Get ProEvery project in every city · from $79/mo
Get Procommercial project · Portland, OR
Commercial General Building, Electrical work permitted December 12, 2024, with 88 permits through September 30, 2026, declaring $2,586,547 of work.
SINGLE PDF PROCESS/ AMERICAN FIDUCIARY SERVICE STE 1550 15TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RMS, DOCUMENT STORAGE, MISC RM, STORAGE RM, SUPPLIES RM, RECEPTION AREA, OPEN OFFICE AREA, BREAKRM, OFFICES, CEILING, FLOORING, FINISHES, PLUMB AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
88 permits issued Dec 12 – Sep 30, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 10 | #2025-085714-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 400 4TH FLR TI; REVISION TO CONVERT SPEC SUITE TO TENANT WFG, RECONFIGURE ENTIRE SUITE, NEW WALLS TO CREATE OFFICES, WORKRM, BREAKRM, PHONE RM, STORAGE RM, CONFERENCE RMS, ENTRY AREA, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued |
| Not published |
| $170K |
| applied May 13 | #2026-035004-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK WHITE BOX STE 1000 10TH FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS AND ELEC Status: Final | Not published | $2.5K |
| applied May 5 | #2026-032372-000-00-FA Facility Permit · Alteration hvac control - LANDLORD WORK WHITE BOX STE 1000 10TH FLR TI; DEMO WALLS, NO OCCUPANCY THIS PERMIT, RETURN SPACE TO SHELL CONDITION FOR FUTURE TENANT BUILD OUT, REMODEL COMMON AREA BATHRMS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Nov 6 | #2025-090785-000-00-FA Facility Permit · Alteration power, fire alarm - LANDLORD WORK SPEC SUITE 330 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE BREAKRM, OFFICES, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Mar 30 | #2026-022617-000-00-FA Facility Permit · Alteration hvac control - LANDLORD WORK SPEC SUITE 330 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE BREAKRM, OFFICES, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Mar 30 | #2026-022621-000-00-FA Facility Permit · Alteration hvac control - LANDLORD WORK SPEC SUITE 325 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE BREAK AREA, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Mar 30 | #2026-022587-000-00-FA Facility Permit · Alteration hvac control - LANDLORD WORK SPEC SUITE 400 4TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY AREA, CONFERENCE RMS, OFFICES, PHONE RM, STORAGE RM, COPY RM, BREAK AREA, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Mar 30 | #2026-022586-000-00-FA Facility Permit · Alteration hvac control - LANDLORD WORK SPEC SUITE 420 4TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY/BREAK AREA, STORAGE/IT RM, CONFERENCE RM, OFFICES, COPY RM, PHONE RMS, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Mar 30 | #2026-022581-000-00-FA Facility Permit · Alteration hvac control - LANDLORD WORK SPEC SUITE 1525 15TH FLR TI; DEMO WALLS, NEW DEMISING WALL TO CREATE TENANT SUITE & CORRIDOR, ENTRY, BREAK AREA, CONFERENCE RM, PHONE RM, IT RM, WORK RM, OFFICES, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Mar 30 | #2026-022580-000-00-FA Facility Permit · Alteration hvac controls - LANDLORD WORK SPEC SUITE 1540 15TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY, CONFERENCE RM, OFFICES, BREAK AREA, PHONE RM, IT RM, WORK RM, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Oct 29 | #2025-088486-000-00-FA Facility Permit · Alteration power, fire alarm - LANDLORD WORK SPEC SUITE 400 4TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY AREA, CONFERENCE RMS, OFFICES, PHONE RM, STORAGE RM, COPY RM, BREAK AREA, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Under Inspection | Not published | — |
| applied Oct 30 | #2025-088774-000-00-FA Facility Permit · Alteration power, fire alarm - LANDLORD WORK SPEC SUITE 420 4TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY/BREAK AREA, STORAGE/IT RM, CONFERENCE RM, OFFICES, COPY RM, PHONE RMS, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Mar 13 | #2026-018704-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 330 3RD FLR TI; ALTERATIONS TO THE EXISTING EST SYSTEM TO SUPPORT LANDLORD IMPROVEMENT, 2 HORNS/STROBES, 1 ADDRESSABLE RELAY Status: Final | Not published | $11.2K |
