Get ProEvery project in every city · from $79/mo
Get Procommercial project · Portland, OR
Commercial General Building, Electrical work permitted October 29, 2024, with 70 permits through September 9, 2026, declaring $8,776,394 of work.
SINGLE PDF PROCESS/ OHSU KOLLER PAVILION LINEAR ACCELERATOR 4TH FLR TI; DEMO WALLS, NEW WALLS TO REMODEL THERAPY VAULT RM 4, CONTROL RM, STORAGE RM, REPLACE LINEAR ACCELERATOR EQUIPMENT, CEILING, FLOORING, FINISHES, PLUMB AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
70 permits issued Oct 29 – Sep 9, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 19 | #2026-061653-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOLLER PAVILION LINEAR ACCELERATOR 4TH FLR TI; DEMO WALLS, NEW WALLS TO REMODEL THERAPY VAULT RM 4, CONTROL RM, STORAGE RM, REPLACE LINEAR ACCELERATOR EQUIPMENT, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published |
| $1.5M |
| applied Aug 19 | #2026-061659-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOLLER PAVILION LINEAR ACCELERATOR 4TH FLR TI; INSTALL PUMP, FAN COIL, HEAT EXCHANGER, TERMINAL UNITS, DUCTWORK, PIPING, DIFFUSERS, GRILLES AND ELEC Status: Issued | Not published | $142K |
| applied Aug 28 | #2026-064350-000-00-FA Facility Permit · Alteration fire alarm - OHSU KPV HEART & VASULAR INPATIENT FIRE ALARM 14TH FLR; ADD 3 STROBES TO OFFICES Status: Issued | Not published | — |
| applied Jun 30 | #2026-048095-000-00-FA Facility Permit · Alteration power, data, security, nurse call-OHSU KPV NEUROSCIENCES INPATIENT UPGRADE 11TH FLR TI; MINOR DEMO, REMODEL PATIENT RMS, CLEAN WORKRMS, CLEAN SUPPLY & EQUIPMENT STORAGE RM, NOURISHMENT RM, OFFICE, PT/OT RM, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Aug 19 | #2026-061652-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOLLER PAVILION LINEAR ACCELERATOR 4TH FLR TI; DEMO WALLS, NEW WALLS TO REMODEL THERAPY VAULT RM 4, CONTROL RM, STORAGE RM, REPLACE LINEAR ACCELERATOR EQUIPMENT, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Aug 5 | #2026-057814-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KPV HEART & VASULAR INPATIENT FIRE ALARM 14TH FLR; ADD 3 STROBES TO OFFICES Status: Final | Not published | $5K |
| applied Aug 5 | #2026-057812-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KPV HEART & VASULAR INPATIENT FIRE ALARM 14TH FLR; ADD 3 STROBES TO OFFICES Status: Issued | Not published | — |
| applied Jun 30 | #2026-048061-000-00-FA Facility Permit · Alteration OHSU KPV- OR26 Replace AV imaging Integration system Status: Issued | Not published | — |
| applied Jun 30 | #2026-048064-000-00-FA Facility Permit · Alteration OHSU KPV- OR26 Replace AV imaging Integration system; All fiber/ Low Voltage connections to reconnect a system through equipment and existing raceways between equip. Status: Final | Not published | — |
| applied Jun 25 | #2026-046603-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KPV NEUROSCIENCES INPATIENT UPGRADE 11TH FLR TI; MINOR DEMO, REMODEL PATIENT RMS, CLEAN WORKRMS, CLEAN SUPPLY & EQUIPMENT STORAGE RM, NOURISHMENT RM, OFFICE, PT/OT RM, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jun 4 | #2026-040797-000-00-FA Facility Permit · Alteration hvac controls-OHSU KOHLER PAVILION HEART & VASULAR INPATIENT 13TH & 14TH FLR TI Status: Final | Not published | — |
| applied Apr 22 | #2026-028912-000-00-FA Facility Permit · Alteration power- OHSU KOHLER PAVILION LOADING DOCK 16 3RD FLR TI; MINOR DEMO, REPLACE EQUIPMENT STERILIZER, TRASH COMPACTOR, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied May 20 | #2026-036904-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION HEART & VASULAR INPATIENT 13TH & 14TH FLR TI; RAISE CANDELAS ON EXISTING STROBES, INSTALL PULL STATIONS, 8 STROBES, 2 PULL STATIONS Status: Final | Not published | $15K |
| applied Apr 21 | #2026-028681-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION LOADING DOCK 16 3RD FLR TI; MINOR DEMO, REPLACE EQUIPMENT STERILIZER, TRASH COMPACTOR, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | $1.3M |
| applied Feb 11 | #2026-010474-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION HEART & VASULAR INPATIENT 13TH & 14TH FLR TI; MINOR DEMO, REMODEL 13TH FLR - CLEAN WORKRMS, NURSE MA STATION, HANDWASH STATIONS, CLEAN SUPPLY & EQUIPMENT STORAGE RM, 14TH FLR - PATIENT RMS, CLEAN WORKRMS, NURSE MA STATION, HAND WASH STATIONS, CLEAN SUPPLY &… Status: Final | Not published | — |
