Commercial Electrical, Hvac/Mechanical work permitted February 8, 2025, with 3 permits through June 2, 2026.
INSTALL SEISMIC GAS SHUT OFF VALVE AT THE METER ON THE COMMUNITY CENTER & ANNEX BUILDINGS.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Feb 8 – Jun 2, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied May 30 | #2026-039467-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) INSTALL SEISMIC GAS SHUT OFF VALVE AT THE METER ON THE COMMUNITY CENTER & ANNEX BUILDINGS. Status: Issued | Not published | — |
#2025-063533-000-00-ET Electrical Permit · Addition/Alteration/Replacement Install new 60amp panel; refeed 2 existing boiler pumps from new 2P1 panel; add 1 convenience receptacle from new panel; disconnect 2 existing boilers; reconnect 2 new boilers; conduct 30 day metering Status: Final |
| Not published |
| — |
| applied Dec 20 | #2024-106766-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) SINGLEPDF ¿ REPLACE EXISTING HEAT EXCHANGER AND (2) GAS BOILERS, INCLUDING PARTIAL RE-PIPING FOR NEW EQUIPMENT Status: Final | Not published | — |