Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Sign work permitted November 1, 2024, with 156 permits through October 21, 2026, declaring $60,205,795 of work.
FULL PDOX PROCESS/ PPMC NORTH PAVILION CANCER CENTER 9-10 FLRS; DEMO WALLS, NEW WALLS TO CREATE STAFF RMS, PATIENT RMS, RESTRMS, FAMILY RM, CORRIDORS, NOURISH RMS, WORK RMS, LINEN RMS, SOILED UTILITY RMS, CLEAN SUPPLY RMS, STORAGE RMS, MEDS RMS, SINK & EQUIP ALCOVES, STAFF BREAK/LOCKER RMS, OFFICES, HOUSEKEEPING RMS, CONF/EDUCATION RMS, LINEN CHUTE, FAMILY ZONE RMS, ELEVATOR LOBBIES, EQUIP STORAGE RM, ELEC RMS, 9TH FLR - ON CALL RM, 10TH FLR - LACTATION RM, TRAINING RM, DAS RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
156 permits issued Nov 1 – Oct 21, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#2026-073965-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE HOSPITAL FIRE ALARM; INSTALL 1 FIRE ALARM SHUTDOWN RELAY TO SERVE EF-1 Status: Final |
| Not published |
| $5.2K |
| applied Oct 20 | #2026-077767-000-00-FA Facility Permit · Alteration PPMC FIRE ALARM UPGRADE 6TH FLR; INSTALL (2) IAM RELAYS WITH AUXILIARY RELAYS TO SERVE SOUTH FSDS IN 6N TO FACILITATE SMOKE COMPARTMENT SEPARATION BETWEEN NORTH AND SOUTH Status: Issued | Not published | — |
| applied Oct 20 | #2026-077611-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE PORTLAND HOSPITAL FIRE ALARM UPGRADE 6TH FLR; INSTALL (2) IAM RELAYS WITH AUXILIARY RELAYS TO SERVE SOUTH FSDS IN 6N TO FACILITATE SMOKE COMPARTMENT SEPARATION BETWEEN NORTH AND SOUTH Status: Issued | Not published | — |
| applied Oct 15 | #2026-076639-000-00-FA Facility Permit · Alteration Replace 12 lights on the 4th and 5th floor elevator lobbies Status: Issued | Not published | — |
| applied Oct 15 | #2026-076637-000-00-FA Facility Permit · Alteration Replace 12 lights on the 4th and 5th floor elevator lobbies Status: Issued | Not published | — |
| applied Oct 6 | #2026-073967-000-00-FA Facility Permit · Alteration fire alarm wiring - PROVIDENCE HOSPITAL FIRE ALARM; INSTALL 1 FIRE ALARM SHUTDOWN RELAY TO SERVE EF-1 Status: Final | Not published | — |
| applied Oct 6 | #2026-073964-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE HOSPITAL FIRE ALARM; INSTALL 1 FIRE ALARM SHUTDOWN RELAY TO SERVE EF-1 Status: Issued | Not published | — |
| applied Aug 26 | #2026-063705-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE PARKING GARAGE ELEVATOR 22 FIRE ALARM LEVEL A TI; ELEVATOR 22 - PROVIDE MONITORING OF SILENT KNIGHT FIRE ALARM CONTROL PANEL IN AWM4 SERVING ELEVATOR IN GLISAN ST PARKING GARAGE Status: Final | Not published | $6.2K |
| applied Aug 28 | #2026-059129-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX INSTALL (2) 800-AMP, 480-VOLT FEEDERS TO SERVE TEMPORARY CHILLERS. Status: Issued | Not published | — |
| applied Aug 28 | #2026-064355-000-00-ET Electrical Permit · Addition/Alteration/Replacement Provide and install DDC low voltage wirings for the new TYM1 Exhaust Fan Status: Issued | Not published | — |
| applied Aug 26 | #2026-063703-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE PARKING GARAGE ELEVATOR 22 FIRE ALARM LEVEL A TI; ELEVATOR 22 - PROVIDE MONITORING OF SILENT KNIGHT FIRE ALARM CONTROL PANEL IN AWM4 SERVING ELEVATOR IN GLISAN ST PARKING GARAGE Status: Issued | Not published | — |
| applied Aug 26 | #2026-063736-000-00-FA Facility Permit · Alteration fire alarm - PROVIDENCE PARKING GARAGE ELEVATOR 22 FIRE ALARM LEVEL A TI; ELEVATOR 22 - PROVIDE MONITORING OF SILENT KNIGHT FIRE ALARM CONTROL PANEL IN AWM4 SERVING ELEVATOR IN GLISAN ST PARKING GARAGE Status: Issued | Not published | — |
| applied Jul 6 | #2026-049169-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX REPLACE (6) ATS'S IN EXISTING LOCATIONS UTILIZING EXISTING FEEDERS. Status: Issued | Not published | — |
| applied Jun 3 | #2026-040336-000-00-FA Facility Permit · Alteration card reader - PPMC SKYBRIDGE DOOR ADDITION LEVEL C TI; MINOR DEMO, NEW WALL TO CREATE STOREFRONT DOOR, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | — |
| applied Nov 12 | #2024-096664-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC CANCER CENTER SERVICE ELEVATOR #56 ALL FLRS; MINOR DEMO, INSTALL NEW SERVICE ELEVATOR IN EXISTING SHAFT, STEEL PIT LADDER, CREATE ACCESS DOOR OPENINGS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-SUMP PUMP Status: Final | Not published | — |
| applied Jun 16 | #2026-043958-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE PARKING GARAGE ELEVATOR FIRE ALARM LEVEL A TI; ELEVATOR 27 PROVIDE MONITORING OF SILENT KNIGHT FIRE ALARM CONTROL PANEL IN AXM1 Status: Final | Not published | $5.3K |
| applied Jun 16 | #2026-044051-000-00-FA Facility Permit · Alteration fire alarm wiring - PROVIDENCE PARKING GARAGE ELEVATOR FIRE ALARM LEVEL A TI; ELEVATOR 27 PROVIDE MONITORING OF SILENT KNIGHT FIRE ALARM CONTROL PANEL IN AXM1 Status: Final | Not published | — |
| applied Jun 16 | #2026-043955-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE PARKING GARAGE ELEVATOR FIRE ALARM LEVEL A TI; ELEVATOR 27 PROVIDE MONITORING OF SILENT KNIGHT FIRE ALARM CONTROL PANEL IN AXM1 Status: Issued | Not published | — |
| applied Jun 5 | #2024-108376-DFS-02-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC PET/CT REPLACEMENT BASEMENT; DFS FOR FCU SEISMIC COMPLIANCE Status: Final | Not published | — |
