Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted September 29, 2025, with 6 permits through June 26, 2026, declaring $350,000 of work.
SINGLE PDF - CHANGE OF OCCUPANCY FROM M AND S TO A FOR (2) NEW ASSEMBLY SPACES. EXPAND MEZZANINE, RELOCATE RESTROOMS, NEW EXTERIOR EXIT DOOR.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
6 permits issued Sep 29 – Jun 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 15 | #2025-005062-REV-01-CO Commercial Building Permit · Addition SINGLE PDF - NON-VALUE-ADDED REVISION TO REMOVE DFS MECHANICAL ANCHORAGE REQUIREMENTS AND SEISMIC RESTRAINT NOTES FOR MECHANICAL, PIPING, SPRINKLER, AND ELECTRICAL SYSTEMS ON SHEET S00.00. |
Status: Final
| Not published |
| — |
| applied Oct 10 | #2025-082784-000-00-ET Electrical Permit · Addition/Alteration/Replacement 1st Floor: Reconfigure lighting in assembly area, add exit signs, 4 new circuits in bar area (dishwasher, fridge, plugs), egress lighting for stairs Mezz: add convenience receptacles & additional lighting 2nd floor: Add exit signs, new upstairs restroom w/ light & fan, 3 circuit extension in… Status: Final | Not published | — |
| applied Sep 29 | #2025-005062-DFS-01-CO Commercial Building Permit · Addition SINGLE PDF - DFS FOR PREFAB STEEL SPIRAL STAIRCASE Status: Final | Not published | — |
| applied Dec 12 | #2025-099728-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) Relocating 3 Bathroom fans. Adding new mini split system. Status: Final | Not published | — |
| applied Dec 2 | #2025-097148-000-00-FS Fire Systems Permit · Alteration SPRINKLER - RELOCATE (4) SPRINKLER HEADS, ADD (5) NEW SPRINKLER HEADS AS NEEDED TO ACCOMMODATE NEW WALLS, CEILINGS AND STAIRS. Status: Final | Not published | — |
| applied Jan 24 | #2025-005062-000-00-CO Commercial Building Permit · Addition SINGLE PDF - CHANGE OF OCCUPANCY FROM M AND S TO A FOR (2) NEW ASSEMBLY SPACES. EXPAND MEZZANINE, RELOCATE RESTROOMS, NEW EXTERIOR EXIT DOOR. Status: Final | Not published | $350K |