Get ProEvery project in every city · from $79/mo
Get Procommercial project · Portland, OR
Commercial General Building, Electrical work permitted November 25, 2024, with 35 permits through October 15, 2026, declaring $32,226,737 of work.
FULL PDOX PROCESS/ OHSU HOSPITAL EMERGENCY DEPARTMENT REMODEL 8TH FLR; EXTERIOR - NEW WALLS TO CREATE UNCONDITIONED ENTRY VESTIBULE, ENTRY CANOPY, SIDEWALKS, RAMPS W/ HANDRAILS, BOLLARDS, SEAT WALLS, RETAINING WALLS, PARKING LOT UPDATES, INTERIOR - DEMO WALLS, NEW WALLS TO CREATE OHSU POLICE RM, PEDS ED WAITING AREA, BATHRMS, CT RMS, CONTROL RM, TRIAGE RMS, CHECK IN RM, NURSES STATIONS, TREATMENT RMS, CLEAN SUPPLY/MED RMS, SOILED WORKRMS, HOLDING AREAS, ELEC RMS, MECHANICAL SHAFT, STAFF LOCKER RMS, MEDICATION RM, TELECOM RM, PEDS ED FLEX RMS, EVS RM, CLEAN SUPPLY STORAGE RM, STAFF BREAK RM,…
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
35 permits issued Nov 25 – Oct 15, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 1 | #2026-064949-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HRC MEDICAL VACUUM SYSTEM RM 249 TI INT & EXT; EXT - ROOF EXHAUST, INT - MINOR DEMO, INSTALL HOUSEKEEPING PAD, ANCHORAGE, FLOORING, FINISHES, PIPING, PLUMB AND ELEC |
Status: Issued
| Not published |
| $269K |
| applied Sep 1 | #2026-064947-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HRC MEDICAL VACUUM SYSTEM RM 249 TI INT & EXT; EXT - ROOF EXHAUST, INT - MINOR DEMO, INSTALL HOUSEKEEPING PAD, ANCHORAGE, FLOORING, FINISHES, PIPING, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jun 16 | #2026-043957-000-00-FA Facility Permit · Alteration power- OHSU HRC 8flr-C803 Receptacle add Status: Final | Not published | — |
| applied Jun 16 | #2026-043954-000-00-FA Facility Permit · Alteration OHSU HRC 8flr -C803 Receptacle add Status: Issued | Not published | — |
| applied May 29 | #2026-039266-000-00-FA Facility Permit · Alteration OHSU HRC 8D09 add Quad Outlets off existing circuit Status: Issued | Not published | — |
| applied May 29 | #2026-039268-000-00-FA Facility Permit · Alteration power-OHSU HRC 8D09 add Quad Outlets off existing circuit Status: Final | Not published | — |
| applied Feb 9 | #2026-009781-000-00-FA Facility Permit · Alteration HRC 14D Status board power- new quad receptacle for monitor Status: Issued | Not published | — |
| applied Feb 9 | #2026-009782-000-00-FA Facility Permit · Alteration power-HRC 14D Status board power- new quad receptacle for monitor Status: Final | Not published | — |
| applied Nov 21 | #2025-095293-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HRC DENTAL EQUIPMENT ANCHORAGE RM 7D20 5TH FLR; INSTALL ANCHORAGE FOR DENTAL EQUIPMENT, CEILING, FLOORING, FINISHES Status: Final | Not published | $65.5K |
| applied Nov 25 | #2025-095789-000-00-FA Facility Permit · Alteration power, data - OHSU HRC DENTAL EQUIPMENT ANCHORAGE RM 7D20 5TH FLR; INSTALL ANCHORAGE FOR DENTAL EQUIPMENT, CEILING, FLOORING, FINISHES Status: Final | Not published | — |
| applied Jul 3 | #2025-051678-000-00-FA Facility Permit · Alteration FULL PDOX PROCESS/ OHSU HOSPITAL EMERGENCY DEPARTMENT REMODEL 8TH FLR; INSTALL DUCTWORK, GRILLES, DIFFUSERS, EXHAUST FANS, TERMINAL UNITS, PUMP, ELECTRIC HEATER, MED GAS, PIPING AND ELEC Status: Under Inspection | Not published | $3.2M |