| applied May 22 | #2026-037778-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC SKYBRIDGE DOOR ADDITION LEVEL C TI; MINOR DEMO, NEW WALL TO CREATE STOREFRONT DOOR, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | $30K |
| applied Apr 27 | #2026-004447-DFS-01-CO Commercial Building Permit · Addition SINGLE PDF - DFS FOR STOREFRONT SYSTEM Status: Final | Not published | — |
| applied May 22 | #2026-037775-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC SKYBRIDGE DOOR ADDITION LEVEL C TI; MINOR DEMO, NEW WALL TO CREATE STOREFRONT DOOR, CEILING, FLOORING, FINISHES AND ELEC Status: Issued | Not published | — |
| applied May 11 | #2026-034245-000-00-ET Electrical Permit · Addition/Alteration/Replacement (1) Sign / outdoor lighting Circuit "PPCM Emergency" Disconnect for removal / Refurb and reconnect install. Status: Final | Not published | — |
| applied Apr 21 | #2026-028604-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC ASB ZONE DEVICE UPGRADE LEVELS T-4; UPGRADE EXISTING ZONE CIRCUITS MONITORING SPRINKLER TAMPER AND WATERFLOW DEVICES ON FLOORS 1-4 AND IN THE TUNNEL, REPLACE ZONE PULL STATION WITH ADDRESSABLE PULL ON 1ST FLOOR. REPLACE ZONE HEAT DETECTOR ON B LEVEL WITH ADDRESSABLE SMOKE,… Status: Final | Not published | $9K |
| applied Apr 24 | #2024-108376-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC PET/CT REPLACEMENT BASEMENT; VALUE ADDED REVISION TO RELOCATE FCU, DUCTWORK AND DIFFUSERS Status: Final | Not published | $40K |
| applied Apr 16 | #2024-106464-DFS-05-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC NORTH PAVILION CANCER CENTER 9-10 FLRS; DFS FOR PNEUMATIC TUBE SEISMIC BRACING Status: Final | Not published | $10K |
| applied Apr 17 | #2024-022501-DFS-07-FA Facility Permit · Alteration FULL PDOX PROCESS/ PPMC HOSPITAL EMERGENCY DEPARTMENT TI BASEMENT, 1ST, 2ND & 3RD FLRS, PENTHOUSE; DFS FOR GLYCOL & EXPANSION TANK SEISMIC Status: Final | Not published | $15K |
| applied Apr 21 | #2026-028599-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC ASB ZONE DEVICE UPGRADE LEVELS T-4; UPGRADE EXISTING ZONE CIRCUITS MONITORING SPRINKLER TAMPER AND WATERFLOW DEVICES ON FLOORS 1-4 AND IN THE TUNNEL, REPLACE ZONE PULL STATION WITH ADDRESSABLE PULL ON 1ST FLOOR. REPLACE ZONE HEAT DETECTOR ON B LEVEL WITH ADDRESSABLE SMOKE,… Status: Issued | Not published | — |
| applied Apr 21 | #2026-028734-000-00-FA Facility Permit · Alteration PPMC ASB ZONE DEVICE UPGRADE LEVELS T-4; UPGRADE EXISTING ZONE CIRCUITS MONITORING SPRINKLER TAMPER AND WATERFLOW DEVICES ON FLOORS 1-4 AND IN THE TUNNEL, REPLACE ZONE PULL STATION WITH ADDRESSABLE PULL ON 1ST FLOOR. REPLACE ZONE HEAT DETECTOR ON B LEVEL WITH ADDRESSABLE SMOKE, 1 SMOKE DETECTOR, 1… Status: Final | Not published | — |
| applied Mar 6 | #2026-016866-000-00-FS Fire Systems Permit · Alteration SPRINKLER - MODIFY EXISTING FIRE SPRINKLER SYSTEM AT HOSPITAL ENTRANCE Status: Under Inspection | Not published | — |
| applied Oct 17 | #2024-089341-000-00-ET Electrical Permit · Addition/Alteration/Replacement Cochran to Install (429) new cat6 cable for (429) AP locations Status: Final | Not published | — |
| applied Apr 7 | #2026-024984-000-00-ET Electrical Permit · Addition/Alteration/Replacement Replace lighting, re-arrange receptacles, relocate smoke detection. Status: Final | Not published | — |
| applied Jan 30 | #2026-006650-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) PDOX PS: MECHANICAL SCOPE FOR NEW ADDITION. W26-004447-CO Status: Final | Not published | — |
| applied Jan 30 | #2026-004447-000-00-CO Commercial Building Permit · Addition PDOX - SMALL ADDITION TO ENCLOSE ALCOVE. W26-006650-MT Status: Final | Not published | $220K |
| applied Feb 19 | #2024-094075-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC CANCER CENTER SERVICE ELEVATOR #56 ALL FLRS; VALUE ADDED REVISION TO CHANGE LOCATION OF ELEVATOR PIT LADDER Status: Final | Not published | $900 |
| applied Dec 10 | #2024-022501-DFS-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL EMERGENCY DEPARTMENT TI BASEMENT, 1ST, 2ND & 3RD FLRS, PENTHOUSE; DFS FOR SEISMIC ANCHORAGE OF HVAC EQUIPMENT Status: Final | Not published | $10K |
| applied Jan 6 | #2026-001178-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC DISHWASHER REPLACEMENT INT & EXT; DEMO WALLS, INSTALL 3RD FLR - NEW SHAFT WALL, 2ND, 4TH, 5TH FLRS - NEW ACCESS HATCH, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-DISHWASHER, 1-HAND SINK, 1-3 COMPARTMENT SINK, 4-WATER METERS, 1-TRAP PRIMER, 1-EMERGENCY EYEWASH, 4-MIXING… Status: Final | Not published | — |
| applied Mar 10 | #2026-017637-000-00-ET Electrical Permit · Addition/Alteration/Replacement Provide and install low voltage DDC for 2 New Exhaust Fans and 4 domestic water meters Status: Final | Not published | — |
| applied Mar 2 | #2026-015267-000-00-FA Facility Permit · Alteration power, fire alarm - PPMC HOSPITAL WEST PARKING GARAGE ELEVATOR ALL FLRS; DEMO WALLS, NEW WALLS TO CREATE ELEVATOR ENTRY/LOBBY, REMODEL EXISTING ELEVATOR SHAFT, FINISHES AND ELEC Status: Final | Not published | — |
