Commercial General Building, Electrical work permitted November 12, 2024, with 26 permits through October 8, 2026, declaring $582,773 of work.
SINGLE PDF PROCESS/ PROVIDENCE OFFICE PARK POP3 HVAC REPLACEMENT ROOF; INSTALL CHILLER, HEAT PUMP, WATER SOURCE PUMP, EXPANSION TANK, SEPARATOR, BUFFER TANK, DIFFUSERS, PIPING, AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
26 permits issued Nov 12 – Oct 8, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 7 | #2026-074602-000-00-ET Electrical Permit · Addition/Alteration/Replacement Replacing existing fluorescent light fixtures with LED retrofit kits Status: Issued | Not published | — |
#2025-074191-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE OFFICE PARK POP3 HVAC REPLACEMENT ROOF; INSTALL CHILLER, HEAT PUMP, WATER SOURCE PUMP, EXPANSION TANK, SEPARATOR, BUFFER TANK, DIFFUSERS, PIPING, AND ELEC Status: Issued |
| Not published |
| $389K |
| applied Jan 16 | #2026-003901-000-00-FA Facility Permit · Alteration PPMC POP 2 - add new circuit for campus sign Status: Issued | Not published | — |
| applied Jan 16 | #2026-003903-000-00-FA Facility Permit · Alteration PPMC POP 2 - add new circuit for campus sign Status: Final | Not published | — |
| applied Jan 15 | #2026-003684-000-00-FA Facility Permit · Alteration POP 2 - Add (2) circuits 6th floor copy room. Status: Final | Not published | — |
| applied Jan 15 | #2026-003683-000-00-FA Facility Permit · Alteration POP 2 - Add (2) circuits 6th floor copy room. Status: Issued | Not published | — |
| applied Oct 16 | #2025-084449-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE OFFICE PARK 2 6TH FLR & ROOF HVAC UPGRADE; INSTALL MINI SPLITS, ROOF TOP CONDENSERS AND ELEC Status: Final | Not published | $31K |
| applied Oct 20 | #2025-085283-000-00-FA Facility Permit · Alteration power - PROVIDENCE OFFICE PARK 2 6TH FLR & ROOF HVAC UPGRADE; INSTALL MINI SPLITS, ROOF TOP CONDENSERS AND ELEC Status: Final | Not published | — |
| applied Oct 16 | #2025-084446-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE OFFICE PARK 2 6TH FLR & ROOF HVAC UPGRADE; INSTALL MINI SPLITS, ROOF TOP CONDENSERS AND ELEC Status: Issued | Not published | — |
| applied Sep 11 | #2025-074187-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE OFFICE PARK POP3 HVAC REPLACEMENT ROOF; INSTALL CHILLER, HEAT PUMP, WATER SOURCE PUMP, EXPANSION TANK, SEPARATOR, BUFFER TANK, DIFFUSERS, PIPING, AND ELEC Status: Issued | Not published | — |
| applied Aug 6 | #2025-063453-000-00-FA Facility Permit · Alteration POP 3 - NW Natural Modem Power - (1) circuit for NW Natural modem power. CBRE contact: Dale Powlison (dale.powlison@cbre.com) **// NOTE this permit was rough in to outside disconnect only, no connection to any equipment at this time. Status: Final | Not published | — |
| applied Aug 6 | #2025-063450-000-00-FA Facility Permit · Alteration POP 3 - NW Natural Modem Power - (1) circuit for NW Natural modem power. CBRE contact: Dale Powlison (dale.powlison@cbre.com) Status: Issued | Not published | — |
| applied Apr 24 | #2025-032365-000-00-FA Facility Permit · Alteration POP 1 Compassus Modem Installation - Provide (1) Dedicated 20 amp, 120 volt circuit for Modem. Provide IDJ conductor from Panel to Rack. Status: Final | Not published | — |
| applied Apr 24 | #2025-032360-000-00-FA Facility Permit · Alteration POP 1 Compassus Modem Installation - Provide (1) Dedicated 20 amp, 120 volt circuit for Modem. Provide IDJ conductor from Panel to Rack. Status: Issued | Not published | — |
| applied Jan 15 | #2025-003507-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ POP3 LABCORP SMT LEVEL 2 TI; ADD ONE SMOKE DETECTORON EXISTING CIRCUIT IN SMT 200.13, CHANGE SETTING FROM 75 TO 110 CANDELA ON EXISTING CEILING MOUNTED STROBE, 1 SMOKE DETECTOR Status: Final | Not published | $4.8K |
| applied Jan 21 | #2025-004870-000-00-FA Facility Permit · Alteration POP3 LABCORP SMT LEVEL 2 TI - ADD/RELOCATE (2) FIRE SPRINKER HEADS TO ACCOMMODATE NEW WALL, CEILING LAYOUT, AND WALK-IN COOLER TI Status: Final | Not published | — |
| applied Jan 13 | #2025-002680-000-00-FA Facility Permit · Alteration POP 1 #209 - (8) circuit modifications for kitchenette, work stations, and printers Status: Issued | Not published | — |
| applied Jan 13 | #2025-002683-000-00-FA Facility Permit · Alteration POP 1 #209 - (8) circuit modifications for kitchenette, work stations, and printers Status: Final | Not published | — |
| applied Sep 12 | #2024-078811-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PROVIDENCE OFFICE PARK BLDG 3 REROOF TI; REROOF ENTIRE BUILDING, INSTALL ROOF NEW CRICKETS, PLUMB AND ELEC, 6-ROOF DRAINS, 6-OVERFLOW DRAINS Status: Final | Not published | — |
| applied Nov 14 | #2024-097290-000-00-FA Facility Permit · Alteration power-POP3 LABCORP SMT LEVEL 2 TI; MINOR DEMO, REMODEL OPEN OFFICE AREA, PRINTER/MAIL RM, LAB AREA, NEW WALLS TO CREATE WALK IN COOLER, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Nov 19 | #2024-098419-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ POP3 LABCORP SMT LEVEL 2 TI; MINOR DEMO, REMODEL OPEN OFFICE AREA, PRINTER/MAIL RM, LAB AREA, NEW WALLS TO CREATE WALK IN COOLER, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, DEMO 1-SINK, INSTALL 1-EYEWASH, 1-HAND SINK Status: Final | Not published | — |
| applied Dec 9 | #2024-103072-000-00-FA Facility Permit · Alteration security cameras - PROVIDENCE OFFICE PARK BLDG 3 REROOF TI; REROOF ENTIRE BUILDING, INSTALL ROOF NEW CRICKETS, PLUMB AND ELEC Status: Final | Not published | — |
| applied Nov 12 | #2024-096573-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ POP3 LABCORP SMT LEVEL 2 TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS, WALK IN COOLER, PLUMB AND ELEC Status: Final | Not published | $11.3K |
| applied Nov 12 | #2024-096572-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ POP3 LABCORP SMT LEVEL 2 TI; MINOR DEMO, REMODEL OPEN OFFICE AREA, PRINTER/MAIL RM, LAB AREA, NEW WALLS TO CREATE WALK IN COOLER, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $147K |
| applied Nov 14 | #2024-097295-000-00-FA Facility Permit · Alteration data-POP3 LABCORP SMT LEVEL 2 TI; MINOR DEMO, REMODEL OPEN OFFICE AREA, PRINTER/MAIL RM, LAB AREA, NEW WALLS TO CREATE WALK IN COOLER, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Nov 12 | #2024-096570-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ POP3 LABCORP SMT LEVEL 2 TI; MINOR DEMO, REMODEL OPEN OFFICE AREA, PRINTER/MAIL RM, LAB AREA, NEW WALLS TO CREATE WALK IN COOLER, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |