Get ProEvery project in every city · from $79/mo
Get Procommercial project · Portland, OR
Commercial Electrical work permitted September 26, 2025.
Installing pull vault and new home run electrical circuit for the existing lift station at PDX airport located at Gate 9 in the terminal. This also includes upgrading the breaker to a 50 amp breaker along with a new starter from Allen Bradley. Tie into two 1" conduits and install two SST splice boxes within the new vault.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Sep 26 – Sep 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 26 | #2025-078966-000-00-ET Electrical Permit · Addition/Alteration/Replacement Installing pull vault and new home run electrical circuit for the existing lift station at PDX airport located at Gate 9 in the terminal. This also includes upgrading the breaker to a 50 amp breaker along with a new starter from Allen Bradley. Tie into two 1" conduits and install two SST splice… Status: Final |
| — |