Commercial General Building, Electrical, Fire Protection, Plumbing work permitted October 31, 2024, with 11 permits through September 10, 2026, declaring $4,290,840 of work.
PORT T6 PHASE III - Remove existing pavement and replace with new AC pavement section, install concrete generator pads, concrete retaining wall, oil-water separator, and stormwater improvements *** GENERATORS AND FUEL STORAGE TANKS TO BE SEPARATE PERMIT *** MECHANICAL TO BE SEPARATE PERMIT ***
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
11 permits issued Oct 31 – Sep 10, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Feb 19 | #2026-012759-000-00-ET Electrical Permit · Addition/Alteration/Replacement Install a 120/240v 1ph 100-amp panel with underground conduit from PGE's CT. Install 2 circuits from new 100-amp panel for utilization equipment (heaters) |
Status: Issued
| Not published |
| — |
| applied May 22 | #2024-052427-REV-02-CO Commercial Building Permit · New Construction PORT OF PORTLAND T6 - REV 02 - Revision to remove steel cages special inspections Status: Final | Not published | — |
| applied Jun 12 | #2026-043289-000-00-ET Electrical Permit · Addition/Alteration/Replacement Install two owner supplied emergency backup generator and ATS systems. Status: Under Inspection | Not published | — |
| applied Mar 9 | #2026-014532-000-00-CO Commercial Building Permit · New Construction PORT T6 PHASE III - Remove existing pavement and replace with new AC pavement section, install concrete generator pads, concrete retaining wall, oil-water separator, and stormwater improvements *** GENERATORS AND FUEL STORAGE TANKS TO BE SEPARATE PERMIT *** MECHANICAL TO BE SEPARATE PERMIT *** Status: Issued | Not published | $4M |
| applied Jan 2 | #2024-052427-REV-01-CO Commercial Building Permit · New Construction PORT OF PORTLAND T6 - REV-01 - Revision to add additional fire hydrants on private property required by PFB harbor master Status: Final | Not published | $250K |
| applied Jul 15 | #2025-056727-000-00-ET Electrical Permit · Addition/Alteration/Replacement ADD 1 NEW MUSCO POLE. REPLACE EXISTING FIXTURES ON (37) DIFFERENT MUSCO POLES. REPLACE WIRING BETWEEN POLES AND PANELS. REPLACE EXISTING PANELS WITH NEW. MV UPGRADE - 6 NEW SWITCHES AND CABLE. Status: Under Inspection | Not published | — |
| applied Feb 22 | #2025-013757-000-00-CO Commercial Building Permit · Alteration PORT OF PORTLAND T6 - ADMIN BLDG - Install rooftop fall protection *** w/25-013757/97/99-CO *** Status: Final | Not published | $40K |
| applied Feb 22 | #2025-013797-000-00-CO Commercial Building Permit · Alteration PORT OF PORTLAND T6 - ELECTRICAL SHOP - Install rooftop fall protection *** w/25-013757/97/99-CO *** Status: Final | Not published | $15K |
| applied Feb 22 | #2025-013799-000-00-CO Commercial Building Permit · Alteration PORT OF PORTLAND T6 - GEARLOCKER - Install rooftop fall protection *** w/25-013757/97/99-CO *** Status: Final | Not published | $15K |
| applied Dec 16 | #2024-104935-000-00-FS Fire Systems Permit · Alteration UNDERGROUND - INSTALLATION OF FIRE LINE IN PARKING LOT TO HYDRANT ASSEMBLIES Status: Final | Not published | — |
| applied Oct 28 | #2024-092365-000-00-PT Plumbing Permit · Addition/Alteration/Replacement NEW STM SYSTEM INSTALLATION Status: Final | Not published | — |