| applied Mar 13 | #2026-018698-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 1540 15TH FLR TI; ALTERATIONS TO THE EXISTING EST SYSTEM TO SUPPORT LANDLORD IMPROVEMENT, 8 HORNS/STROBES Status: Final | Not published | $13.7K |
| applied Mar 13 | #2026-018688-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 420 4TH FLR TI; ALTERATIONS TO THE EXISTING EST SYSTEM TO SUPPORT LANDLORD IMPROVEMENT, 8 STROBES, 5 HORNS/STROBES, 1 ADDRESSABLE RELAY Status: Final | Not published | $13.8K |
| applied Mar 13 | #2026-018677-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 400 4TH FLR TI; ALTERATIONS TO THE EXISTING EST SYSTEM TO SUPPORT LANDLORD IMPROVEMENT, 11 STROBES, 9 HORNS/STROBES, 1 AUXILIARY PANEL, 1 ADDRESSABLE RELAY Status: Issued | Not published | $17.6K |
| applied Mar 13 | #2026-018655-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK WHITE BOX STE 1000 10TH FLR TI; ALTERATIONS TO THE EXISTING EST SYSTEM TO SUPPORT LANDLORD IMPROVEMENT, 12 HORNS/STROBES Status: Final | Not published | $19.1K |
| applied Mar 13 | #2026-018708-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 1525 15TH FLR TI; ALTERATIONS TO THE EXISTING EST SYSTEM TO SUPPORT LANDLORD IMPROVEMENT, 8 HORNS/STROBES Status: Final | Not published | $18.7K |
| applied Mar 13 | #2026-018595-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 325 3RD FLR TI; ALTERATIONS TO THE EXISTING EST SYSTEM TO SUPPORT LANDLORD IMPROVEMENT, 1 HORNS/STROBES, 1 ADDRESSABLE RELAY Status: Final | Not published | $11.1K |
| applied Mar 11 | #2026-017896-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 325 3RD FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS AND ELEC Status: Final | Not published | $1.4K |
| applied Mar 11 | #2026-017899-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 330 3RD FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS AND ELEC Status: Final | Not published | $6.1K |
| applied Mar 11 | #2026-017903-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 400 4TH FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS, EXHAUST FAN AND ELEC Status: Under Inspection | Not published | $19.2K |
| applied Mar 11 | #2026-017910-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 420 4TH FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS AND ELEC Status: Final | Not published | $12.8K |
| applied Mar 11 | #2026-017930-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 1540 15TH FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS, EXHAUST FAN AND ELEC Status: Final | Not published | $8.6K |
| applied Mar 11 | #2026-017916-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 1525 15TH FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS, EXHAUST FAN AND ELEC Status: Final | Not published | $8.8K |
| applied Mar 9 | #2026-017033-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK WHITE BOX STE 1000 10TH FLR TI; RELOCATE AND/OR ADD FIRE SPRINKLERS TO ACCOMMODATE TENANT IMPROVEMENT, 16 HEADS Status: Final | Not published | $3.6K |
| applied Mar 3 | #2026-015761-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 420 4TH FLR TI; RELOCATE AND/OR ADD FIRE SPRINKLERS TO ACCOMMODATE TENANT IMPROVEMENT, 21 HEADS Status: Final | Not published | $7K |
| applied Mar 3 | #2026-015757-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 400 4TH FLR TI; RELOCATE AND/OR ADD FIRE SPRINKLERS TO ACCOMMODATE TENANT IMPROVEMENT, 35 HEADS Status: Issued | Not published | $12.3K |
| applied Mar 3 | #2026-015766-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 1525 15TH FLR TI; RELOCATE AND/OR ADD FIRE SPRINKLERS TO ACCOMMODATE TENANT IMPROVEMENT, 25 HEADS Status: Final | Not published | $6.3K |