| applied Feb 12 | #2026-011038-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC DISHWASHER REPLACEMENT INT & EXT; DEMO EXISTING SPRINKLER DROPS IN KITCHEN AREA, INSTALL TEMPORARY PENDENTS, REPLACE TEMPORARY PENDENTS WITH NEW SPRINKLERS IN NEW CEILING GRID WITH OVERSIZED HOLES AND EXTENDER RINGS, 28 HEADS Status: Final | Not published | $11.1K |
| applied Feb 18 | #2026-012401-000-00-FA Facility Permit · Alteration Master Permit Inspection 02.02.24 to 11.23.25 Status: Final | Not published | — |
| applied Feb 10 | #2026-010182-000-00-FA Facility Permit · Alteration nurse call - PPMC HOSPITAL EMERGENCY DEPARTMENT SECTOR A & B REMODEL 1ST FLR INT & EXT; DEMO WALLS, EXT - INFILL EXISTING OPENING, CREATE NEW VESTIBULE DOOR & DOOR, INT - NEW WALLS TO CREATE SUB WAITING RM, EXAM RMS, SECURITY RM, RECEPTION AREA, RESTRMS, X-RAY RM, BLOOD DRAW RM, TRIAGE RMS,… Status: Final | Not published | — |
| applied Dec 18 | #2025-101358-000-00-FA Facility Permit · Alteration power - PPMC DISHWASHER REPLACEMENT INT & EXT; DEMO WALLS, INSTALL 3RD FLR - NEW SHAFT WALL, 2ND, 4TH, 5TH FLRS - NEW ACCESS HATCH, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Feb 2 | #2026-008095-000-00-FA Facility Permit · Alteration nurse call - PPMC PET/CT REPLACEMENT BASEMENT; DEMO WALLS, NEW WALLS TO CREATE RESTRM, PATIENT HOLD RMS, CONTROL RM, PET/CT SCAN RM, INSTALL PATIENT LIFT, REMODEL CARDIO EXAM RM BH28, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Nov 7 | #2024-022501-DFS-06-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL EMERGENCY DEPARTMENT TI BASEMENT, 1ST, 2ND & 3RD FLRS, PENTHOUSE; DFS FOR HVAC EQUIPMENT ANCHORAGE Status: Final | Not published | $50K |
| applied Jan 20 | #2026-004364-000-00-ET Electrical Permit · Addition/Alteration/Replacement Provide and install low voltage DDC for 2 New RHCs and 1 New FCU Status: Final | Not published | — |
| applied Nov 7 | #2024-022501-DFS-05-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL EMERGENCY DEPARTMENT TI BASEMENT, 1ST, 2ND & 3RD FLRS, PENTHOUSE; DFS FOR HVAC SEISMIC BRACING Status: Final | Not published | $50K |
| applied Oct 15 | #2024-032392-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL EMERGENCY DEPARTMENT SECTOR A & B REMODEL 1ST FLR INT & EXT; VALUE ADD REVISION TO REPLACE CANOPY ROOF, INSTALL ROOF DRAIN, INSULATION AND PLUMB Status: Final | Not published | $250K |
| applied Nov 21 | #2024-104421-DFS-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL WEST PARKING GARAGE ELEVATOR ALL FLRS; DFS FOR FIRESTOPPING Status: Final | Not published | $3K |
| applied Dec 16 | #2025-100340-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC DISHWASHER REPLACEMENT INT & EXT; DEMO WALLS, INSTALL 3RD FLR - NEW SHAFT WALL, 2ND, 4TH, 5TH FLRS - NEW ACCESS HATCH, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $715K |
| applied Dec 16 | #2025-100341-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC DISHWASHER REPLACEMENT INT & EXT; INSTALL ROOFTOP EXHAUST FANS, SMOKE DAMPERS, PIPING, DUCTWORK, DIFFUSERS, GRILLES AND ELEC Status: Final | Not published | $252K |
| applied Dec 17 | #2025-100923-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC TELEMETRY EXPANSION LEVEL 1; RELOCATE 1 SPRINKLER HEAD FOR NEW WALL AND CEILING PLACEMENT Status: Final | Not published | $1.6K |
| applied Dec 16 | #2025-100338-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC DISHWASHER REPLACEMENT INT & EXT; DEMO WALLS, INSTALL 3RD FLR - NEW SHAFT WALL, 2ND, 4TH, 5TH FLRS - NEW ACCESS HATCH, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Nov 25 | #2024-106464-DFS-04-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC NORTH PAVILION CANCER CENTER 9-10 FLRS; DFS FOR MECHANICAL SEISMIC BRACING Status: Final | Not published | $20.8K |
| applied Nov 10 | #2025-091619-000-00-FA Facility Permit · Alteration power - PPMC TELEMETRY EXPANSION LEVEL 1; DEMO WALLS, NEW WALLS TO CREATE TELEMETRY RM, OFFICE, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | — |
| applied Jan 7 | #2025-001431-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC PET/CT REPLACEMENT BASEMENT; DEMO WALLS, NEW WALLS TO CREATE RESTRM, PATIENT HOLD RMS, CONTROL RM, PET/CT SCAN RM, INSTALL PATIENT LIFT, REMODEL CARDIO EXAM RM BH28, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 4-SINKS, 1-WC, 1-LAV, 1-FLOOR DRAIN, 1-TRAP PRIMER,… Status: Final | Not published | — |
| applied Nov 7 | #2024-022501-DFS-04-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL EMERGENCY DEPARTMENT TI BASEMENT, 1ST, 2ND & 3RD FLRS, PENTHOUSE; DFS FOR SEISMIC ANCHORAGE OF ED LOBBY AIR CURTAIN Status: Final | Not published | $10K |
| applied Oct 31 | #2025-089212-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC TELEMETRY EXPANSION LEVEL 1; INSTALL DUCTWORK, DIFFUSER AND ELEC Status: Final | Not published | $14.9K |
| applied Oct 31 | #2025-089211-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC TELEMETRY EXPANSION LEVEL 1; DEMO WALLS, NEW WALLS TO CREATE TELEMETRY RM, OFFICE, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | $125K |
| applied Nov 5 | #2025-090538-000-00-FA Facility Permit · Alteration hvac control - PPMC HOSPITAL WEST PARKING GARAGE ELEVATOR ALL FLRS; DEMO WALLS, NEW WALLS TO CREATE ELEVATOR ENTRY/LOBBY, REMODEL EXISTING ELEVATOR SHAFT, FINISHES AND ELEC Status: Final | Not published | — |