| applied Jul 3 | #2025-051676-000-00-FA Facility Permit · Alteration FULL PDOX PROCESS/ OHSU HOSPITAL EMERGENCY DEPARTMENT REMODEL 8TH FLR; EXTERIOR - NEW WALLS TO CREATE UNCONDITIONED ENTRY VESTIBULE, ENTRY CANOPY, SIDEWALKS, RAMPS W/ HANDRAILS, BOLLARDS, SEAT WALLS, RETAINING WALLS, PARKING LOT UPDATES, INTERIOR - DEMO WALLS, NEW WALLS TO CREATE OHSU POLICE RM,… Status: Under Inspection | Not published | $26.5M |
| applied Nov 21 | #2025-095292-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HRC DENTAL EQUIPMENT ANCHORAGE RM 7D20 5TH FLR; INSTALL ANCHORAGE FOR DENTAL EQUIPMENT, CEILING, FLOORING, FINISHES Status: Issued | Not published | — |
| applied Oct 20 | #2025-085194-000-00-FA Facility Permit · Alteration OHSU HRC Penthouse Overhead Paging- Conduit for 10 low voltage paging speakers and 3 low voltage strobe lights 15D03, 15D05 &15D06 Status: Issued | Not published | — |
| applied Sep 9 | #2025-072924-000-00-FA Facility Permit · Alteration HRC 8ED Care Fit Monitor 8D23 120V circuit for monitor quad Status: Issued | Not published | — |
| applied Sep 9 | #2025-072925-000-00-FA Facility Permit · Alteration power-HRC 8ED Care Fit Monitor 8D23 120V circuit for monitor quad Status: Final | Not published | — |
| applied Aug 1 | #2022-167214-DFS-02-FA Facility Permit · Alteration SINGLE PDOX PROCESS/ OHSU HRC 11TH FLR TI; DFS EQUIPMENT SEISMIC CERTIFICATION Status: Final | Not published | — |
| applied May 22 | #2022-167214-DFS-01-FA Facility Permit · Alteration FULL PDOX PROCESS/ OHSU HRC 11TH FLR TI; DFS FOR SEISMIC FOR HVAC, PLUMBING AND NON-STRUCTURAL COMPONENTS Status: Final | Not published | — |
| applied Jun 30 | #2025-051672-000-00-FA Facility Permit · Alteration FULL PDOX PROCESS/ OHSU HOSPITAL EMERGENCY DEPARTMENT REMODEL 8TH FLR; EXTERIOR - NEW WALLS TO CREATE UNCONDITIONED ENTRY VESTIBULE, ENTRY CANOPY, SIDEWALKS, RAMPS W/ HANDRAILS, BOLLARDS, SEAT WALLS, RETAINING WALLS, PARKING LOT UPDATES, INTERIOR - DEMO WALLS, NEW WALLS TO CREATE OHSU POLICE RM,… Status: Issued | Not published | — |
| applied May 27 | #2024-072595-REV-03-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HRC MRI REFRESH 4TH FLR; VALUE ADDED REVISION TO MODIFY EXTERIOR WINDOWS FOR FUTURE MRI REPLACEMENTS AND FINISHES Status: Final | Not published | $13K |
| applied Apr 25 | #2022-167214-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HRC 11TH FLR TI; VALUE ADDED REVISION TO ADD METAL GRATE CATWALK W/ GUARDRAILS Status: Final | Not published | $50K |
| applied Apr 22 | #2025-031337-000-00-FA Facility Permit · Alteration OHSU HRC12 RE-CABLE: Install (313) CAT6A cables to 157 locations. Install new sound masking equipment. Demo out existing Cat cable. Status: Issued | Not published | — |
| applied Apr 22 | #2025-031338-000-00-FA Facility Permit · Alteration data, sound mask-OHSU HRC12 RE-CABLE: Install (313) CAT6A cables to 157 locations. Install new sound masking equipment. Demo out existing Cat cable. Status: Final | Not published | — |
| applied Mar 27 | #2024-072595-REV-02-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HRC MRI REFRESH 4TH FLR; REVISION TO CHANGE LOCATION OF STORAGE RM DOOR, DEMO WALL, NEW WALL TO CREATE DOORWAY, CEILING, FLOORING, FINISHES Status: Final | Not published | — |
| applied Feb 27 | #2024-072595-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HRC MRI REFRESH 4TH FLR; VALUE ADDED REVISION TO ADD STORAGE RM, REMOVE EQUIP RM CEILING FROM SCOPE, CEILING, FLOORING AND FINISHES Status: Final | Not published | $14K |
| applied Feb 27 | #2025-015718-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HRC 11TH FLR TI; REMODEL OF 11TH FLOOR FOR NEW GI BRONCHOSCOPY TREATMENT INCLUDING NEW DETECTION AND NOTIFICATION, 65 SMOKE DETECTORS, 5 PULL STATIONS, 35 HORN STROBES, 1 AUXILIARY PANEL Status: Final | Not published | $207K |
| applied Sep 10 | #2024-078339-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HRC MRI REFRESH 4TH FLR; DEMO WALLS, NEW WALLS TO CREATE MRI RM, CONTROL RM, PRE/POST RMS, LOCKER AREA, RESTRM, REPLACE MRI, INSTALL PATIENT LIFT, REMODEL EQUIPMENT RM, WAITING AREA, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 6-MEDICAL GAS OUTLETS, 2-SINKS,… Status: Final | Not published | — |
| applied Jan 21 | #2025-004976-000-00-FA Facility Permit · Alteration OHSU HRC MRI REFRESH 4TH FLR - INTALL, RELOCATE, AND DEMO A.S. TO NEW FLOOR/CEILING PLAN. MRI #1 TO BE NEW BRASS PIPE & NON-FERROUS METALS ONLY Status: Final | Not published | — |
| applied Jan 16 | #2025-003916-000-00-FA Facility Permit · Alteration equipment install- OHSU HRC MRI REFRESH 4TH FLR; DEMO WALLS, NEW WALLS TO CREATE MRI RM, CONTROL RM, PRE/POST RMS, LOCKER AREA, RESTRM, REPLACE MRI, INSTALL PATIENT LIFT, REMODEL EQUIPMENT RM, WAITING AREA, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Jan 14 | #2025-003199-000-00-ET Electrical Permit · Addition/Alteration/Replacement Replace an existing rotary UPS with new battery UPS and convert MRI Feeders from normal power to Critical Branch Power Status: Final | Not published | — |
| applied Dec 16 | #2024-105187-000-00-FA Facility Permit · Alteration power-OHSU HRC 8D01 quad power; Add new duplex from existing circuit Status: Final | Not published | — |
| applied Dec 16 | #2024-105186-000-00-FA Facility Permit · Alteration OHSU HRC 8D01 quad power; Add new duplex from existing circuit Status: Issued | Not published | — |
| applied Aug 23 | #2024-073325-000-00-FA Facility Permit · Alteration power, data, fire alarm - OHSU HRC MRI REFRESH 4TH FLR; DEMO WALLS, NEW WALLS TO CREATE MRI RM, CONTROL RM, PRE/POST RMS, LOCKER AREA, RESTRM, REPLACE MRI, INSTALL PATIENT LIFT, REMODEL EQUIPMENT RM, WAITING AREA, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Aug 21 | #2024-072597-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HRC MRI REFRESH 4TH FLR; INSTALL DUCTWORK, DIFFUSERS, GRILLES, PIPING AND ELEC Status: Final | Not published | $70K |
| applied Aug 21 | #2024-072595-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HRC MRI REFRESH 4TH FLR; DEMO WALLS, NEW WALLS TO CREATE MRI RM, CONTROL RM, PRE/POST RMS, LOCKER AREA, RESTRM, REPLACE MRI, INSTALL PATIENT LIFT, REMODEL EQUIPMENT RM, WAITING AREA, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $1.9M |