALANCE HYDRONIC PUMPS, PIPING AND ELEC Status: Issued | Not published | — |
#2025-002430-000-00-FA Facility Permit · Alteration OpConnect Bush St EVCS; Install (4) dual pedestal EVCS Status: Final |
| Not published |
| — |
| applied Jan 10 | #2025-002432-000-00-FA Facility Permit · Alteration power-OpConnect Bush St EVCS; Install (4) dual pedestal EVCS Status: Final | Not published | — |
| applied Dec 17 | #2024-105518-000-00-ET Electrical Permit · Addition/Alteration/Replacement Install pole fixtures in parking lots Status: Final | Not published | — |
| applied Nov 19 | #2024-098492-000-00-FA Facility Permit · Alteration Bush St Shop EVCS; Install (2) 40amp circuits to (2) EV charger stations in parking area Status: Final | Not published | — |
| applied Nov 19 | #2024-098495-000-00-FA Facility Permit · Alteration power- Bush St Shop EVCS; Install (2) 40amp circuits to (2) EV charger stations in parking area Status: Final | Not published | — |