| applied Oct 29 | #2025-082145-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC PET/CT REPLACEMENT BASEMENT; REVISION TO INCLUDE NORTH TOILET, ALCOVE TO SCOPE OF WORK Status: Final | Not published | — |
| applied Nov 4 | #2025-090111-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL WEST PARKING GARAGE ELEVATOR ALL FLRS; DEMO WALLS, NEW WALLS TO CREATE ELEVATOR ENTRY/LOBBY, REMODEL EXISTING ELEVATOR SHAFT, FINISHES AND ELEC, INSTALL 1-ELEVATOR SUMP PUMP Status: Final | Not published | — |
| applied Nov 4 | #2025-090077-000-00-FA Facility Permit · Alteration data - PPMC PET/CT REPLACEMENT BASEMENT; DEMO WALLS, NEW WALLS TO CREATE RESTRM, PATIENT HOLD RMS, CONTROL RM, PET/CT SCAN RM, INSTALL PATIENT LIFT, REMODEL CARDIO EXAM RM BH28, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Oct 31 | #2025-089210-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC TELEMETRY EXPANSION LEVEL 1; DEMO WALLS, NEW WALLS TO CREATE TELEMETRY RM, OFFICE, CEILING, FLOORING, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Oct 17 | #2025-085003-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC PET/CT REPLACEMENT BASEMENT; REMODEL OF EXISTING SPACE TO INCLUDE MODIFICATION OF FIRE ALARM DEVICE LOCATIONS, 2 STROBES, 1 HORN/STROBES, 1 DUAL RELAY IAM Status: Final | Not published | $10.5K |
| applied Sep 26 | #2024-106464-DFS-03-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC NORTH PAVILION CANCER CENTER 9-10 FLRS; DFS FOR SEISMIC ATTACHMENT OF ELECTRICAL EQUIPMENT Status: Final | Not published | $47.5K |
| applied Sep 26 | #2024-106464-DFS-02-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC NORTH PAVILION CANCER CENTER 9-10 FLRS; DFS FOR SEISMIC ATTACHEMENTS FOR PLUMBING Status: Final | Not published | $75.2K |
| applied Jan 6 | #2025-000780-000-00-FA Facility Permit · Alteration power, fire alarm - PPMC PET/CT REPLACEMENT BASEMENT; DEMO WALLS, NEW WALLS TO CREATE RESTRM, PATIENT HOLD RMS, CONTROL RM, PET/CT SCAN RM, INSTALL PATIENT LIFT, REMODEL CARDIO EXAM RM BH28, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Oct 8 | #2025-082145-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC PET/CT REPLACEMENT BASEMENT; RELOCATE AND/OR ADD FIRE SPRINKLERS TO ACCOMMODATE TENANT IMPROVEMENTS, 13 HEADS Status: Final | Not published | $10K |
| applied Sep 29 | #2024-108376-DFS-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC PET/CT REPLACEMENT BASEMENT; DFS FOR SEISMIC AND SUPPORT FOR FCU Status: Final | Not published | $1.8K |
| applied Sep 8 | #2025-072689-000-00-FA Facility Permit · Alteration PPMC HOSPITAL EMERGENCY DEPARTMENT TI BASEMENT, 1ST, 2ND & 3RD FLRS, PENTHOUSE; - ALARM - DAS - This project is to produce a system for a Public Safety (PS) DAS for a two-story Emergency Department of a hospital building located in Portland, Oregon. Roughly 43,000 square feet within the building… Status: Final | Not published | — |
| applied Oct 9 | #2025-082458-000-00-ET Electrical Permit · Addition/Alteration/Replacement 20375-25: provided a dedicated circuit to (4) new exterior signs. One sign front of main lobby, one sign on PPMC Plaza, One sign on Child Center, and one sign on the parking structure helix. Status: Final | Not published | — |
| applied Sep 25 | #2024-094075-DFS-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC CANCER CENTER SERVICE ELEVATOR #56 ALL FLRS; DFS FOR PIT LADDER Status: Final | Not published | $24.5K |
| applied Sep 5 | #2025-072288-000-00-ET Electrical Permit · New Construction Installation of 1 exterior wall sign, LED illuminated, connecting to existing circuit. Status: Final | Not published | — |
| applied Sep 5 | #2025-072286-000-00-ET Electrical Permit · New Construction Installation of 1 exterior wall sign, LED illuminated, connecting to existing circuit. Status: Final | Not published | — |
| applied Aug 21 | #2025-067917-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC NORTH PAVILION CANCER CENTER 9-10 FLRS; MODIFICATION OF THE EXISTING FA SYSTEM TO SUPPORT THE REMODEL, 280 SMOKE DETECTORS, 90 HEAT DETECTORS, 280 STROBES, 4 PULL STATIONS, 136 SPEAKER STROBES Status: Final | Not published | $377K |
| applied Aug 20 | #2025-067661-000-00-ET Electrical Permit · New Construction Installation of 1 exterior wall sign, LED illuminated, connecting to existing circuit. Status: Final | Not published | — |
| applied Jul 1 | #2025-048176-000-00-SG Sign Permit · New Sign/Awning NEW 95.4 SQ FT ILLUMINATED FLUSH MOUNT WALL SIGN FOR PROVIDENCE ON SOUTH ELEVATION OF PATIENT SERVICES BUILDING. **ET SEPARATE. Status: Final | Not published | — |
| applied Jul 24 | #2025-059612-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC NORTH PAVILION CANCER CENTER 9-10 FLRS; ALTER AND REBUILD EXISTING SHELL SPACE PIPING FOR NEW WALLS AND CEILINGS FOR LEVELS 9 & 10, 629 HEADS Status: Final | Not published | $199K |
| applied Aug 6 | #2025-063400-000-00-ET Electrical Permit · New Construction Installation of 1 exterior wall sign, LED illuminated, connecting to existing circuit. Status: Final | Not published | — |
| applied Jul 9 | #2025-054348-000-00-SG Sign Permit · New Sign/Awning NEW 190.5 SQ FT ILLUMINATED FLUSH MOUNT SIGN (EACH LETTER AND INSIGNIA INDIVIDUALLY FLUSH MOUNT ON ROUNDED STRUCTURE). **ET SEPARATE Status: Final | Not published | — |
