Commercial General Building, Demolition, Electrical, Fire Protection, Hvac/Mechanical work permitted November 5, 2024, with 74 permits through October 29, 2026, declaring $4,131,100 of work.
BES STEP - A new passageway from Silver Tunnel to the new SOFA Building and new walls/stairs for other tunnel access in basement of existing (to be demolished) SLPR building.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
74 permits issued Nov 5 – Oct 29, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 5 | #2026-069684-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX REPLACE AND ADD INSTRUMENTS AT DIFFERENT LOCATIONS AROUND WWTP |
Status: Issued
| Not published |
| — |
| applied Sep 29 | #2026-072012-000-00-ET Electrical Permit · Addition/Alteration/Replacement Replacing 3 wire powered duct system for 20 ton crane with 4 wire system to provide proper grounding to crane. Status: Issued | Not published | — |
| applied Jul 20 | #2026-053190-000-00-ET Electrical Permit · Addition/Alteration/Replacement Adding DDC controls panel to MAU-2 Status: Issued | Not published | — |
| applied Mar 11 | #2025-012896-REV-01-CO Commercial Building Permit · New Construction BES STEP - REV 01 - Add new structural wall, non-structural bathroom wall and door Status: Issued | Not published | $50K |
| applied Mar 19 | #2024-070459-REV-01-CO Commercial Building Permit · Demolition BES STEP - MPG - REV 01 - SLPR Demo - Revised demolition drawings to reflect the work for the new passageway in the basement of the former solids processing (SLPR) building. New Passageways constructed under 25-012896-CO. Status: Issued | Not published | — |
| applied May 13 | #2026-035161-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) SINGLEPDF - REMOVE AND REPLACE (2) 10 TON CLIMATE MASTER WSHP - LIKE FOR LIKE Status: Final | Not published | — |
| applied May 26 | #2026-038132-000-00-ET Electrical Permit · Addition/Alteration/Replacement Replace (2) water source heat pumps and controls Status: Final | Not published | — |
| applied Feb 20 | #2021-096854-DFS-23-CO Commercial Building Permit · New Construction BES STEP - MPG - SOFA - DFS 23 - SOFA Exterior vertical conduit supports Status: Issued | Not published | $100 |
| applied Feb 20 | #2021-096854-DFS-24-CO Commercial Building Permit · New Construction BES STEP - MPG - SOFA - DFS 24 - SOFA Building crossing conduit supports Status: Issued | Not published | $1K |
| applied Feb 5 | #2026-007980-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX INSTALL NEW FEEDER, ADD (1) NEW POWER PANEL FOR DIGESTER. ASSOCIATED WITH 2024-050184-000-00-CO Status: Under Inspection | Not published | — |
| applied Jul 8 | #2020-147119-DFS-09-CO Commercial Building Permit · Alteration BES STEP Project - DFS 09 - Associated with permit UTL 01 - Pig Launching Station Piping Supports Anchorage & Bracing Status: Issued | Not published | $1.5K |
| applied Jul 7 | #2020-147119-DFS-07-CO Commercial Building Permit · Alteration BES STEP Project - DFS 07 - SECL 9 - SSC Piping Supports Anchorage & Bracing **w/ 22 106810 DFS 06 CO** Status: Issued | Not published | $5K |
| applied Jul 15 | #2021-096854-DFS-21-CO Commercial Building Permit · New Construction BES STEP - MPG - SOFA - DFS 21 - Sump Piping Support Anchorage and Bracing Status: Issued | Not published | — |
| applied Jun 20 | #2021-096854-DFS-17-CO Commercial Building Permit · New Construction BES STEP - MPG - SOFA - DFS 17 - Stair Landing Anchorage & Bracing Status: Issued | Not published | $2K |
| applied Jun 23 | #2022-106854-DFS-13-CO Commercial Building Permit · New Construction BES STEP Project - MPG - DFS 13 - RAPU - Jib Crane Anchorage and Bracing Status: Final | Not published | $2K |
| applied Dec 19 | #2021-096854-DFS-22-CO Commercial Building Permit · New Construction BES STEP - MPG - SOFA - DFS 22 - SOFA GBT enclosure stands anchorage Status: Issued | Not published | $10K |
| applied Jan 17 | #2026-004091-000-00-ET Electrical Permit · Addition/Alteration/Replacement Convergint will complete headend terminations at panels Status: Issued | Not published | — |
