Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted December 17, 2024, with 15 permits through October 21, 2026, declaring $55,000 of work.
SINGLE PDF: TI FOR EXISTING WAREHOUSE TENANT TO MODIFY OFFICE SPACE. INCLUDES DEMO OF INTERIOR WALLS AND ADD NEW TO CREATE OFFICE SPACES, SEATING AREA, AND KITCHENETTE. ADD VERTICAL GRAB BARS TO EXISTING RESTROOMS.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
15 permits issued Dec 17 – Oct 21, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 21 | #2026-078128-000-00-ET Electrical Permit · Addition/Alteration/Replacement |
low voltage cabling for cameras and card access
Status: Issued
| Not published |
| — |
| applied Oct 12 | #2026-075502-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Installation of new 1-1/2" Water Line off of existing future valve to serve process equipment. Includes installation of new RPBA assembly (Building Permit Reference: 26-048272-000-00-CO) Status: Issued | Not published | — |
| applied Oct 8 | #2026-074771-000-00-ET Electrical Permit · Addition/Alteration/Replacement Install (1) 75kva step down transfer to feed (4) skids Status: Issued | Not published | — |
| applied Jun 7 | #2026-041512-000-00-ET Electrical Permit · Addition/Alteration/Replacement PROVIDE UPSIZE OF EXISTING FEEDER, DISCONNECT & MAIN BREAKER FOR NEW COMPRESSOR Status: Issued | Not published | — |
| applied Apr 7 | #2026-024889-000-00-ET Electrical Permit · Addition/Alteration/Replacement INSTALL (2) 120V, 20AMP CIRCUITS WITH RECEPTACLES FOR SPINNER WASHERS. Status: Final | Not published | — |
| applied Feb 13 | #2026-011303-000-00-ET Electrical Permit · Addition/Alteration/Replacement PROVIDE & INSTALL (2) 20AMP RECEPTACLES AND EXTEND EXISTING 100AMP FEEDER FOR A NEW HEATED POWER WASHER ALONG WITH INSTALL OF (2) GFI 120V CIRCUITS Status: Final | Not published | — |
| applied May 9 | #2025-036770-000-00-ET Electrical Permit · Addition/Alteration/Replacement low voltage for HVAC- 25-029157-MT thermostat Status: Final | Not published | — |
| applied Apr 15 | #2025-029157-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) SINGLEPDF - PROVIDE AND INSTALL NEW ROOFTOP GASPACK UNIT ON NEW FACTORY CURB: USE CURB CLIPS: PROVIDE AND INSTALL NEW ROOFTOP GASPACK UNIT ON EXISTING CURB REPLACING LARGER RTU: NEW ROOF MOUNT EXHAUST FAN FOR KITCHENETTE AREA; DUCTING AND AIR DISTRIBUTION AS DRAWN; GAS PIPING TO NEW RTU FROM… Status: Final | Not published | — |
| applied Mar 18 | #2025-021111-000-00-ET Electrical Permit · Addition/Alteration/Replacement New break room Status: Final | Not published | — |
| applied Mar 14 | #2025-020164-000-00-FS Fire Systems Permit · Alteration SPRINKLER - ADD (2) AND RELOCATE (1) TO ACCOMMODATE TENANT FLOOR PLAN. Status: Final | Not published | — |
| applied Feb 13 | #2025-011207-000-00-CO Commercial Building Permit · Alteration SINGLE PDF: TI FOR EXISTING WAREHOUSE TENANT TO MODIFY OFFICE SPACE. INCLUDES DEMO OF INTERIOR WALLS AND ADD NEW TO CREATE OFFICE SPACES, SEATING AREA, AND KITCHENETTE. ADD VERTICAL GRAB BARS TO EXISTING RESTROOMS. Status: Final | Not published | $55K |
| applied Mar 7 | #2025-017966-000-00-PT Plumbing Permit · Addition/Alteration/Replacement PENTAGON NEW BREAKROOM PLUMBING TIE TO BUILDING PERMIT 2025-011207-000-00-CO Status: Final | Not published | — |
| applied Jan 10 | #2025-002250-000-00-ET Electrical Permit · Addition/Alteration/Replacement Provide power to new 40T Chiller located on the roof. (1) 100A Feeder. Without Service. Status: Final | Not published | — |
| applied Dec 19 | #2024-106417-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) SINGLEPDF ¿ INSTALL 40 TON PROCESS CHILLER AND UPSIZE EXISTING PROCESS PIPING MAIN Status: Final | Not published | — |
| applied Dec 17 | #2024-105669-000-00-ET Electrical Permit · Addition/Alteration/Replacement PROVIDE CONNECTION TO (2) NEW RETIFIERS. Status: Final | Not published | — |