Commercial Electrical, Hvac/Mechanical work permitted December 4, 2025, with 2 permits through June 22, 2026.
INSTALL SEISMIC GAS SHUTOFF VALVE AT THE METER.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Dec 4 – Jun 22, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 15 | #2026-043779-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) INSTALL SEISMIC GAS SHUTOFF VALVE AT THE METER. Status: Issued | Not published | — |
| applied Dec 4 |
#2025-097840-000-00-ET Electrical Permit · Addition/Alteration/Replacement Install new conduit & wire from Panel F to new outlet/GFCI. Install (1) new 20A circuit for new outlet/GFCI. Install GFCI blank to control new outlet. 700463 Status: Final |
| Not published |
| — |