| applied Apr 15 | #2025-012896-000-00-CO Commercial Building Permit · New Construction BES STEP - A new passageway from Silver Tunnel to the new SOFA Building and new walls/stairs for other tunnel access in basement of existing (to be demolished) SLPR building. Status: Issued | Not published | $1.6M |
| applied Nov 12 | #2025-092198-000-00-ET Electrical Permit · Addition/Alteration/Replacement Replace dry xmfr and feeder circuit, replace pump feeder. Status: Final | Not published | — |
| applied Oct 15 | #2023-009493-DFS-17-CO Commercial Building Permit · Alteration BES STEP - MPG - Tunnel Work - DFS 17 - TUSI mixed liquor pumps discharge and suction support anchorage Status: Under Inspection | Not published | $5K |
| applied May 21 | #2023-009493-DFS-13-CO Commercial Building Permit · Alteration BES STEP - MPG - Tunnel Work - DFS 13 - RAS Piping supports anchorage and bracing Status: Under Inspection | Not published | $10K |
| applied Oct 29 | #2025-088510-000-00-ET Electrical Permit · Addition/Alteration/Replacement Relocate conduit at security booth Status: Final | Not published | — |
| applied Oct 1 | #2021-091119-REV-03-CO Commercial Building Permit · New Construction BES STEP - Slough Building - MPG - REV 03 to DFS 03 - Changes to the condensing unit anchorage Status: Final | Not published | — |
| applied Aug 11 | #2021-091119-DFS-15-CO Commercial Building Permit · New Construction BES STEP - MPG - DFS 15 - Slough exterior decorative metal panels anchorage Status: Final | Not published | $5K |
| applied Sep 8 | #2025-070521-000-00-FS Fire Systems Permit · New ALARM (DAS) - PUBLIC SAFETY DAS. INSTALLATION OF 1 BDA, 1 HEAD END, 3 REMOTES, 19 ANTENNAS, 1 DONOR ANTENNA Status: Final | Not published | — |
| applied Jul 10 | #2022-106810-DFS-08-CO Commercial Building Permit · New Construction BES STEP Project - DFS 08 - SECL 10 Bridge Piping Supports Anchorage & Bracing **w/20-147119-DFS-10-CO** Status: Issued | Not published | $1.5K |
| applied Jul 10 | #2020-147119-DFS-10-CO Commercial Building Permit · Alteration BES STEP Project - DFS 10 - SECL 9 - Bridge Piping Supports Anchorage & Bracing **w/ 22 106810 DFS 08 CO** Status: Issued | Not published | $1.5K |
| applied Jul 10 | #2021-096854-DFS-20-CO Commercial Building Permit · New Construction BES STEP - MPG - SOFA - DFS 20 - Progressing Cavity Pumps Anchorage and Bracing Status: Issued | Not published | $5K |
| applied Jul 9 | #2022-106854-DFS-14-CO Commercial Building Permit · New Construction BES STEP Project - MPG - DFS 14 - RAPU - Sump Pump Piping Supports Anchorage and Bracing Status: Final | Not published | — |
| applied Jul 9 | #2023-009493-DFS-16-CO Commercial Building Permit · Alteration BES STEP - MPG - Tunnel Work - DFS 16 - Tunnel Exhaust Fan Extensions Anchorage Status: Final | Not published | — |
| applied Jul 7 | #2022-106810-DFS-07-CO Commercial Building Permit · New Construction BES STEP Project - DFS 07 - SECL 10 WWPW Ring Piping Supports Anchorage & Bracing **w/20-147119-DFS-08-CO** Status: Issued | Not published | $5K |
| applied Jul 7 | #2020-147119-DFS-08-CO Commercial Building Permit · Alteration BES STEP Project - DFS 08 - SECL 9 - WWPW Ring Piping Supports Anchorage & Bracing **w/ 22 106810 DFS 07 CO** Status: Issued | Not published | $3K |
| applied Jun 27 | #2022-106810-DFS-05-CO Commercial Building Permit · New Construction BES STEP Project - DFS 05 - SECL 10 Aluminum Handrail Anchorage & Bracing **w/20-147119-DFS-06-CO** Status: Issued | Not published | $1K |
| applied Jun 27 | #2020-147119-DFS-06-CO Commercial Building Permit · Alteration BES STEP Project - DFS 06 - SECL 9 Aluminum Handrail Anchorage and Bracing **w/22-106810-DFS-05-CO** Status: Issued | Not published | $1K |
| applied Jun 24 | #2021-096854-DFS-18-CO Commercial Building Permit · New Construction BES STEP - MPG - SOFA - DFS 18 - Sump Pump Jib Crane Anchorage and Bracing Status: Issued | Not published | $2K |
| applied Jun 11 | #2022-106854-DFS-11-CO Commercial Building Permit · New Construction BES STEP Project - MPG - DFS 11 - RAPU Aluminum Handrail Anchorage & Bracing Status: Final | Not published | $1K |
| applied Jun 11 | #2021-096854-DFS-16-CO Commercial Building Permit · New Construction BES STEP - MPG - SOFA - DFS 16 - Aluminum Handrail Anchorage & Bracing Status: Issued | Not published | $1K |
| applied Jun 2 | #2023-009493-DFS-14-CO Commercial Building Permit · Alteration BES STEP - MPG - Tunnel Work - DFS 14 - TUSI WWPW Piping Supports Anchorage & Bracing Status: Under Inspection | Not published | $5K |
| applied Jun 3 | #2023-009493-DFS-15-CO Commercial Building Permit · Alteration BES STEP - MPG - Tunnel Work - DFS 15 - TUSI HNC Piping Supports Anchorage & Bracing Status: Under Inspection | Not published | $5K |
| applied May 23 | #2021-091117-DFS-02-CO Commercial Building Permit · New Construction BES STEP - MPG - ST06 Building - DFS 02 - Railing and Ladder Anchorage and Bracing Status: Final | Not published | $5K |
| applied May 23 | #2022-106854-DFS-12-CO Commercial Building Permit · New Construction BES STEP Project - MPG - DFS 12 - RAPU HVAC Anchorage and Bracing Status: Final | Not published | $15K |
| applied Jun 2 | #2021-091119-DFS-13-CO Commercial Building Permit · New Construction BES STEP - MPG - DFS 13 - Storefront Anchorage Status: Final | Not published | $6K |
| applied Jun 4 | #2021-091119-DFS-14-CO Commercial Building Permit · New Construction BES STEP - MPG - DFS 14 - Exterior Cladding Attachment Anchorage Status: Final | Not published | $5K |
| applied May 21 | #2021-091119-DFS-12-CO Commercial Building Permit · New Construction BES STEP - Slough Building - MPG - DFS 12 - skylight anchorage Status: Final | Not published | $10K |
| applied May 20 | #2023-021720-DFS-01-CO Commercial Building Permit · Alteration BES STEP Project - MPG - Yellow and Blue Tunnels - DFS 01 - TUYE Piping Supports Anchorage Status: Final | Not published | $10K |
| applied Jun 18 | #2025-048507-000-00-ET Electrical Permit · Addition/Alteration/Replacement 70960: FA install for SOFA Building. Fire Alarm Permit# 23-109841-000-00-FS Status: Final | Not published | — |
| applied May 22 | #2021-091117-DFS-01-CO Commercial Building Permit · New Construction BES STEP - MPG - ST06 Building - DFS 01 - Panelboard anchorage and bracing Status: Final | Not published | $2.5K |
| applied May 20 | #2023-009493-DFS-12-CO Commercial Building Permit · Alteration BES STEP - MPG - Tunnel Work - DFS 12 - mixed liquor water panel anchorage Status: Under Inspection | Not published | $5K |
| applied Mar 5 | #2021-091119-DFS-08-CO Commercial Building Permit · New Construction BES STEP - Slough Building - MPG - DFS 08 - Jib Crane Anchorage and Bracing Status: Final | Not published | — |
| applied Jan 13 | #2022-194709-000-00-CO Commercial Building Permit · New Construction BES STEP - MPG - New recycling and trash enclosure with equipment wash down area Status: Final | Not published | $100K |
| applied Jul 2 | #2024-050185-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) Install gas piping from the existing building to new biogas flares **w/24-050184-CO** Status: Under Inspection | Not published | — |
| applied May 1 | #2021-091119-DFS-11-CO Commercial Building Permit · New Construction BES STEP - Slough Building - MPG - DFS 11 - Slough Ships Ladder Anchorage and Bracing Status: Final | Not published | $50K |
| applied May 27 | #2025-041516-000-00-ET Electrical Permit · Addition/Alteration/Replacement Disconnect and reconnect a vent fan Status: Final | Not published | — |
| applied Mar 12 | #2025-018193-000-00-CO Commercial Building Permit · New Construction BES STEP - New Racking permit associated with new storage tent permitted under 23-055922-CO (permit required per building inspector). Status: Issued | Not published | $30K |
| applied Jan 4 | #2022-106867-000-00-CO Commercial Building Permit · New Construction BES STEP Project - MPG - Construction of concrete pad for new satellite boiler (this will be a DFS). Status: Final | Not published | $500K |
| applied Aug 21 | #2022-106867-DFS-01-CO Commercial Building Permit · New Construction BES STEP Project - MPG - DFS 01 - Remote Boiler System Status: Final | Not published | $700K |
| applied Dec 27 | #2022-202749-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) BES STEP - Blower Building - HVAC make up air unit to be replaced on Blower Building (w/22-202743-CO) Status: Final | Not published | — |
