Commercial General Building, Electrical, Fire Protection work permitted July 16, 2025, with 20 permits through August 26, 2026, declaring $1,696,255 of work.
SINGLE PDF PROCESS/ PPS BENSON HS ROOF REPAIR; MINOR DEMO OF ROOF SECTIONS BLDG D, E, G1, INSTALL INSULATION AT PARAPETS, REROOF AFFECTED AREAS AND FINISHES
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
20 permits issued Jul 16 – Aug 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 26 | #2026-063804-000-00-ET Electrical Permit · Addition/Alteration/Replacement Benson High School - Low Volt/CCTV ¿ Addition to several Camera Locations Status: Issued | Not published | — |
| applied Aug 26 | #2026-063806-000-00-ET Electrical Permit · Addition/Alteration/Replacement Benson High School - Fire Alarm ¿ Addition of a couple of door stops Status: Issued | Not published | — |
| applied Aug 26 | #2026-063801-000-00-ET Electrical Permit · Addition/Alteration/Replacement Benson High School - Additions to a existing electrical Systems (2 additional circuits) Status: Issued | Not published | — |
| applied Jul 1 | #2026-048716-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPS BENSON HS FIRE SPRINKLER UPGRADE; INSPECTION CORRECTION, HEADS UNDER OBSTRUCTIONS, 9 HEADS Status: Final | Not published | $2.3K |
| applied Jul 8 | #2026-050312-000-00-FA Facility Permit · Alteration fire alarm-PPS Benson HS-Modify existing Fire alarm system & emergency control functions with other building systems Status: Issued | Not published | — |
| applied Jun 15 | #2026-043693-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPS BENSON HS MODERIZATION FOLLOW UP TI ALL FLRS; EXTERIOR EXTEND SIDEWALK, MINOR DEMO, REMODEL CUSTODIAL RMS, VESTIBULE, ALUMNI RMS, PAINT/STORAGE RM, TECH GEOMETRY RM, CHEMISTRY RMS, SCIENCE PREP AREAS, CHEMICAL STORAGE RMS, PATTERN MAKING SHOP, RECEPTION/WAITING RM, ACTIVITY… Status: Issued | Not published | $400K |
| applied Jun 15 | #2026-043695-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPS BENSON HS MODERIZATION FOLLOW UP TI ALL FLRS; INSTALL DUCTWORK, GRILLES, DIFFUSERS, DAMPERS AND ELEC Status: Issued | Not published | $60K |
| applied Jul 8 | #2026-050310-000-00-FA Facility Permit · Alteration PPS Benson HS-Modify existing Fire alarm system & emergency control functions with other building systems Status: Issued | Not published | — |
| applied Jul 1 | #2026-048712-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPS BENSON HS FIRE SPRINKLER UPGRADE; INSPECTION CORRECTION, HEADS UNDER OBSTRUCTIONS, 9 HEADS Status: Issued | Not published | — |
| applied Jun 15 | #2026-043691-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPS BENSON HS MODERIZATION FOLLOW UP TI ALL FLRS; EXTERIOR EXTEND SIDEWALK, MINOR DEMO, REMODEL CUSTODIAL RMS, VESTIBULE, ALUMNI RMS, PAINT/STORAGE RM, TECH GEOMETRY RM, CHEMISTRY RMS, SCIENCE PREP AREAS, CHEMICAL STORAGE RMS, PATTERN MAKING SHOP, RECEPTION/WAITING RM, ACTIVITY… Status: Issued | Not published | — |
| applied Apr 13 | #2026-026605-000-00-FA Facility Permit · Alteration controls-PPS BENSON HS COOLING TOWER PIPING TI; MINOR DEMO, INSTALL NEW PIPING TO CHILLER AND COOLING TOWER AND ELEC Status: Final | Not published | — |
| applied Apr 13 | #2026-026414-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPS BENSON HS COOLING TOWER PIPING TI; MINOR DEMO, INSTALL NEW PIPING TO CHILLER AND COOLING TOWER AND ELEC Status: Issued | Not published | — |
| applied Mar 10 | #2026-017399-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPS BENSON HS MESH PANEL REPLACEMENT 2ND FLR; MINOR DEMO, INSTALL WIRE MESH PANELS AT RAILING AND FINISHES Status: Final | Not published | $50K |
| applied Mar 10 | #2026-017398-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPS BENSON HS MESH PANEL REPLACEMENT 2ND FLR; MINOR DEMO, INSTALL WIRE MESH PANELS AT RAILING AND FINISHES Status: Issued | Not published | — |
| applied Jan 16 | #2026-003870-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPS BENSON HS ROOF REPAIR; MINOR DEMO OF ROOF SECTIONS BLDG D, E, G1, INSTALL INSULATION AT PARAPETS, REROOF AFFECTED AREAS AND FINISHES Status: Final | Not published | $1.1M |
| applied Jan 16 | #2026-003868-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPS BENSON HS ROOF REPAIR; MINOR DEMO OF ROOF SECTIONS BLDG D, E, G1, INSTALL INSULATION AT PARAPETS, REROOF AFFECTED AREAS AND FINISHES Status: Issued | Not published | — |
| applied Dec 18 | #2025-101377-000-00-FS Fire Systems Permit · Alteration SPRINKLER - TO MITIGATE POTENTIAL MIXTURE OF WATER FROM SPRINKLERS WITH MOLTEN METAL ACTIVITIES, THE EXISTING SYSTEM IS BEING MODIFIED TO: CAP 7 SPRINKLER HEADS IN THE MOLTEN METAL WORK ZONE, RELOCATE 3 HEADS TO PROVIDE EQUAL DISTANCE FROM EACH SIDE OF THE WORK AREA Status: Final | Not published | — |
| applied Aug 18 | #2025-066783-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPS BENSON HIGH SCHOOL HVAC; INSTALL VALVES AND PIPING Status: Issued | Not published | $132K |
| applied Aug 18 | #2025-066782-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPS BENSON HIGH SCHOOL HVAC; INSTALL VALVES AND PIPING Status: Issued | Not published | — |
| applied Jul 16 | #2025-057097-000-00-ET Electrical Permit · Addition/Alteration/Replacement 700341 PPS - Benson HS - Sand Muller Modernization - (1) 480V panel relocate, (1) 120V controls modification for sand mixer (muller) Status: Final | Not published | — |