| applied Jan 22 | #2026-005539-000-00-FA Facility Permit · Alteration power, fire al, data, nurse call -OHSU KOHLER PAVILION HEART & VASULAR INPATIENT 13TH & 14TH FLR TI; MINOR DEMO, REMODEL 13TH FLR - CLEAN WORKRMS, NURSE MA STATION, HANDWASH STATIONS, CLEAN SUPPLY & EQUIPMENT STORAGE RM, 14TH FLR - PATIENT RMS, CLEAN WORKRMS, NURSE MA STATION, HAND WASH STATIONS,… Status: Final | Not published | — |
| applied Apr 21 | #2026-028680-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION LOADING DOCK 16 3RD FLR TI; MINOR DEMO, REPLACE EQUIPMENT STERILIZER, TRASH COMPACTOR, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Apr 15 | #2026-027170-000-00-FA Facility Permit · Alteration OHSU KPV rm6117 (2) -120V circuits to dedicated outlets Status: Issued | Not published | — |
| applied Apr 15 | #2026-027172-000-00-FA Facility Permit · Alteration power-OHSU KPV rm6117 (2) -120V circuits to dedicated outlets Status: Final | Not published | — |
| applied Jan 22 | #2026-005468-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION HEART & VASULAR INPATIENT 13TH & 14TH FLR TI; MINOR DEMO, REMODEL 13TH FLR - CLEAN WORKRMS, NURSE MA STATION, HANDWASH STATIONS, CLEAN SUPPLY & EQUIPMENT STORAGE RM, 14TH FLR - PATIENT RMS, CLEAN WORKRMS, NURSE MA STATION, HAND WASH STATIONS, CLEAN SUPPLY &… Status: Final | Not published | $1.2M |
| applied Jan 22 | #2026-005471-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION HEART & VASULAR INPATIENT 13TH & 14TH FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS AND ELEC Status: Final | Not published | $210K |
| applied Jan 22 | #2026-005464-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION HEART & VASULAR INPATIENT 13TH & 14TH FLR TI; MINOR DEMO, REMODEL 13TH FLR - CLEAN WORKRMS, NURSE MA STATION, HANDWASH STATIONS, CLEAN SUPPLY & EQUIPMENT STORAGE RM, 14TH FLR - PATIENT RMS, CLEAN WORKRMS, NURSE MA STATION, HAND WASH STATIONS, CLEAN SUPPLY &… Status: Issued | Not published | — |
| applied Nov 19 | #2025-058155-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION SPD CART WASHER 5TH FLR TI; REVISION TO INSTALL SONIC IRRIGATOR, SEISMIC ANCHORAGE, PLUMB AND ELEC Status: Final | Not published | $16.6K |
| applied Nov 5 | #2025-069095-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KPV TELEMTRY STE 1300B 13TH FLR; REVISION TO OCCUPANCY DUE TO OHA COMMENTS Status: Final | Not published | — |
| applied Aug 26 | #2025-069342-000-00-FA Facility Permit · Alteration power, data-OHSU KPV TELEMTRY STE 1300B 13TH FLR; DEMO WALL, REMODEL SPACE INTO TELEMETRY RM, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | — |
| applied Sep 9 | #2025-072355-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX REPLACEMENT OF CRITICAL BRANCH UPS WITH NEW BATTERY UNIT Status: Final | Not published | — |
| applied Aug 6 | #2025-063404-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION SPD CART WASHER 5TH FLR TI; DEMO WALLS, REMODEL CART WASH AREA, DRYER AREA, ANTE RM, HOUSEKEEPING RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-PRESSURE REDUCER, 1-FLOOR SINK Status: Final | Not published | — |
| applied Sep 4 | #2025-071849-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION SPD CART WASHER 5TH FLR TI; ADD AND RELOCATE SPRINKLER HEADS AS NECESSARY TO ACCOMMODATE NEW TI SPACE, 2 HEADS Status: Final | Not published | $1.7K |
| applied Aug 26 | #2025-069095-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KPV TELEMTRY STE 1300B 13TH FLR; DEMO WALL, REMODEL SPACE INTO TELEMETRY RM, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | $148K |
| applied Jul 21 | #2025-058193-000-00-FA Facility Permit · Alteration power, fire alarm- OHSU KOHLER PAVILION SPD CART WASHER 5TH FLR TI; DEMO WALLS, REMODEL CART WASH AREA, DRYER AREA, ANTE RM, HOUSEKEEPING RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Jul 21 | #2025-058155-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION SPD CART WASHER 5TH FLR TI; DEMO WALLS, REMODEL CART WASH AREA, DRYER AREA, ANTE RM, HOUSEKEEPING RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $650K |
| applied Jul 21 | #2025-058157-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION SPD CART WASHER 5TH FLR TI; INSTALL DUCTWORK, PIPING AND ELEC Status: Final | Not published | $41K |
| applied Aug 27 | #2025-069634-000-00-FA Facility Permit · Alteration KPV 13000 Temp office; Power and data for temporary office furniture install. Existing circuits utilized. Status: Issued | Not published | — |