| applied Dec 27 | #2022-202761-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) BES STEP Project - MPG - HVAC Make Up Air Unit to be replaced on Effluent Pump House (EFPU) (w/22-202755-CO) Status: Final | Not published | — |
| applied Feb 13 | #2021-091119-REV-02-CO Commercial Building Permit · New Construction BES STEP - MPG - REV 02 - REV to DFS 07 - Additional anchorage and bracing design to support SLOU-MTS stand as an alternate from the original design. Status: Final | Not published | — |
| applied Jan 26 | #2022-106870-000-00-MT Mechanical Permit · New Construction BES STEP Project - MPG - Mechanical related to construction of new satellite plant boiler (container structure) to be added to replace old boilers that will be demolished to provide heat to offices and workspaces at the Columbia Blvd. Wastewater Treatment Plant (w/22-106867-CO). Status: Final | Not published | — |
| applied Jun 23 | #2023-055922-000-00-CO Commercial Building Permit · Alteration BES STEP - Temporary tent structure (+180 days) to house permanent material for STEP project. To be removed or permitted as permanent structure once BES STEP project is completed. Status: Final | Not published | $60K |
| applied Feb 10 | #2021-091119-DFS-09-CO Commercial Building Permit · New Construction BES STEP - Slough Building - MPG - DFS 09 - Gypsum Wall Board Interior Stud Framing Calculations Status: Final | Not published | — |
| applied Feb 10 | #2021-091119-DFS-10-CO Commercial Building Permit · New Construction BES STEP - Slough Building - MPG - DFS 10 - Acoustical Ceiling Tile (ACT) Anchorage Calculations Status: Final | Not published | — |
| applied Jun 29 | #2012-156342-000-00-ET Electrical Permit · New Construction INSTALL A 200-AMP TEMPORARY SERVICE AND FEED CONSTRUCTION TRAILERS FAXED Status: Final | Not published | — |
| applied Dec 12 | #2023-009493-REV-03-CO Commercial Building Permit · Alteration BES STEP - MPG - Tunnel Work - REV-03 to DFS-07, an additional type of support was designed to support the cable tray in an alternate location from the original design. Status: Final | Not published | — |
| applied Jun 22 | #2023-056200-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) SINGLE PDF - REPLACE AGING AIR HANDLER WITH LIKE UNIT, GROUND LEVEL Status: Final | Not published | — |
| applied Dec 4 | #2021-096854-DFS-15-CO Commercial Building Permit · New Construction BES STEP - MPG - SOFA - DFS 15 - 3rd Floor Cable Table Tray Anchorage & Bracing Status: Issued | Not published | — |
| applied Sep 3 | #2024-071217-000-00-CO Commercial Building Permit · New Construction BES STEP - MPG - New equipment pad #1 on silver tunnel roof, 80 feet northeast of new SOFA Building w/24-070459-CO and 24-071223-MT. Status: Issued | Not published | $20K |
| applied Sep 3 | #2024-070459-000-00-CO Commercial Building Permit · Demolition BES STEP - MPG - Demo of existing sludge processing facility (SLPR), solids loadout facility, conveyor, and temporary odor control system. REMOVE ALL FOUNDATIONS AND DEBRIS. COMPACTED FILL PER TITLE 24 STANDARDS, SOILS SPECIAL INSPECTION REQUIRED. (w/pad#1 24-071217-CO & 24-071223-MT and pad#2… Status: Issued | Not published | $1M |
| applied Sep 5 | #2024-071219-000-00-CO Commercial Building Permit · New Construction BES STEP - MPG - New equipment pad #2 near new SOFA Building w/24-072918-MT. Status: Issued | Not published | $20K |
| applied Dec 2 | #2022-194701-000-00-MT Mechanical Permit · New Construction Mechanical related to new SLOUGH building **w/21-091119-CO** Status: Final | Not published | — |
| applied Nov 18 | #2021-096854-DFS-14-CO Commercial Building Permit · New Construction BES STEP - MPG - SOFA - DFS 14 - 2nd Floor Cable Table Tray Anchorage & Bracing Status: Issued | Not published | — |
| applied Oct 14 | #2021-096854-DFS-13-CO Commercial Building Permit · New Construction BES STEP - MPG - SOFA - DFS 13 - 1st Floor Table Tray Anchorage & Bracing Status: Issued | Not published | — |
| applied Oct 4 | #2021-096854-DFS-12-CO Commercial Building Permit · New Construction BES STEP - MPG - SOFA - DFS 12 - Elevator Disconnect Anchorage & Bracing Status: Issued | Not published | — |