| applied Mar 3 | #2026-015768-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 1540 15TH FLR TI; RELOCATE AND/OR ADD FIRE SPRINKLERS TO ACCOMMODATE TENANT IMPROVEMENT, 22 HEADS Status: Final | Not published | $6K |
| applied Mar 3 | #2026-015746-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 330 3RD FLR TI; RELOCATE AND/OR ADD FIRE SPRINKLERS TO ACCOMMODATE TENANT IMPROVEMENT, 8 HEADS Status: Final | Not published | $2.6K |
| applied Mar 3 | #2026-015744-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 325 3RD FLR TI; RELOCATE AND/OR ADD FIRE SPRINKLERS TO ACCOMMODATE TENANT IMPROVEMENT, 4 HEADS Status: Final | Not published | $1.3K |
| applied Feb 11 | #2026-010613-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ACHIEVE TMS STE 540 5TH FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS, EXHAUST FAN AND ELEC Status: Final | Not published | $25K |
| applied Feb 3 | #2026-008314-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ACHIEVE TMS STE 540 5TH FLR TI; INSTALL ADA SYNCHRONIZED NOTIFICATION DEVICES IN SUITE 540 PER PLANS, 3 SPEAKER STROBES Status: Final | Not published | $1.2K |
| applied Oct 30 | #2025-088772-000-00-FA Facility Permit · Alteration power - LANDLORD WORK SPEC SUITE 1540 15TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY, CONFERENCE RM, OFFICES, BREAK AREA, PHONE RM, IT RM, WORK RM, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Oct 29 | #2025-088551-000-00-FA Facility Permit · Alteration power - LANDLORD WORK SPEC SUITE 1525 15TH FLR TI; DEMO WALLS, NEW DEMISING WALL TO CREATE TENANT SUITE & CORRIDOR, ENTRY, BREAK AREA, CONFERENCE RM, PHONE RM, IT RM, WORK RM, OFFICES, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Oct 22 | #2025-086383-000-00-FA Facility Permit · Alteration power, fire alarm - LANDLORD WORK SPEC SUITE 325 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE BREAK AREA, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Oct 27 | #2025-087691-000-00-FA Facility Permit · Alteration power, fire alarm - LANDLORD WORK WHITE BOX STE 1000 10TH FLR TI; DEMO WALLS, NO OCCUPANCY THIS PERMIT, RETURN SPACE TO SHELL CONDITION FOR FUTURE TENANT BUILD OUT, REMODEL COMMON AREA BATHRMS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Nov 3 | #2025-089677-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 400 4TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY AREA, CONFERENCE RMS, OFFICES, PHONE RM, STORAGE RM, COPY RM, BREAK AREA, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, DEMO 11-SINKS, 2-SHOWERS, 1-WC, 3-LAVS, INSTALL 1-INSTA-HOT,… Status: Under Inspection | Not published | — |
| applied Nov 3 | #2025-089698-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 420 4TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY/BREAK AREA, STORAGE/IT RM, CONFERENCE RM, OFFICES, COPY RM, PHONE RMS, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-SINK, 1-DISHWASHER, 1-INSTA-HOT, 1-SUPPLY BOX, 1-WATER HEATER,… Status: Final | Not published | — |
| applied Nov 3 | #2025-089691-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 1525 15TH FLR TI; DEMO WALLS, NEW DEMISING WALL TO CREATE TENANT SUITE & CORRIDOR, ENTRY, BREAK AREA, CONFERENCE RM, PHONE RM, IT RM, WORK RM, OFFICES, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-SINK, 1-DISHWASHER, 1-SUPPLY BOX,… Status: Final | Not published | — |
| applied Nov 5 | #2025-090168-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK WHITE BOX STE 1000 10TH FLR TI; DEMO WALLS, NO OCCUPANCY THIS PERMIT, RETURN SPACE TO SHELL CONDITION FOR FUTURE TENANT BUILD OUT, REMODEL COMMON AREA BATHRMS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 6-WC, 4-LAVS, 2-URINALS Status: Final | Not published | — |
| applied Nov 3 | #2025-089657-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 325 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE BREAK AREA, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-SINK, 1-DISHWASHER, 1-INSTA-HOT, 1-WATER HEATER, 1-HUB DRAIN, 1-TRAP PRIMER Status: Final | Not published | — |