| applied Aug 4 | #2025-062830-000-00-FA Facility Permit · Alteration nurse call, overhead paging - PPMC NORTH PAVILION CANCER CENTER 9-10 FLRS; DEMO WALLS, NEW WALLS TO CREATE STAFF RMS, PATIENT RMS, RESTRMS, FAMILY RM, CORRIDORS, NOURISH RMS, WORK RMS, LINEN RMS, SOILED UTILITY RMS, CLEAN SUPPLY RMS, STORAGE RMS, MEDS RMS, SINK & EQUIP ALCOVES, STAFF BREAK/LOCKER… Status: Final | Not published | — |
| applied Jun 10 | #2025-045861-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE MEDICAL CENTER 8TH FLR TI; NO CONSTRUCTION - REVIEW ONLY TO CONFIRM OF CHANGE OF USE FOR RMS 7M05 & 8M01 FROM OFFICES TO SLEEP RMS Status: Issued | Not published | — |
| applied Jul 28 | #2025-060243-000-00-FA Facility Permit · Alteration DAS antenna - PPMC HOSPITAL EMERGENCY DEPARTMENT SECTOR A & B REMODEL 1ST FLR INT & EXT; DEMO WALLS, EXT - INFILL EXISTING OPENING, CREATE NEW VESTIBULE DOOR & DOOR, INT - NEW WALLS TO CREATE SUB WAITING RM, EXAM RMS, SECURITY RM, RECEPTION AREA, RESTRMS, X-RAY RM, BLOOD DRAW RM, TRIAGE RMS,… Status: Final | Not published | — |
| applied Jul 17 | #2024-104421-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL WEST PARKING GARAGE ELEVATOR ALL FLRS; REVISION TO REMOVE ELEVATOR PIT PLATFORM AND LADDER FROM SCOPE Status: Final | Not published | — |
| applied Jul 10 | #2025-055268-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE MEDICAL CENTER DOOR REPLACEMENT; MINOR DEMO, REPLACE EXTERIOR SOUTH ELEVATION GLASS DOOR WITH NEW METAL DOOR AND FINISHES Status: Final | Not published | $20K |
| applied Jul 10 | #2025-055267-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE MEDICAL CENTER DOOR REPLACEMENT; MINOR DEMO, REPLACE EXTERIOR SOUTH ELEVATION GLASS DOOR WITH NEW METAL DOOR AND FINISHES Status: Issued | Not published | — |
| applied Jan 7 | #2025-001184-000-00-FA Facility Permit · Alteration power, data, fire alarm, Nurse call - PPMC NORTH PAVILION CANCER CENTER 9-10 FLRS; DEMO WALLS, NEW WALLS TO CREATE STAFF RMS, PATIENT RMS, RESTRMS, FAMILY RM, CORRIDORS, NOURISH RMS, WORK RMS, LINEN RMS, SOILED UTILITY RMS, CLEAN SUPPLY RMS, STORAGE RMS, MEDS RMS, SINK & EQUIP ALCOVES, STAFF… Status: Final | Not published | — |
| applied Jul 7 | #2024-106464-DFS-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC NORTH PAVILION CANCER CENTER 9-10 FLRS; DFS FOR SUSPENDED CEILING Status: Final | Not published | $638K |
| applied Apr 30 | #2024-037018-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL EMERGENCY DEPARTMENT SECTOR A & B REMODEL 1ST FLR INT & EXT; DEMO WALLS, EXT - INFILL EXISTING OPENING, CREATE NEW VESTIBULE DOOR & DOOR, INT - NEW WALLS TO CREATE SUB WAITING RM, EXAM RMS, SECURITY RM, RECEPTION AREA, RESTRMS, X-RAY RM, BLOOD DRAW RM, TRIAGE RMS,… Status: Final | Not published | — |
| applied Jan 13 | #2025-002790-000-00-FA Facility Permit · Alteration FULL PDOX PROCESS/ PPMC NORTH PAVILION CANCER CENTER 9-10 FLRS; DEMO WALLS, NEW WALLS TO CREATE STAFF RMS, PATIENT RMS, RESTRMS, FAMILY RM, CORRIDORS, NOURISH RMS, WORK RMS, LINEN RMS, SOILED UTILITY RMS, CLEAN SUPPLY RMS, STORAGE RMS, MEDS RMS, SINK & EQUIP ALCOVES, STAFF BREAK/LOCKER RMS,… Status: Final | Not published | — |
| applied Jun 16 | #2025-047514-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE MEDICAL CENTER 8TH FLR TI; ADDING 1 NEW SMOKE DETECTOR, 2 NEW CHIME STROBES, IN 2 DIFFERENT SLEEP ROOMS, 7M05 & 8M01 Status: Final | Not published | $5.8K |
| applied Jun 16 | #2025-047546-000-00-FA Facility Permit · Alteration fire alarm - PROVIDENCE MEDICAL CENTER 8TH FLR TI; NO CONSTRUCTION - REVIEW ONLY TO CONFIRM OF CHANGE OF USE FOR RMS 7M05 & 8M01 FROM OFFICES TO SLEEP RMS Status: Final | Not published | — |
| applied Jun 10 | #2025-045859-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE MEDICAL CENTER 8TH FLR TI; NO CONSTRUCTION - REVIEW ONLY TO CONFIRM OF CHANGE OF USE FOR RMS 7M05 & 8M01 FROM OFFICES TO SLEEP RMS Status: Issued | Not published | — |
| applied Jun 6 | #2025-044877-000-00-FA Facility Permit · Alteration hvac control - PPMC CANCER CENTER FAN REPLACEMENT; INSTALL EXHAUST FANS, SUPPLY FANS AND ELEC Status: Final | Not published | — |
| applied May 27 | #2025-041355-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PORTLAND PROVIDENCE HOSPITAL FIRE ALARM BASEMENT; UPGRADE REMAINING ZONE DEVICES IN B LEVEL OF PROVIDENCE HALL TO MAPNET, 11 SMOKE DETECTORS, 3 PULL STATIONS Status: Final | Not published | $7K |
| applied May 28 | #2025-041876-000-00-FA Facility Permit · Alteration PORTLAND PROVIDENCE HOSPITAL FIRE ALARM BASEMENT; UPGRADE REMAINING ZONE DEVICES IN B LEVEL OF PROVIDENCE HALL TO MAPNET, 11 SMOKE DETECTORS, 3 PULL STATIONS Status: Final | Not published | — |
| applied May 27 | #2025-041350-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PORTLAND PROVIDENCE HOSPITAL FIRE ALARM BASEMENT; UPGRADE REMAINING ZONE DEVICES IN B LEVEL OF PROVIDENCE HALL TO MAPNET, 11 SMOKE DETECTORS, 3 PULL STATIONS Status: Issued | Not published | — |
| applied Jan 3 | #2024-106464-000-00-FA Facility Permit · Alteration FULL PDOX PROCESS/ PPMC NORTH PAVILION CANCER CENTER 9-10 FLRS; DEMO WALLS, NEW WALLS TO CREATE STAFF RMS, PATIENT RMS, RESTRMS, FAMILY RM, CORRIDORS, NOURISH RMS, WORK RMS, LINEN RMS, SOILED UTILITY RMS, CLEAN SUPPLY RMS, STORAGE RMS, MEDS RMS, SINK & EQUIP ALCOVES, STAFF BREAK/LOCKER RMS,… Status: Final | Not published | $49M |
