Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted March 6, 2025, with 12 permits through January 22, 2026, declaring $3,305,000 of work.
BANCROFT BUILDING TESLA TI-****1/13/25 UPDATED added new covering to existing 207 sf trash enclosure 25-003024-CO ****installation of vehicle service equipment, new offices and breakrooms, paint and prep booths. **with 23-106870-MT
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
12 permits issued Mar 6 – Jan 22, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 2 | #2023-106866-DFS-02-CO Commercial Building Permit · Alteration BANCROFT BUILDING TESLA TI-DFS-02 - Paint Booth Structural Drawings |
Status: Final
| Not published |
| — |
| applied Sep 16 | #2025-075179-000-00-ET Electrical Permit · Addition/Alteration/Replacement Reconnect exterior lights Status: Final | Not published | — |
| applied Apr 21 | #2023-106866-DFS-01-CO Commercial Building Permit · Alteration BANCROFT BUILDING TESLA TI-DFS-01- storage racking and shelvings Status: Final | Not published | — |
| applied Aug 18 | #2025-066383-000-00-FS Fire Systems Permit · Alteration ALARM - FIRE ALARM SYSTEM UPGRADE TO MEET CODE MINIMUM. POINT MONITOR IS PROVIDING NEW SILENT KNIGHT AND SYSTEM SENSOR PARTS Status: Final | Not published | — |
| applied May 8 | #2023-106866-REV-01-CO Commercial Building Permit · Alteration BANCROFT BUILDING TESLA TI-REV-01- Revisions include 1. Washbay was changed, revised plumbing (added one drain), architectural and structural. 2. Added Grade beams on structural set based upon existing conditions/findings. **Value added Revision** Status: Final | Not published | $40K |
| applied Jun 27 | #2023-106870-REV-02-MT Mechanical Permit · Addition/Alteration/Replace (MT) BANCROFT BUILDING TESLA TI -REV-02 -w. 23-106866-REV-01-CO - Paint booth stacks have been revised per city comment, setting equipment back to avoid going into design review. Status: Final | Not published | — |
| applied Mar 26 | #2023-106870-REV-01-MT Mechanical Permit · Addition/Alteration/Replace (MT) BANCROFT BUILDING TESLA TI -Sheet M2.0 was missing from permit set. This sheet has the HVAC Keynotes and a partial floor plan. Original TI permit under **w. 23-106866-CO Status: Final | Not published | — |
| applied Mar 31 | #2025-024650-000-00-ET Electrical Permit · Addition/Alteration/Replacement Fire Alarm System upgrade to code minimum. Status: Final | Not published | — |
| applied Feb 11 | #2025-010481-000-00-FS Fire Systems Permit · Alteration SPRINKLER - REWORK FOR OCCUPANCY CHANGE Status: Final | Not published | — |
| applied Jan 14 | #2025-003024-000-00-CO Commercial Building Permit · New Construction BANCROFT BUILDING TESLA TI -TRASH ENCLOSURE - w. 23-106866-CO & 23-106870-MT - new covering to enclose existing 207 sf trash area per Source Control Review requirements. Status: Final | Not published | $15K |
| applied Mar 20 | #2023-106870-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) BANCROFT BUILDING TESLA TI - **w. 23-106866-CO - Interior remodel of existing space for Tesla Collision center including front of house work, garage area and paint booth installation. Gas riser diagram in P sheets Status: Final | Not published | — |
| applied Mar 19 | #2023-106866-000-00-CO Commercial Building Permit · Alteration BANCROFT BUILDING TESLA TI-****1/13/25 UPDATED added new covering to existing 207 sf trash enclosure 25-003024-CO ****installation of vehicle service equipment, new offices and breakrooms, paint and prep booths. **with 23-106870-MT Status: Final | Not published | $3.3M |