| applied Nov 3 | #2025-089682-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 1540 15TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY, CONFERENCE RM, OFFICES, BREAK AREA, PHONE RM, IT RM, WORK RM, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-WATER HEATER, 1-HUB DRAIN, 1-TRAP PRIMER, 1-INSTA-HOT, 1-SUPPLY BOX,… Status: Final | Not published | — |
| applied Nov 5 | #2025-090155-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 330 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE BREAKRM, OFFICES, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-INSTA-HOT, 1-SUPPLY BOX, 1-DISHWASHER, 1-SINK, 1-HUB DRAIN, 1-TRAP PRIMER, 1-WATER HEATER Status: Final | Not published | — |
| applied Nov 24 | #2025-095473-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ACHIEVE TMS STE 540 5TH FLR TI; DEMO WALL, NEW WALLS TO CREATE OFFICES, COPY ALCOVE, IT ROOM, BREAKRM, REMODEL OFFICES, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-SINK, 1-DISHWASHER, 1-SUPPLY BOX Status: Final | Not published | — |
| applied Jan 5 | #2026-000913-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ACHIEVE TMS STE 540 5TH FLR TI; RELOCATE SPRINKLERS FOR NEW TENANT IMPROVEMENT, 12 HEADS Status: Final | Not published | $2.4K |
| applied Dec 3 | #2025-097307-000-00-FA Facility Permit · Alteration power, fire alarm - ACHIEVE TMS STE 540 5TH FLR TI; DEMO WALL, NEW WALLS TO CREATE OFFICES, COPY ALCOVE, IT ROOM, BREAKRM, REMODEL OFFICES, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Nov 12 | #2025-092293-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ACHIEVE TMS STE 540 5TH FLR TI; DEMO WALL, NEW WALLS TO CREATE OFFICES, COPY ALCOVE, IT ROOM, BREAKRM, REMODEL OFFICES, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $195K |
| applied Oct 21 | #2025-085719-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 1540 15TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY, CONFERENCE RM, OFFICES, BREAK AREA, PHONE RM, IT RM, WORK RM, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $214K |
| applied Oct 21 | #2025-085699-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 325 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE BREAK AREA, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $65.3K |
| applied Oct 21 | #2025-085714-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 400 4TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY AREA, CONFERENCE RMS, OFFICES, PHONE RM, STORAGE RM, COPY RM, BREAK AREA, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Under Inspection | Not published | $320K |
| applied Oct 21 | #2025-085722-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 1525 15TH FLR TI; DEMO WALLS, NEW DEMISING WALL TO CREATE TENANT SUITE & CORRIDOR, ENTRY, BREAK AREA, CONFERENCE RM, PHONE RM, IT RM, WORK RM, OFFICES, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $214K |
| applied Oct 21 | #2025-085733-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 420 4TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY/BREAK AREA, STORAGE/IT RM, CONFERENCE RM, OFFICES, COPY RM, PHONE RMS, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $220K |
| applied Oct 21 | #2025-085741-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 330 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE BREAKRM, OFFICES, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $97.4K |
| applied Oct 21 | #2025-085750-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK WHITE BOX STE 1000 10TH FLR TI; DEMO WALLS, NO OCCUPANCY THIS PERMIT, RETURN SPACE TO SHELL CONDITION FOR FUTURE TENANT BUILD OUT, REMODEL COMMON AREA BATHRMS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $393K |