| applied Jan 3 | #2024-106465-000-00-FA Facility Permit · Alteration FULL PDOX PROCESS/ PPMC NORTH PAVILION CANCER CENTER 9-10 FLRS; INSTALL EXHAUST FANS, TERMINAL UNITS, HOT WATER REHEAT COILS, CHILLED WATER FAN COILS, DUCTWORK, DIFFUSERS, GRILLES, MED GAS, PIPING Status: Final | Not published | $3M |
| applied May 8 | #2025-036620-000-00-FA Facility Permit · Alteration PPMC 5flr 5SM5; Add 120V Quad receptacle on normal power for monitors. Pull low voltage cables (43) for 41 cameras and two monitors Status: Issued | Not published | — |
| applied May 8 | #2025-036621-000-00-FA Facility Permit · Alteration power, data -PPMC 5flr 5SM5; Add 120V Quad receptacle on normal power for monitors. Pull low voltage cables (43) for 41 cameras and two monitors Status: Final | Not published | — |
| applied Apr 23 | #2025-032150-000-00-FA Facility Permit · Alteration nurse call - PPMC HOSPITAL EMERGENCY DEPARTMENT TI BASEMENT, 1ST, 2ND & 3RD FLRS, PENTHOUSE; ALL FLRS DEMO WALLS, NEW WALLS TO CREATE, BASEMENT - OFFICES, PHONE/HUDDLE RM, CONF/ED RM, RESTRMS, DRESSING RMS, LOCKER RMS, REMODEL STORAGE RMS, OFFICE HOSPITALISTS AREA, 1ST FLR - ADMITTING AREA,… Status: Final | Not published | — |
| applied Apr 22 | #2025-031523-000-00-FA Facility Permit · Alteration data - PPMC HOSPITALIST OFFICE TI STE G FLR B; DEMO WALLS, NEW WALLS TO CREATE CONF RM, SHARED OFFICE, OFFICE HOSPITALISTS AREA, STAFF AREA, INFILL DOORWAY, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Apr 7 | #2024-022501-DFS-03-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL EMERGENCY DEPARTMENT TI BASEMENT, 1ST, 2ND & 3RD FLRS, PENTHOUSE; DFS FOR MEP SEISMIC SUPPORTS Status: Final | Not published | $50K |
| applied Apr 3 | #2025-026029-000-00-FA Facility Permit · Alteration hvac stats - PPMC HOSPITAL EMERGENCY DEPARTMENT SECTOR A & B REMODEL 1ST FLR INT & EXT; DEMO WALLS, EXT - INFILL EXISTING OPENING, CREATE NEW VESTIBULE DOOR & DOOR, INT - NEW WALLS TO CREATE SUB WAITING RM, EXAM RMS, SECURITY RM, RECEPTION AREA, RESTRMS, X-RAY RM, BLOOD DRAW RM, TRIAGE RMS,… Status: Final | Not published | — |
| applied Feb 27 | #2025-015888-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITALIST OFFICE TI STE G FLR B; RECONFIGURE AND ADD DEVICES IN EXISTING SPACE TO ACCOMMODATE CHANGE IN SPACE, 5 SMOKE DETECTORS, 4 STROBES, 2 HORNS/STROBES Status: Final | Not published | $12.5K |
| applied Feb 26 | #2025-015170-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITALIST OFFICE TI STE G FLR B; ADD 23 HEADS FOR NEW CEILING AND WALL LAYOUT IN TENANT IMPROVEMENT, 23 HEADS Status: Final | Not published | $5K |
| applied Feb 27 | #2025-015855-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL EMERGENCY DEPARTMENT TI BASEMENT, 1ST, 2ND & 3RD FLRS, PENTHOUSE; 1ST FLOOR (WEST) BATHROOMS. EARLY TURN OVER IN EXISTING SPACE TO ACCOMMODATE CHANGE IN SPACE, 2 SMOKE DETECTORS, 2 STROBES Status: Final | Not published | $36K |
| applied Dec 23 | #2005-181937-000-00-ET Electrical Permit · Addition/Alteration/Replacement TEMP SERVICE 200 AMPS AND 2 TEMP 400AMPS OK PER M MCCOOL Status: Final | Not published | — |
| applied Dec 16 | #2024-105258-000-00-FA Facility Permit · Alteration power, fire alarm - PPMC HOSPITALIST OFFICE TI STE G FLR B; DEMO WALLS, NEW WALLS TO CREATE CONF RM, SHARED OFFICE, OFFICE HOSPITALISTS AREA, STAFF AREA, INFILL DOORWAY, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Feb 20 | #2025-013536-000-00-FA Facility Permit · Alteration Replace existing feeder conductors from Cooling Tower Control enclosure back to source. Status: Issued | Not published | — |
| applied Feb 20 | #2025-013537-000-00-FA Facility Permit · Alteration Replace existing feeder conductors from Cooling Tower Control enclosure back to source. Status: Final | Not published | — |
| applied Feb 19 | #2025-013435-000-00-FA Facility Permit · Alteration data, access - PPMC HOSPITAL EMERGENCY DEPARTMENT SECTOR A & B REMODEL 1ST FLR INT & EXT; DEMO WALLS, EXT - INFILL EXISTING OPENING, CREATE NEW VESTIBULE DOOR & DOOR, INT - NEW WALLS TO CREATE SUB WAITING RM, EXAM RMS, SECURITY RM, RECEPTION AREA, RESTRMS, X-RAY RM, BLOOD DRAW RM, TRIAGE RMS,… Status: Final | Not published | — |
| applied Feb 6 | #2025-010088-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL EMERGENCY DEPARTMENT TI BASEMENT, 1ST, 2ND & 3RD FLRS, PENTHOUSE; INSTALL RELAYS AT EACH OF (4) DOORS TO RELEASE LOCKS UPON FIRE EVENT Status: Final | Not published | $6.5K |
| applied Feb 6 | #2025-010125-000-00-FA Facility Permit · Alteration fire alarm T-taps - PPMC HOSPITAL EMERGENCY DEPARTMENT TI BASEMENT, 1ST, 2ND & 3RD FLRS, PENTHOUSE; ALL FLRS DEMO WALLS, NEW WALLS TO CREATE, BASEMENT - OFFICES, PHONE/HUDDLE RM, CONF/ED RM, RESTRMS, DRESSING RMS, LOCKER RMS, REMODEL STORAGE RMS, OFFICE HOSPITALISTS AREA, 1ST FLR - ADMITTING AREA,… Status: Final | Not published | — |
| applied Dec 31 | #2024-108377-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC PET/CT REPLACEMENT BASEMENT; INSTALL CHILLED WATER FAN COIL UNIT, REHEAT COILS, MED GAS, DUCTWORK, DIFFUSERS, GRILLES AND PIPING Status: Final | Not published | $215K |