| applied Aug 27 | #2025-069642-000-00-FA Facility Permit · Alteration power/data-KPV 13000 Temp office; Power and data for temporary office furniture install. Existing circuits utilized. Status: Final | Not published | — |
| applied Aug 26 | #2025-069089-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KPV TELEMTRY STE 1300B 13TH FLR; DEMO WALL, REMODEL SPACE INTO TELEMETRY RM, CEILING, FLOORING, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Aug 7 | #2024-042163-DFS-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOLLER PAVILION LINEAR ACCELERATOR 4TH FLR TI; DFS FOR SEISMIC ANCHORAGE FOR FAN COIL UNIT Status: Final | Not published | $2.5K |
| applied Jul 3 | #2025-052945-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION OR 22 REMODEL 6TH FLR; MINOR DEMO, REMODEL OR 22, INSTALL EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Final | Not published | $731K |
| applied Jul 14 | #2025-056153-000-00-FA Facility Permit · Alteration power-OHSU KOHLER PAVILION OR 22 REMODEL 6TH FLR; MINOR DEMO, REMODEL OR 22, INSTALL EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Final | Not published | — |
| applied Jul 14 | #2025-056151-000-00-FA Facility Permit · Alteration power- OHSU KOHLER PAVILION OR 20 REMODEL 6TH FLR; MINOR DEMO, REMODEL OR 20, INSTALL EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Final | Not published | — |
| applied Jun 26 | #2025-050929-000-00-FA Facility Permit · Alteration power-SEE 25-019566 fa for approval OHSU KOHLER PAVILION OR 15 6TH FLR TI; MINOR DEMO, REMODEL OR 15, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Final | Not published | — |
| applied Jul 21 | #2025-058152-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION SPD CART WASHER 5TH FLR TI; DEMO WALLS, REMODEL CART WASH AREA, DRYER AREA, ANTE RM, HOUSEKEEPING RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jul 14 | #2025-056145-000-00-FA Facility Permit · Alteration power, data - OHSU KOHLER PAVILION OR 21 REMODEL 6TH FLR; MINOR DEMO, REMODEL OR 21, INSTALL EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Final | Not published | — |
| applied Jul 3 | #2025-052924-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION OR 21 REMODEL 6TH FLR; MINOR DEMO, REMODEL OR 21, INSTALL EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Final | Not published | $731K |
| applied Jun 26 | #2025-050896-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION OR 16 16TH FLR TI; MINOR DEMO, REMODEL OR 15, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Final | Not published | $970K |
| applied Jul 3 | #2025-052939-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION OR 20 REMODEL 6TH FLR; MINOR DEMO, REMODEL OR 20, INSTALL EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Final | Not published | $731K |
| applied Jun 26 | #2025-050885-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION OR 15 6TH FLR TI; MINOR DEMO, REMODEL OR 15, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Final | Not published | $963K |
| applied Jun 18 | #2025-048305-000-00-FA Facility Permit · Alteration OHSU KOLLER PAVILION LINEAR ACCELERATOR 4TH FLR TI; ALARM - RELOCATE (2) SMOKES, (1) SPEAKER STROBE RELOCATE, (1) STROBE; INSTALL VESDA SMOKE DETECTOR INSIDE VAULT. Status: Final | Not published | — |
| applied Jul 7 | #2025-053455-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION OR 22 REMODEL 6TH FLR; MINOR DEMO, REMODEL OR 22, INSTALL EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC, MED GASES FOR NEW EQUIPMENT Status: Final | Not published | — |
| applied Jul 7 | #2025-053456-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION OR 20 REMODEL 6TH FLR; MINOR DEMO, REMODEL OR 20, INSTALL EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC, MED GASES FOR NEW EQUIPMENT Status: Final | Not published | — |
| applied Jul 7 | #2025-053464-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION OR 21 REMODEL 6TH FLR; MINOR DEMO, REMODEL OR 21, INSTALL EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC, MED GASES FOR NEW EQUIPMENT Status: Final | Not published | — |