| applied Nov 12 | #2025-092286-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ACHIEVE TMS STE 540 5TH FLR TI; DEMO WALL, NEW WALLS TO CREATE OFFICES, COPY ALCOVE, IT ROOM, BREAKRM, REMODEL OFFICES, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Oct 21 | #2025-085748-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK WHITE BOX STE 1000 10TH FLR TI; DEMO WALLS, NO OCCUPANCY THIS PERMIT, RETURN SPACE TO SHELL CONDITION FOR FUTURE TENANT BUILD OUT, REMODEL COMMON AREA BATHRMS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Oct 21 | #2025-085739-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 330 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE BREAKRM, OFFICES, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Oct 21 | #2025-085731-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 420 4TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY/BREAK AREA, STORAGE/IT RM, CONFERENCE RM, OFFICES, COPY RM, PHONE RMS, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Oct 21 | #2025-085721-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 1525 15TH FLR TI; DEMO WALLS, NEW DEMISING WALL TO CREATE TENANT SUITE & CORRIDOR, ENTRY, BREAK AREA, CONFERENCE RM, PHONE RM, IT RM, WORK RM, OFFICES, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Oct 21 | #2025-085718-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 1540 15TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY, CONFERENCE RM, OFFICES, BREAK AREA, PHONE RM, IT RM, WORK RM, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Oct 21 | #2025-085704-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 400 4TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY AREA, CONFERENCE RMS, OFFICES, PHONE RM, STORAGE RM, COPY RM, BREAK AREA, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Oct 21 | #2025-085694-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITE 325 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE BREAK AREA, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Oct 10 | #2025-082765-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ CHICAGO TITLE STE 500 5TH FLR TI; INSTALL ADA SYNCHRONIZED NOTIFICATION DEVICES IN SUITE 500 PER PLANS, 3 STROBES, 5 SPEAKER STROBES Status: Final | Not published | $3.2K |
| applied Sep 17 | #2025-075745-000-00-FA Facility Permit · Alteration data-CHICAGO TITLE STE 500 5TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE OFFICES, CONFERENCE RMS, RECEPTION AREA, WORKRM, STORAGE RM, BREAKRM, IT RM, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Aug 19 | #2025-067125-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ CHICAGO TITLE STE 500 5TH FLR TI; INSTALL EXHAUST FAN, DUCTWORK, DIFFUSERS, GRILLES AND ELEC Status: Final | Not published | $16.4K |
| applied Sep 10 | #2025-073623-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ CHICAGO TITLE STE 500 5TH FLR TI; RELOCATE SPRINKLERS FOR NEW TENANT IMPROVEMENT, 14 HEADS Status: Final | Not published | $2.9K |
| applied Aug 26 | #2025-056953-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ CHICAGO TITLE STE 500 5TH FLR TI; REVISION TO ADD BOX BEAM HEADER TO PLAN SET Status: Final | Not published | — |
| applied Sep 4 | #2025-071753-000-00-ET Electrical Permit · Addition/Alteration/Replacement Install low voltage cabling for voice/data & access control systems for American Fiduciary at 700 NE Multnomah St. Suite 1550, Portland OR 97232. Status: Final | Not published | — |
| applied Aug 21 | #2025-067808-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ AMERICAN FIDUCIARY SERVICE STE 1550 15TH FLR TI; RELOCATE ADA SYNCHRONIZED NOTIFICATION DEVICES IN SUITE 1550 PER PLANS, 3 STROBES, 5 SPEAKER STROBES Status: Final | Not published | $3.2K |
| applied Jul 21 | #2025-058105-000-00-FA Facility Permit · Alteration power, fire alarm - CHICAGO TITLE STE 500 5TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE OFFICES, CONFERENCE RMS, RECEPTION AREA, WORKRM, STORAGE RM, BREAKRM, IT RM, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Aug 11 | #2025-064645-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ AMERICAN FIDUCIARY SERVICE STE 1550 15TH FLR TI; RELOCATE AND /OR ADD FIRE SPRINKLERS TO ACCOMMODATE TENANT IMPROVEMENT, 27 HEADS Status: Final | Not published | $6.2K |
