Get ProEvery project in every city · from $79/mo
Get Procommercial project · Portland, OR
Commercial General Building, Electrical, Plumbing work permitted October 31, 2024, with 46 permits through October 26, 2026, declaring $6,033,646 of work.
SINGLE PDF PROCESS/ OHSU DOERNBECHER HYBRID OR 8TH FLR TI; MINOR DEMO, NEW WALLS TO CREATE HYBRID OR, CONTROL RM, EQUIPMENT RM, RECOVERY RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
46 permits issued Oct 31 – Oct 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 26 | #2026-078972-000-00-FA Facility Permit · Alteration AV imaging/ integration - OHSU DOERNBECHER CHILDRENS HOSPITAL OR 8 8TH FLR TI Status: Final | Not published | — |
| applied Mar 4 | #2026-015931-000-00-FA Facility Permit · Alteration power-OHSU DOERNBECHER CHILDRENS HOSPITAL OR 8 8TH FLR TI; MINOR DEMO, REMODEL OR 8, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Under Inspection | Not published | — |
| applied Sep 28 | #2026-071876-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Site work that adds a yard hydrant to existing service with RP. All PVC underground piping. All outside the footprint of the building. Status: Under Inspection | Not published | — |
| applied Mar 5 | #2026-016197-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER CHILDRENS HOSPITAL OR 8 8TH FLR TI; MINOR DEMO, REMODEL OR 8, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, MEDICAL GAS FOR TWO NEW BOOMS Status: Issued | Not published | — |
| applied Sep 8 | #2026-066575-000-00-ET Electrical Permit · Addition/Alteration/Replacement Install underground electrical conduit only. Relocate 2 existing Wire Reels for Ambulance Power. Status: Final | Not published | — |
| applied Jul 22 | #2026-054135-000-00-FA Facility Permit · Alteration OR 4 & OR 5 MEDICAL GAS VALVES Status: Final | Not published | — |
| applied Jul 22 | #2026-054128-000-00-FA Facility Permit · Alteration OR 4 & OR 5 MEDICAL GAS VALVES Status: Issued | Not published | — |
| applied Mar 4 | #2026-015929-000-00-FA Facility Permit · Alteration power, data-OHSU DOERNBECHER CHILDRENS HOSPITAL OR 5 8TH FLR TI; MINOR DEMO, REMODEL OR 5, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Mar 5 | #2026-016187-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER CHILDRENS HOSPITAL OR 5 8TH FLR TI; MINOR DEMO, REMODEL OR 5, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, MEDICAL GAS FOR TWO BOOMS Status: Final | Not published | — |
| applied Mar 5 | #2026-016452-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER HVAC REPLACEMENT ROOF; INSTALL ROOFTOP EXHAUST FANS, DUCTWORK AND ELEC Status: Issued | Not published | $189K |
| applied Feb 27 | #2026-014942-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER CHILDRENS HOSPITAL OR 8 8TH FLR TI; MINOR DEMO, REMODEL OR 8, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | $150K |
| applied Feb 27 | #2026-014568-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER CHILDRENS HOSPITAL OR 5 8TH FLR TI; MINOR DEMO, REMODEL OR 5, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $150K |
| applied Mar 5 | #2026-016445-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER HVAC REPLACEMENT ROOF; INSTALL ROOFTOP EXHAUST FANS, DUCTWORK AND ELEC Status: Issued | Not published | — |
| applied Feb 27 | #2026-014940-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER CHILDRENS HOSPITAL OR 8 8TH FLR TI; MINOR DEMO, REMODEL OR 8, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Feb 26 | #2026-014566-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER CHILDRENS HOSPITAL OR 5 8TH FLR TI; MINOR DEMO, REMODEL OR 5, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jun 17 | #2024-071868-DFS-02-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER HYBRID OR 8TH FLR TI; DFS FOR MECHANICAL AND PLUMBING EQUIPMENT SEISMIC Status: Final | Not published | $5K |
| applied Aug 11 | #2024-071868-DFS-04-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER HYBRID OR 8TH FLR TI; DFS FOR METAL STUD FRAMED CEILING/SOFFITS AND ACOUSTIC SUSPENDED CEILING SYSTEMS Status: Final | Not published | $5.5K |
| applied Jun 18 | #2024-071868-DFS-03-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER HYBRID OR 8TH FLR TI; DFS FOR ELECTRICAL EQUIPMENT SEISMIC Status: Final | Not published | $2.5K |
| applied Jun 23 | #2025-040666-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER CHILDRENS HOSPITAL OR 3 TI 8TH FLR; REVISION TO RE-ROUTE MED GAS LINES Status: Final | Not published | $5K |
| applied May 27 | #2025-041403-000-00-FA Facility Permit · Alteration power - OHSU DOERNBECHER CHILDRENS HOSPITAL OR 4 TI 8TH FLR; MINOR DEMO, REMODEL OPERATING RM 4, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | — |
| applied Jun 17 | #2025-048166-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER CHILDRENS HOSPITAL OR 3 TI 8TH FLR; MINOR DEMO, REMODEL OPERATING RM 3, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES AND ELEC, MED GAS FOR NEW EQUIPMENT Status: Final | Not published | — |
| applied Jun 17 | #2025-048162-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER CHILDRENS HOSPITAL OR 4 TI 8TH FLR; MINOR DEMO, REMODEL OPERATING RM 4, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES AND ELEC, MED GAS TO NEW EQUIPMENT Status: Final | Not published | — |
| applied May 27 | #2025-041436-000-00-FA Facility Permit · Alteration power - OHSU DOERNBECHER CHILDRENS HOSPITAL OR 3 TI 8TH FLR; MINOR DEMO, REMODEL OPERATING RM 3, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | — |
| applied Jun 5 | #2025-044358-000-00-FA Facility Permit · Alteration DCH 8420B, 8526 monitors; (1) new duplex & data in 8526 and (2) new duplexes & data in 8420B for monitors Status: Issued | Not published | — |
| applied May 22 | #2025-040500-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER CHILDRENS HOSPITAL OR 4 TI 8TH FLR; MINOR DEMO, REMODEL OPERATING RM 4, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | $70K |
| applied May 22 | #2025-040666-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER CHILDRENS HOSPITAL OR 3 TI 8TH FLR; MINOR DEMO, REMODEL OPERATING RM 3, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | $70K |
| applied Jun 5 | #2025-044359-000-00-FA Facility Permit · Alteration power, data-DCH 8420B, 8526 monitors; (1) new duplex & data in 8526 and (2) new duplexes & data in 8420B for monitors Status: Final | Not published | — |
| applied May 22 | #2025-040663-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER CHILDRENS HOSPITAL OR 3 TI 8TH FLR; MINOR DEMO, REMODEL OPERATING RM 3, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES AND ELEC Status: Issued | Not published | — |
| applied May 22 | #2025-040497-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER CHILDRENS HOSPITAL OR 4 TI 8TH FLR; MINOR DEMO, REMODEL OPERATING RM 4, INSTALL NEW EQUIPMENT, CEILING, FLOORING, FINISHES AND ELEC Status: Issued | Not published | — |
| applied May 5 | #2024-071868-DFS-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER HYBRID OR 8TH FLR TI; DFS FOR CEILING STRUCTURAL CONNECTIONS Status: Final | Not published | $55K |
| applied Mar 27 | #2025-023616-000-00-FA Facility Permit · Alteration OHSU DOERNBECHER HYBRID OR 8TH FLR TI - ADD/RELOCATE SPRINKLERS FOR NEW OPERATING ROOM, EQUIPMENT ROOM, AND CONTROL ROOM IN TI Status: Final | Not published | — |
| applied Mar 26 | #2025-023391-000-00-FA Facility Permit · Alteration OHSU DCH Auto door add in corridor C09101 Status: Issued | Not published | — |
| applied Mar 26 | #2025-023397-000-00-FA Facility Permit · Alteration power - OHSU DCH Auto door add in corridor C09101. Status: Final | Not published | — |
| applied Mar 6 | #2025-017566-000-00-FA Facility Permit · Alteration DCH lower elevator lobby water leak ceiling replacement; 6 new can lights Status: Issued | Not published | — |
| applied Mar 6 | #2025-017567-000-00-FA Facility Permit · Alteration power-DCH lower elevator lobby water leak ceiling replacement; 6 new can lights Status: Final | Not published | — |
| applied Mar 6 | #2025-017554-000-00-FA Facility Permit · Alteration DCH 10 North nurse station; new duplex and data for camera monitor Status: Issued | Not published | — |
| applied Mar 6 | #2025-017555-000-00-FA Facility Permit · Alteration power, data-DCH 10 North nurse station; new duplex for camera monitor from existing circuit and data. Status: Final | Not published | — |
| applied Feb 27 | #2025-015821-000-00-FA Facility Permit · Alteration OHSU DOERNBECHER HYBRID OR 8TH FLR TI - REMOVE OR COVER EXISTING DEVICES. INSTALL NEW SMOKE DETECTORS AND STROBES. INSTALL ESD RELAYS Status: Final | Not published | — |
| applied Aug 22 | #2024-072899-000-00-FA Facility Permit · Alteration power- OHSU DOERNBECHER HYBRID OR 8TH FLR TI; MINOR DEMO, NEW WALLS TO CREATE HYBRID OR, CONTROL RM, EQUIPMENT RM, RECOVERY RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Sep 10 | #2024-078329-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER HYBRID OR 8TH FLR TI; MINOR DEMO, NEW WALLS TO CREATE HYBRID OR, CONTROL RM, EQUIPMENT RM, RECOVERY RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-SINK, 1-WC, 31-MEDICAL GAS OUTLETS Status: Final | Not published | — |
| applied Nov 21 | #2024-099579-000-00-FA Facility Permit · Alteration DCH 08311 OR 6 Power for Epic Monitor Status: Issued | Not published | — |
| applied Nov 21 | #2024-099584-000-00-FA Facility Permit · Alteration power-DCH 08311 OR 6 Power for Epic Monitor; Cut in new duplex receptacle for monitor power from existing circuit Status: Final | Not published | — |
| applied Aug 20 | #2024-071869-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER HYBRID OR 8TH FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS, FAN COIL UNIT, TERMINAL UNITS, MED GAS, PIPING AND ELEC Status: Final | Not published | $773K |
| applied Aug 20 | #2024-071868-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU DOERNBECHER HYBRID OR 8TH FLR TI; MINOR DEMO, NEW WALLS TO CREATE HYBRID OR, CONTROL RM, EQUIPMENT RM, RECOVERY RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $4.8M |
| applied Oct 31 | #2024-093810-000-00-FA Facility Permit · Alteration power-DCH fuel shed; provided 2 new life safety 120V 20A circuits. for frost protection and air drier Status: Final | Not published | — |
| applied Oct 31 | #2024-093803-000-00-FA Facility Permit · Alteration DCH fuel shed; provided 2 new life safety 120V 20A circuits. for frost protection and air drier Status: Issued | Not published | — |