Commercial Electrical work permitted March 6, 2025, with 2 permits through June 23, 2025.
PDOX REVISON TO MOVE ELECTRICAL CONNECTION FOR THE 100HP MIXER FROM MAIN SWITCHBOARD MSB TO MCC-1. SHEET E0.01: REVISED ONE-LINE DIAGRAM. REMOVED 1200AMP MAIN (DOES NOT EXIST) FROM MSB, ADDED 100HP MIXER TO MCC-1. ADDED LOAD CALCULATION WITH LOAD BASED ON 30-DAY AMMETER RECORDING. SHEET E0.02: REVISED PANEL SCHEDULES. REMOVED 100HP MIXER FROM MSB AND ADDED IT TO MCC-1. SHEET E1.00: 100HP DISCONNECT SWITCH AND VFD SHOWN IN MAIN ELECTRICAL ROOM. SHEET E3.00: ADDED CIRCUIT TO 100HP MIXER FROM MCC-1
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Mar 6 – Jun 23, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 18 | #2025-009311-REV-01-ET Electrical Permit · Addition/Alteration/Replacement PDOX REVISON TO MOVE ELECTRICAL CONNECTION FOR THE 100HP MIXER FROM MAIN SWITCHBOARD MSB TO MCC-1. SHEET E0.01: REVISED ONE-LINE DIAGRAM. REMOVED 1200AMP MAIN (DOES NOT EXIST) FROM MSB, ADDED 100HP MIXER TO MCC-1. ADDED LOAD CALCULATION WITH LOAD BASED ON 30-DAY AMMETER RECORDING. SHEET E0.02:… |
Status: Under Inspection
| Not published |
| — |
| applied Mar 6 | #2025-017545-000-00-ET Electrical Permit · Addition/Alteration/Replacement Remove damaged Motor starter and replace with VFD. Status: Final | Not published | — |