| applied Jul 31 | #2025-061742-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ AMERICAN FIDUCIARY SERVICE STE 1550 15TH FLR TI; INSTALL DUCTWORK, DIFFUSERS, GRILLES AND ELEC Status: Final | Not published | $26.4K |
| applied Jul 16 | #2025-056953-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ CHICAGO TITLE STE 500 5TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE OFFICES, CONFERENCE RMS, RECEPTION AREA, WORKRM, STORAGE RM, BREAKRM, IT RM, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $160K |
| applied Jul 16 | #2025-056950-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ CHICAGO TITLE STE 500 5TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE OFFICES, CONFERENCE RMS, RECEPTION AREA, WORKRM, STORAGE RM, BREAKRM, IT RM, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jun 9 | #2025-045459-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ AMERICAN FIDUCIARY SERVICE STE 1550 15TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RMS, DOCUMENT STORAGE, MISC RM, STORAGE RM, SUPPLIES RM, RECEPTION AREA, OPEN OFFICE AREA, BREAKRM, OFFICES, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-SINK, 1-DISHWASHER, 1-INSTA… Status: Final | Not published | — |
| applied May 29 | #2025-042392-000-00-FA Facility Permit · Alteration power, fire alarm, data - AMERICAN FIDUCIARY SERVICE STE 1550 15TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RMS, DOCUMENT STORAGE, MISC RM, STORAGE RM, SUPPLIES RM, RECEPTION AREA, OPEN OFFICE AREA, BREAKRM, OFFICES, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied May 29 | #2025-042326-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ AMERICAN FIDUCIARY SERVICE STE 1550 15TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RMS, DOCUMENT STORAGE, MISC RM, STORAGE RM, SUPPLIES RM, RECEPTION AREA, OPEN OFFICE AREA, BREAKRM, OFFICES, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $429K |
| applied May 29 | #2025-042181-000-00-FA Facility Permit · Alteration power, data, a/v - NEEA STE 1300 13TH FLR TI; MINOR DEMO, NEW WALLS TO CREATE OFFICES, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | — |
| applied May 29 | #2025-042362-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ NEEA STE 1300 13TH FLR TI; RELOCATE SPRINKLERS FOR NEW WALL IN TENANT IMPROVEMENT, 1 HEAD Status: Final | Not published | $1.5K |
| applied May 29 | #2025-042321-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ AMERICAN FIDUCIARY SERVICE STE 1550 15TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RMS, DOCUMENT STORAGE, MISC RM, STORAGE RM, SUPPLIES RM, RECEPTION AREA, OPEN OFFICE AREA, BREAKRM, OFFICES, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied May 12 | #2025-037277-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ NEEA STE 1300 13TH FLR TI; MINOR DEMO, NEW WALLS TO CREATE OFFICES, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | $30K |
| applied May 13 | #2025-037529-000-00-ET Electrical Permit · Addition/Alteration/Replacement Install low voltage cable for keypad entry w/door lock and egress. Status: Final | Not published | — |
| applied May 12 | #2025-037272-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ NEEA STE 1300 13TH FLR TI; MINOR DEMO, NEW WALLS TO CREATE OFFICES, CEILING, FLOORING, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Dec 12 | #2024-104577-000-00-FA Facility Permit · Alteration power - CRITFC HVAC 12TH FLR; INSTALL EXHAUST FAN, DUCTWORK, GRILLE AND ELEC , Install one new wall receptacle in each of three conference rooms for wall mounted TV's. Replace existing 1x1 ceiling lights over receptions area with new 2x2 ceiling lights. Status: Final | Not published | — |
| applied Dec 12 | #2024-104474-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ CRITFC HVAC 12TH FLR; INSTALL EXHAUST FAN, DUCTWORK, GRILLE AND ELEC Status: Final | Not published | $4.2K |
| applied Dec 12 | #2024-104470-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ CRITFC HVAC 12TH FLR; INSTALL EXHAUST FAN, DUCTWORK, GRILLE AND ELEC Status: Issued | Not published | — |