Get Procommercial project · Portland, OR
Commercial Electrical, Hvac/Mechanical work permitted November 26, 2024, with 6 permits through June 22, 2026.
INSTALL SEISMIC GAS SHUTOFF VALVE AT THE METER.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
6 permits issued Nov 26 – Jun 22, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 15 | #2026-043768-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) INSTALL SEISMIC GAS SHUTOFF VALVE AT THE METER. Status: Issued | Not published | — |
| applied Sep 8 |
#2025-072589-000-00-ET Electrical Permit · Addition/Alteration/Replacement Installing intrusion system Status: Final |
| Not published |
| — |
| applied Jun 24 | #2025-049710-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) SINGLEPDF - REMOVE (1) BOILER, REPLACE IT WITH (2) CONDENSING BOILERS Status: Final | Not published | — |
| applied Apr 23 | #2025-032098-000-00-ET Electrical Permit · Addition/Alteration/Replacement LIMITED ENERGY CABLING FOR DIGITAL ANTENNAE SYSTEM INSTALL Status: Final | Not published | — |
| applied Feb 12 | #2024-013575-REV-01-ET Electrical Permit · Addition/Alteration/Replacement PDOX REVISION TO PANEL H1D AND IT'S FEEDER WAS CHANGED FROM 400A TO 800A Status: Final | Not published | — |
| applied Nov 26 | #2024-100510-000-00-ET Electrical Permit · Addition/Alteration/Replacement Horizontal Cabling, MDF/IDF buildout, Backbone Copper/Fiber Status: Final | Not published | — |