| applied Jul 3 | #2025-052920-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION OR 21 REMODEL 6TH FLR; MINOR DEMO, REMODEL OR 21, INSTALL EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jul 3 | #2025-052937-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION OR 20 REMODEL 6TH FLR; MINOR DEMO, REMODEL OR 20, INSTALL EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jul 3 | #2025-052944-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION OR 22 REMODEL 6TH FLR; MINOR DEMO, REMODEL OR 22, INSTALL EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jun 26 | #2025-050931-000-00-FA Facility Permit · Alteration power-OHSU KOHLER PAVILION OR 16 16TH FLR TI; MINOR DEMO, REMODEL OR 15, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Final | Not published | — |
| applied Jul 1 | #2025-052276-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION OR 16 16TH FLR TI; MINOR DEMO, REMODEL OR 15, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC, MED GAS Status: Final | Not published | — |
| applied Jun 26 | #2025-050916-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION OR 15 6TH FLR TI; MINOR DEMO, REMODEL OR 15, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC, MEDICAL GAS TO 4-NEW BOOMS Status: Final | Not published | — |
| applied Jun 26 | #2025-050895-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION OR 16 16TH FLR TI; MINOR DEMO, REMODEL OR 15, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jun 26 | #2025-050882-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION OR 15 6TH FLR TI; MINOR DEMO, REMODEL OR 15, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Apr 15 | #2025-029176-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOLLER PAVILION LINEAR ACCELERATOR 4TH FLR TI; ADD, RELOCATE, DEMO SPRINKLER HEADS AS NECESSARY TO ACCOMMODATE NEW TI SPACE, 4 HEADS Status: Final | Not published | $13.2K |
| applied Mar 13 | #2025-019565-000-00-FA Facility Permit · Alteration OHSU KPV OR 15 Light boom replacement Status: Issued | Not published | — |
| applied Mar 13 | #2025-019566-000-00-FA Facility Permit · Alteration power-OHSU KPV OR 15 Light boom replacement & equipment boom replacement, cable pulls Status: Final | Not published | — |
| applied Jun 11 | #2024-050261-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOLLER PAVILION LINEAR ACCELERATOR 4TH FLR TI; DEMO WALLS, REMODEL THERAPY VAULT RM, CONTROL RM, STORAGE RM, REPLACE LINEAR ACCELERATOR EQUIPMENT, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-SINK, 1-FLOOR DRAIN, 1-AIR COMPRESSOR, 1-COMPRESSED AIR TANK, 4-AIR DRIERS Status: Final | Not published | — |
| applied May 15 | #2024-042194-000-00-FA Facility Permit · Alteration power, data, nurse call, vender cabling - OHSU KOLLER PAVILION LINEAR ACCELERATOR 4TH FLR TI; DEMO WALLS, REMODEL THERAPY VAULT RM, CONTROL RM, STORAGE RM, REPLACE LINEAR ACCELERATOR EQUIPMENT, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Oct 6 | #2022-170166-000-00-CO Commercial Building Permit · Alteration OHSU New Hospital - Bridge 3 - Connection of Pedestrian Walkway 3 (Bridge) to the existing Kohler Pavilion building. Work is limited to exterior connection of the new structure at the existing building face. **18-232006-STR-01-MG** Status: Final | Not published | $150K |
| applied Jan 17 | #2024-042163-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOLLER PAVILION LINEAR ACCELERATOR 4TH FLR TI; REVISION TO LINEAR ACCELERATOR EQUIPMENT & STRUCTURAL ATTACHMENTS, CEILING, FLOORING, FINISHES, INSTALL NEW FAN COIL, DUCTWORK, PLUMB AND ELEC Status: Final | Not published | $610K |
| applied Nov 14 | #2024-097316-000-00-FA Facility Permit · Alteration power- OHSU KOHLER PAVILION BRAINLAB EXACTRAC UPGRADE RM 4136 4TH FLR; MINOR DEMO, INSTALL STRUCTURE EQUIPMENT SUPPORT AND ELEC Status: Final | Not published | — |
| applied Nov 14 | #2024-097277-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION BRAINLAB EXACTRAC UPGRADE RM 4136 4TH FLR; MINOR DEMO, INSTALL STRUCTURE EQUIPMENT SUPPORT AND ELEC Status: Final | Not published | $140K |
| applied Nov 14 | #2024-097273-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KOHLER PAVILION BRAINLAB EXACTRAC UPGRADE RM 4136 4TH FLR; MINOR DEMO, INSTALL STRUCTURE EQUIPMENT SUPPORT AND ELEC Status: Issued | Not published | — |
| applied Oct 29 | #2024-092756-000-00-FA Facility Permit · Alteration power--OHSU Garage K Security Upgrades; (3) 120V circuits for new Security Panel and convenience receptacle Status: Final | Not published | — |
| applied Oct 29 | #2024-092750-000-00-FA Facility Permit · Alteration OHSU Garage K Security Upgrades; (3) 120V circuits for new Security Panel and convenience receptacle Status: Issued | Not published | — |