| applied Dec 31 | #2024-108376-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC PET/CT REPLACEMENT BASEMENT; DEMO WALLS, NEW WALLS TO CREATE RESTRM, PATIENT HOLD RMS, CONTROL RM, PET/CT SCAN RM, INSTALL PATIENT LIFT, REMODEL CARDIO EXAM RM BH28, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $1.1M |
| applied Jan 8 | #2024-022501-DFS-02-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL EMERGENCY DEPARTMENT TI BASEMENT, 1ST, 2ND & 3RD FLRS, PENTHOUSE; DFS FOR SEISMIC ATTACHMENTS FOR HVAC AND PIPING Status: Final | Not published | $20K |
| applied Dec 12 | #2024-104424-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL WEST PARKING GARAGE ELEVATOR ALL FLRS; INSTALL SPLIT SYSTEM, PIPING AND ELEC Status: Final | Not published | $18.7K |
| applied Dec 13 | #2024-104944-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC CANCER CENTER FAN REPLACEMENT; INSTALL EXHAUST FANS, SUPPLY FANS AND ELEC Status: Final | Not published | $680K |
| applied Dec 12 | #2024-104421-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL WEST PARKING GARAGE ELEVATOR ALL FLRS; DEMO WALLS, NEW WALLS TO CREATE ELEVATOR ENTRY/LOBBY, REMODEL EXISTING ELEVATOR SHAFT, FINISHES AND ELEC Status: Final | Not published | $429K |
| applied Dec 31 | #2024-108367-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC PET/CT REPLACEMENT BASEMENT; DEMO WALLS, NEW WALLS TO CREATE RESTRM, PATIENT HOLD RMS, CONTROL RM, PET/CT SCAN RM, INSTALL PATIENT LIFT, REMODEL CARDIO EXAM RM BH28, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Dec 10 | #2024-103635-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL EMERGENCY DEPARTMENT SECTOR A & B REMODEL 1ST FLR INT & EXT; ADD/RELOCATE PENDENT FIRE SPRINKLERS FOR NEW WALL/CEILING LAYOUT, 197 HEADS Status: Final | Not published | $49.8K |
| applied Dec 13 | #2024-104884-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITALIST OFFICE TI STE G FLR B; INSTALL TERMINAL UNITS, DUCTWORK, DIFFUSERS, GRILLES AND ELEC Status: Final | Not published | $100K |
| applied Dec 13 | #2024-104883-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITALIST OFFICE TI STE G FLR B; DEMO WALLS, NEW WALLS TO CREATE CONF RM, SHARED OFFICE, OFFICE HOSPITALISTS AREA, STAFF AREA, INFILL DOORWAY, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $542K |
| applied Dec 16 | #2024-105148-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE HOSPITAL FIRE ALARM 2ND FLR; ADD 1 SMOKE DETECTOR AND 1 CHIME/STROBE EACH TO ROOMS 2E18 AND 2E20, 2 SMOKE DETECTORS, 2 HORN/STROBES Status: Issued | Not published | $4.6K |
| applied Nov 25 | #2024-100069-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE HOSPITAL FIRE ALARM TI; REPLACE 2 FIRE ALARM MONITORING DEVICES ON SPRINKLER RISER SERVING HELIPAD, ADD 1 MONITOR FOR 120V CIRCUIT SERVING THE HEAT TRACE ON THE RISER Status: Final | Not published | $5K |
| applied Dec 20 | #2024-106672-000-00-FA Facility Permit · Alteration power - PPMC HOSPITAL WEST PARKING GARAGE ELEVATOR ALL FLRS; DEMO WALLS, NEW WALLS TO CREATE ELEVATOR ENTRY/LOBBY, REMODEL EXISTING ELEVATOR SHAFT, FINISHES AND ELEC Status: Final | Not published | — |
| applied Dec 19 | #2024-106461-000-00-FA Facility Permit · Alteration FULL PDOX PROCESS/ PPMC NORTH PAVILION CANCER CENTER 9-10 FLRS; DEMO WALLS, NEW WALLS TO CREATE STAFF RMS, PATIENT RMS, RESTRMS, FAMILY RM, CORRIDORS, NOURISH RMS, WORK RMS, LINEN RMS, SOILED UTILITY RMS, CLEAN SUPPLY RMS, STORAGE RMS, MEDS RMS, SINK & EQUIP ALCOVES, STAFF BREAK/LOCKER RMS,… Status: Issued | Not published | — |
| applied Dec 18 | #2024-105993-000-00-FA Facility Permit · Alteration power - PPMC CANCER CENTER FAN REPLACEMENT; INSTALL EXHAUST FANS, SUPPLY FANS AND ELEC Status: Final | Not published | — |
| applied Dec 17 | #2024-105551-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITALIST OFFICE TI STE G FLR B; DEMO WALLS, NEW WALLS TO CREATE CONF RM, SHARED OFFICE, OFFICE HOSPITALISTS AREA, STAFF AREA, INFILL DOORWAY, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, DEMO 1-SINK, INSTALL 1-SINK Status: Final | Not published | — |
| applied Dec 16 | #2024-105147-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE HOSPITAL FIRE ALARM 2ND FLR; ADD 1 SMOKE DETECTOR AND 1 CHIME/STROBE EACH TO ROOMS 2E18 AND 2E20, 2 SMOKE DETECTORS, 2 HORN/STROBES Status: Issued | Not published | — |
| applied Dec 16 | #2024-105149-000-00-FA Facility Permit · Alteration fire alarm - PROVIDENCE HOSPITAL FIRE ALARM 2ND FLR; ADD 1 SMOKE DETECTOR AND 1 CHIME/STROBE EACH TO ROOMS 2E18 AND 2E20, 2 SMOKE DETECTORS, 2 HORN/STROBES Status: Final | Not published | — |
| applied Dec 13 | #2024-104942-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC CANCER CENTER FAN REPLACEMENT; INSTALL EXHAUST FANS, SUPPLY FANS AND ELEC Status: Issued | Not published | — |
| applied Dec 13 | #2024-104880-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITALIST OFFICE TI STE G FLR B; DEMO WALLS, NEW WALLS TO CREATE CONF RM, SHARED OFFICE, OFFICE HOSPITALISTS AREA, STAFF AREA, INFILL DOORWAY, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Dec 12 | #2024-104420-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL WEST PARKING GARAGE ELEVATOR ALL FLRS; DEMO WALLS, NEW WALLS TO CREATE ELEVATOR ENTRY/LOBBY, REMODEL EXISTING ELEVATOR SHAFT, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Dec 9 | #2024-103299-000-00-FA Facility Permit · Alteration nurse call - PPMC HOSPITAL EMERGENCY DEPARTMENT TI BASEMENT, 1ST, 2ND & 3RD FLRS, PENTHOUSE; ALL FLRS DEMO WALLS, NEW WALLS TO CREATE, BASEMENT - OFFICES, PHONE/HUDDLE RM, CONF/ED RM, RESTRMS, DRESSING RMS, LOCKER RMS, REMODEL STORAGE RMS, OFFICE HOSPITALISTS AREA, 1ST FLR - ADMITTING AREA,… Status: Final | Not published | — |
| applied Nov 20 | #2024-098985-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE PORTLAND MEDICAL CENTER STAIR SECURITY UPGRADES ALL FLRS TI; PROVIDE (4) FIRE ALARM RELAYS FOR EGRESS Status: Final | Not published | $5.2K |
| applied Nov 12 | #2024-096616-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE PORTLAND MEDICAL CENTER STAIR SECURITY UPGRADES ALL FLRS TI; MINOR DEMO, INSTALL NEW DOOR CARD READERS & LOCKS AT STAIR CASES, FINISHES AND ELEC Status: Final | Not published | $102K |
| applied Nov 25 | #2024-070757-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC HOSPITAL EMERGENCY DEPARTMENT TI BASEMENT, 1ST, 2ND & 3RD FLRS, PENTHOUSE; REVISION TO REFLECTED CEILING AND SPRINKLER LAYOUT Status: Final | Not published | — |
| applied Nov 20 | #2024-099150-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE HOSPITAL FIRE ALARM 2ND FLR TI; CONVERT 1 EXISTING HEAT DETECTOR AND 3 EXISTING MONITORING DEVICES TO MAPNET DEVICES, ADD 1 MONITOR FOR LOW AIR PRESSURE IN 2FM8 Status: Final | Not published | $35.7K |
| applied Nov 25 | #2024-100067-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE HOSPITAL FIRE ALARM TI; REPLACE 2 FIRE ALARM MONITORING DEVICES ON SPRINKLER RISER SERVING HELIPAD, ADD 1)MONITOR FOR 120V CIRCUIT SERVING THE HEAT TRACE ON THE RISER Status: Issued | Not published | — |
| applied Nov 25 | #2024-100113-000-00-FA Facility Permit · Alteration power, fire alarm PROVIDENCE HOSPITAL FIRE ALARM TI; REPLACE 2 FIRE ALARM MONITORING DEVICES ON SPRINKLER RISER SERVING HELIPAD, ADD 1)MONITOR FOR 120V CIRCUIT SERVING THE HEAT TRACE ON THE RISER Status: Final | Not published | — |
| applied Sep 10 | #2024-078332-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC LINAC 2 REPLACEMENT TUNNEL LEVEL TI; DEMO WALLS, NEW WALLS TO CREATE TREATMENT LINEAR ACCELERATOR RM, REMODEL CONTROL RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-SINK Status: Final | Not published | — |
| applied Nov 21 | #2024-099247-000-00-FA Facility Permit · Alteration fire alarm- PROVIDENCE HOSPITAL FIRE ALARM 2ND FLR TI; CONVERT 1 EXISTING HEAT DETECTOR AND 3 EXISTING MONITORING DEVICES TO MAPNET DEVICES, ADD 1 MONITOR FOR LOW AIR PRESSURE IN 2FM8 Status: Final | Not published | — |
| applied Nov 21 | #2024-099245-000-00-FA Facility Permit · Alteration access, fire alarm - PROVIDENCE PORTLAND MEDICAL CENTER STAIR SECURITY UPGRADES ALL FLRS TI; MINOR DEMO, INSTALL NEW DOOR CARD READERS & LOCKS AT STAIR CASES, FINISHES AND ELEC Status: Final | Not published | — |
| applied Nov 20 | #2024-099147-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE HOSPITAL FIRE ALARM 2ND FLR TI; CONVERT 1 EXISTING HEAT DETECTOR AND 3 EXISTING MONITORING DEVICES TO MAPNET DEVICES, ADD 1 MONITOR FOR LOW AIR PRESSURE IN 2FM8 Status: Issued | Not published | — |
| applied Nov 1 | #2024-094075-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC CANCER CENTER SERVICE ELEVATOR #56 ALL FLRS; MINOR DEMO, INSTALL NEW SERVICE ELEVATOR IN EXISTING SHAFT, STEEL PIT LADDER, CREATE ACCESS DOOR OPENINGS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $1.6M |
| applied Nov 1 | #2024-094076-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC CANCER CENTER SERVICE ELEVATOR #56 ALL FLRS; INSTALL DUCTWORK AND GRILLE Status: Final | Not published | $2K |
| applied Nov 12 | #2024-096615-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE PORTLAND MEDICAL CENTER STAIR SECURITY UPGRADES ALL FLRS TI; MINOR DEMO, INSTALL NEW DOOR CARD READERS & LOCKS AT STAIR CASES, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Oct 24 | #2024-072311-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC LINAC 2 REPLACEMENT TUNNEL LEVEL TI; VALUE ADDED REVISION TO CHANGE EXISTING PIT ANCHORS Status: Final | Not published | $4.5K |
| applied Nov 6 | #2024-095228-000-00-FA Facility Permit · Alteration power - PPMC CANCER CENTER SERVICE ELEVATOR #56 ALL FLRS; MINOR DEMO, INSTALL NEW SERVICE ELEVATOR IN EXISTING SHAFT, STEEL PIT LADDER, CREATE ACCESS DOOR OPENINGS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Oct 25 | #2024-091946-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC FIRE LIFE SAFETY UPGRADE 3F 3RD FLR; MODIFICATIONS TO EXISTING FIRE ALARM CIRCUITS TO ACCOMMODATE MONITORING OF (2) FSD'S VIA RELAYS Status: Final | Not published | $5.1K |
| applied Nov 5 | #2024-094925-000-00-FA Facility Permit · Alteration data - PPMC MAMMOGRAPHY REMODEL 1N 1ST FLR; DEMO WALL, NEW WALL TO CREATE STAFF RM, MAMMO RM, INFILL DOOR, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Nov 1 | #2024-094070-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPMC CANCER CENTER SERVICE ELEVATOR #56 ALL FLRS; MINOR DEMO, INSTALL NEW SERVICE ELEVATOR IN EXISTING SHAFT, STEEL PIT LADDER, CREATE ACCESS DOOR OPENINGS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |