Get ProEvery project in every city · from $79/mo
Get Procommercial project · Portland, OR
Commercial General Building, Electrical, Hvac/Mechanical, Sign work permitted February 14, 2025, with 30 permits through September 17, 2026, declaring $2,226,570 of work.
SINGLE PDF PROCESS/ ONPOINT CU STE 100 TI 2 FLRS; DEMO WALLS, NEW WALLS TO CREATE 1ST FLR - OPEN OFFICE AREAS, BREAK RM, CONF RM, WELLNESS RM, WORKRM, TELLER ROW, OFFICES, WAITING AREA, MEMBER SERVICES AREA, MEZZANINE FLR - OFFICES, OPEN OFFICE AREAS, COPY AREA, COFFEE AREA, BREAKRM, REMODEL OFFICE, CEILING, FLOORING, FINISHES, PLUMB AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
30 permits issued Feb 14 – Sep 17, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 17 | #2026-069380-000-00-FA Facility Permit · Alteration |
Menlo Digital Adding access controls to 3 doors
Status: Issued
| Not published |
| — |
| applied Sep 17 | #2026-069383-000-00-FA Facility Permit · Alteration access control- Menlo Digital Adding access controls to 3 doors Status: Final | Not published | — |
| applied Jul 30 | #2026-56388-000-00-FA Facility Permit · Master Status: Issued | Not published | — |
| applied Apr 17 | #2026-007705-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK COMMON AREA 1ST FLR TI; PER GEOFF PENA THE FOLLOWING DEVICES ARE BEING INSTALLED ON THE FIRST FLOOR AT THE UNION BANK TOWER, LOBBY (OWNER SIDE) - ADD (1) 110 CANDELA STROBE ON THE COLUMN IN THE LOBBY, MAIN LOBBY - ADD (1) BEAM DETECTOR IN THE MAIN LOBBY Status: Final | Not published | $23K |
| applied Apr 15 | #2026-027345-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ONPOINT CU STE 100 TI 2 FLRS; THE FOLLOWING DEVICES ARE BEING INSTALLED IN THE ON POINT SUITE ON THE FIRST FLOOR AND MEZZ AT THE UNION BANK TOWER AS PART OF THE CORRECTIONS REQUESTED PER GEOFF PENA ON PERMIT 25-093175-FA, ADD 1 PULL STATION AT HALLWAY EXIT NEAR THE MEN¿S… Status: Final | Not published | $45K |
| applied Mar 26 | #2025-044059-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK COMMON AREA 1ST FLR TI; VALUE ADDED REVISION TO PLACE FIRE SPRINKLERS THROUGH OUT THE MEZZANINE LVL ADDING TO THE ORIGINAL EGRESS PLAN Status: Final | Not published | $73.6K |
| applied Mar 11 | #2025-034044-REV-02-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ONPOINT CU STE 100 TI 2 FLRS; REVISION TO REMOVE DEFERRED SUBMITTAL, WALL HEIGHT CHANGES, CEILING, FINISHES AND ELEC Status: Final | Not published | $25K |
| applied Mar 10 | #2026-017000-000-00-SG Sign Permit · New Sign/Awning SINGLE PDF - NEW NONILLUMINATED 19.95 SQFT FASCIA SIGN ON THE NORTH ELEVATION Status: Final | Not published | — |
| applied Feb 17 | #2025-034044-DFS-02-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ONPOINT CU STE 100 TI 2 FLRS; DFS FOR STRUCTURAL METAL ARCH AND ANCHORAGE FOR ART SCULPTURE Status: Final | Not published | $3.5K |
| applied Feb 25 | #2025-014961-000-00-FA Facility Permit · Alteration fire alarm-LANDLORD WORK COMMON AREA 1ST FLR TI; INSTALL NEW DEMISING WALL TO CREATE COMMON AREA, REMODEL CORRIDOR, BATHRMS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Jan 30 | #2026-007705-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK COMMON AREA 1ST FLR TI; UPDATE FIRE ALARM TO INCLUDE PARTS AND SMARTS FOR 1 FIRE SPRINKLER RAMPER & 1 WATERFLOW ADDITION ON THE 1ST FLOOR Status: Final | Not published | $10.1K |
| applied Nov 14 | #2025-093175-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ONPOINT CU STE 100 TI 2 FLRS; MODIFY EXISTING FIRE ALARM SYSTEM, PROVIDE NEW DEVICES AND DEMO EXISTING DEVICES AS SHOWEN ON DRAWINGS, ALL NEW WIRING TO BE CLASS B, 1 SMOKE DETECTOR, 13 STROBES, 13 SPKRS/STROBES, 1 PULL STATION, 1 AUXILIARY PANEL Status: Final | Not published | $25.3K |
| applied Nov 5 | #2025-090592-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) SINGLEPDF - DUCTAL CHANGES, GRILLE AND DIFFUSER RELOCATIONS, SENSOR RELOCATION FOR VAVS , SPLIT SYSTEM IN SERVER RM, PASSTHROUGH RETURNS FOR OFFICE AREAS Status: Final | Not published | — |
| applied Oct 10 | #2025-034044-DFS-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ONPOINT CU STE 100 TI 2 FLRS; DFS FOR APPLIED FIRE PROOFING Status: Final | Not published | $60K |
| applied Sep 11 | #2025-074176-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ONPOINT CREDIT UNION ATM TI; INSTALL FREESTANDING ATM IN FRONT OF STOREFRONT DOOR ON EAST ELEVATION, FINISHES AND ELEC Status: Issued | Not published | $10K |
| applied May 13 | #2025-037740-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ONPOINT CU STE 100 TI 2 FLRS/ DEMO WALLS, NEW WALLS TO CREATE 1ST FLR - OPEN OFFICE AREAS, BREAK RM, CONF RM, WELLNESS RM, WORKRM, TELLER ROW, OFFICES, WAITING AREA, MEMBER SERVICES AREA, MEZZANINE FLR - OFFICES, OPEN OFFICE AREAS, COPY AREA, COFFEE AREA, BREAKRM, REMODEL… Status: Final | Not published | — |
| applied Sep 10 | #2025-034044-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ONPOINT CU STE 100 TI 2 FLRS; VALUE ADDED REVISION, NEW WALLS TO CREATE OFFICES, COPY RM, REMODEL RESTRM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $87.8K |
| applied Sep 11 | #2025-074175-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ONPOINT CREDIT UNION ATM TI; INSTALL FREESTANDING ATM IN FRONT OF STOREFRONT DOOR ON EAST ELEVATION, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Jul 28 | #2025-060506-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK EQUIPMENT PAD; INSTALL DUCTWORK AND GRILLE Status: Final | Not published | $17K |
| applied Jul 10 | #2025-055290-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK EQUIPMENT PAD; MINOR DEMO, INSTALL EQUIPMENT PAD, ANCHORAGE, BOLLARD, FLOORING AND FINISHES Status: Final | Not published | $143K |
| applied May 1 | #2025-034279-000-00-FA Facility Permit · Alteration power, data, fire alarm, access, cctv, AV, security - ONPOINT CU STE 100 TI 2 FLRS/ DEMO WALLS, NEW WALLS TO CREATE 1ST FLR - OPEN OFFICE AREAS, BREAK RM, CONF RM, WELLNESS RM, WORKRM, TELLER ROW, OFFICES, WAITING AREA, MEMBER SERVICES AREA, MEZZANINE FLR - OFFICES, OPEN OFFICE AREAS, COPY AREA,… Status: Final | Not published | — |
| applied Jun 18 | #2025-012288-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK COMMON AREA 1ST FLR TI; VALUE ADDED REVISION FOR NEW WALLS TO CREATE FIRE RISER RM, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | $9K |
| applied Jul 10 | #2025-055288-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK EQUIPMENT PAD; MINOR DEMO, INSTALL EQUIPMENT PAD, ANCHORAGE, BOLLARD, FLOORING AND FINISHES Status: Issued | Not published | — |
| applied Apr 30 | #2025-034044-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ONPOINT CU STE 100 TI 2 FLRS; DEMO WALLS, NEW WALLS TO CREATE 1ST FLR - OPEN OFFICE AREAS, BREAK RM, CONF RM, WELLNESS RM, WORKRM, TELLER ROW, OFFICES, WAITING AREA, MEMBER SERVICES AREA, MEZZANINE FLR - OFFICES, OPEN OFFICE AREAS, COPY AREA, COFFEE AREA, BREAKRM, REMODEL… Status: Final | Not published | $1.6M |
| applied Jun 4 | #2025-044059-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK COMMON AREA 1ST FLR TI; MODIFICATIONS TO EXISTING STANDPIPE SYSTEM, ADDING A NEW AUTOMATIC FIRE SPRINKLER SYSTEM TO COVER UNDER THE MEZZANINE EGRESS TO HARVEY MILK STREET ONLY, 20 HEADS. Status: Final | Not published | $23.2K |
| applied Jun 24 | #2025-049920-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK COMMON AREA 1ST FLR TI; INSTALL NEW DEMISING WALL TO CREATE COMMON AREA, REMODEL CORRIDOR, BATHRMS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-HUB DRAIN, 1-TRAP PRIMER Status: Final | Not published | — |
| applied Apr 30 | #2025-033905-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ONPOINT CU STE 100 TI 2 FLRS; DEMO WALLS, NEW WALLS TO CREATE 1ST FLR - OPEN OFFICE AREAS, BREAK RM, CONF RM, WELLNESS RM, WORKRM, TELLER ROW, OFFICES, WAITING AREA, MEMBER SERVICES AREA, MEZZANINE FLR - OFFICES, OPEN OFFICE AREAS, COPY AREA, COFFEE AREA, BREAKRM, REMODEL… Status: Issued | Not published | — |
| applied Apr 11 | #2025-028413-000-00-ET Electrical Permit · New Construction D250145 Install fiber optic cable from 5th floor Meet Me Room to 11th floor riser room and 16th floor penthouse network room. Status: Final | Not published | — |
| applied Feb 14 | #2025-012288-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK COMMON AREA 1ST FLR TI; INSTALL NEW DEMISING WALL TO CREATE COMMON AREA, REMODEL CORRIDOR, BATHRMS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $82K |
| applied Feb 14 | #2025-012287-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK COMMON AREA 1ST FLR TI; INSTALL NEW DEMISING WALL TO CREATE COMMON AREA, REMODEL CORRIDOR, BATHRMS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |