Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Portland, OR
Multifamily General Building, Electrical, Fire Protection, Plumbing work permitted April 1, 2025, with 24 permits through July 13, 2026, declaring $791,675 of work.
M. CARTER COMMONS - DFS-11- Electrical Seismic Attachments
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
24 permits issued Apr 1 – Jul 13, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Feb 5 | #2024-037129-DFS-10-CO Commercial Building Permit · New Construction M. CARTER COMMONS - DFS-10- Plumbing Seismic Attachments Status: Final | Not published | $76K |
| applied Mar 23 | #2026-020561-000-00-FS Fire Systems Permit · New HAZARDOUS/TANK - INSTALLING BACKUP POWER GENERATOR Status: Final | Not published | — |
| applied Mar 4 | #2025-101931-REV-01-CO Commercial Building Permit · Alteration SINGLEPDF - REVISION TO CHANGE TO MODULE AND ATTACHMENT LAYOUT Status: Final | Not published | — |
| applied Feb 5 | #2024-037129-DFS-11-CO Commercial Building Permit · New Construction M. CARTER COMMONS - DFS-11- Electrical Seismic Attachments Status: Final | Not published | $210K |
| applied Aug 22 | #2024-037129-DFS-06-CO Commercial Building Permit · New Construction M. CARTER COMMONS - DFS-06 - Mechanical Seismic restraints Status: Final | Not published | $6.8K |
| applied Feb 5 | #2024-037129-DFS-09-CO Commercial Building Permit · New Construction M. CARTER COMMONS -DFS-09- Sunshades Status: Final | Not published | $25K |
| applied Oct 10 | #2024-037129-DFS-08-CO Commercial Building Permit · New Construction M. CARTER COMMONS - DFS-08- Ships Ladder **2/25/26 minor corrections to sheets S605 & S610 by EoR allowed by PP&D Structural to be reviewed/approved through this DFS. See comments. Status: Final | Not published | $6K |
| applied Jul 16 | #2024-037129-DFS-04-CO Commercial Building Permit · New Construction M. CARTER COMMONS - DFS-04- Aluminum Framed Storefronts **Includes minor corrections to S502 * S801 by EoR. See comments Status: Final | Not published | $181K |
| applied Sep 2 | #2024-037129-DFS-07-CO Commercial Building Permit · New Construction ***7/13/26 PPD C.COWEN - SEE DFS-10 for Calc update, more info in comments.*** M. CARTER COMMONS - DFS-07- Trusses Status: Final | Not published | $74.7K |
| applied Dec 19 | #2024-037129-REV-04-CO Commercial Building Permit · New Construction M. CARTER COMMONS REV-04 - Provide Engineering/calcs for exterior cold formed metal framing and sunshades, remove both from deferred submittal list. Status: Final | Not published | — |
| applied Jan 6 | #2025-101934-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX - SOLAR INSTALLATION OF 53.35 KW SOLAR SYSTEM Status: Final | Not published | — |
| applied Dec 21 | #2025-101931-000-00-CO Commercial Building Permit · Alteration SINGLEPDF - SOLAR INSTALLATION OF 53.35KW ROOF MOUNTED PV SYSTEM - ENGINEERED Status: Final | Not published | $24.9K |
| applied Jan 12 | #2026-002219-000-00-FS Fire Systems Permit · New UNDERGROUND - INSTALL NEW FIRE LINE TO BUILDING & CONNECT TO EXISTING WATER SERVICE AT NORTH OVERLOOK BLVD Status: Final | Not published | — |
| applied Oct 27 | #2024-037129-REV-03-CO Commercial Building Permit · New Construction M. CARTER COMMONS - REV-03 - **12/15/25 changed description of work to say "add premanufactured sunshades to DFS list" see comments** Relocate solar batteries with inverters from roof to ground level between retaining wall and west exterior wall; remove canopies from DFS list and add… Status: Final | Not published | — |
| applied Sep 30 | #2025-079819-000-00-ET Electrical Permit · New Construction Low volt electrical for HVAC controls Status: Final | Not published | — |
| applied Sep 24 | #2025-077221-000-00-FS Fire Systems Permit · New ALARM - NEW FIRE ALARM INSTALL Status: Final | Not published | — |
| applied Jul 9 | #2024-037129-REV-02-CO Commercial Building Permit · New Construction M. CARTER COMMONS - REV-02 - Revise domestic water and fire service connection to existing city main; revise water meter and RPDA vault locations Status: Final | Not published | — |
| applied Apr 21 | #2025-030666-000-00-FS Fire Systems Permit · New SPRINKLER - INSTALL FIRE SPRINKLER PROTECTION PER NFPA 13 2016 AND STANDPIPES PER NFPA 14 2016. START POINT IS 5FT OUTSIDE OF BUILDING. Status: Final | Not published | — |
| applied Jun 13 | #2024-037129-DFS-03-CO Commercial Building Permit · New Construction M. CARTER COMMONS -DFS-03- Vinyl Windows Status: Final | Not published | $136K |
| applied Apr 29 | #2024-037129-DFS-02-CO Commercial Building Permit · New Construction M. CARTER COMMONS -DFS-02 - Continuous Rod Hold Down Status: Final | Not published | — |
| applied Apr 1 | #2025-025203-000-00-PT Plumbing Permit · New Construction New construction of 63 units over a podium deck. Status: Final | Not published | — |
| applied Apr 2 | #2024-037129-REV-01-CO Commercial Building Permit · New Construction M. CARTER COMMONS - REV-01- Structural revision to mini splits mounting strategy Status: Final | Not published | — |
| applied Feb 6 | #2025-007870-000-00-ET Electrical Permit · New Construction PDOX ELECTRICAL INSTALLATION OF PODIUM STYLE APARTMENT BUILDING. 2500AMP SERVICE. 63 UNITS, LARGEST UNIT IS 581 SQFT. GENERATOR BACK UP. 11 HOUSE PANELS. OAR 918 REDUCED FEES APPLY ONLY TO RESIDENTIAL UNITS. 4 INSPECTIONS WILL BE ALLOWED PER FLOOR. Permit Includes: Access control, CCTV,… Status: Final | Not published | — |
| applied Mar 7 | #2024-037129-DFS-01-CO Commercial Building Permit · New Construction M. CARTER COMMONS -DFS-01 - PT Deck Status: Final | Not published | $51.1K |