Get Procommercial project · Portland, OR
Commercial General Building, Electrical work permitted November 12, 2024, with 51 permits through October 22, 2026, declaring $8,533,163 of work.
SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; ROOF/EXT - VRF OUTDOOR UNITS, STEAM SILENCER, INT - STEAM BOILERS, HOT WATER PUMP, DEAERATOR FEEDWATER SYSTEM, CONDENSATE TANK, FUEL OIL PUMP, CONVERTER, BOILER, BLOWDOWN SEPARATOR, DUPLEX CONDENSATE PUMPS, AIR SEPARATOR, EXPANSION TANK, ENERGY RECOVERY VENTILATORS, EXHAUST FANS, HYDRONIC UNIT HEATERS, VRF WALL MOUNT UNITS, DRAFT FANS, FUEL POLISHER, DUCTWORK, DIFFUSERS, GRILLES, PIPING AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
51 permits issued Nov 12 – Oct 22, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 2 | #2025-006099-DFS-07-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; DFS FOR SEISMIC BRACING OF BOILER STACK |
Status: Issued
| Not published |
| $2K |
| applied Sep 14 | #2026-068123-000-00-ET Electrical Permit · Addition/Alteration/Replacement Furnish & Install HVAC Controls Status: Issued | Not published | — |
| applied Jul 30 | #2025-006099-REV-04-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; VALUE ADDED REVISION TO INSTALL INDEPENDENT FLUE PIPING SYSTEM Status: Issued | Not published | $16K |
| applied Jun 16 | #2026-044146-000-00-ET Electrical Permit · Addition/Alteration/Replacement Completing lighting upgrades to existing fixtures at the following buildings: Prexy McNaughton Foster/Scholtz Sports Center Status: Final | Not published | — |
| applied Jun 16 | #2026-044031-000-00-ET Electrical Permit · Addition/Alteration/Replacement Completing lighting upgrades to existing fixtures at the following buildings: Old Dorm Anna Mann Performing Arts Kaul Commons/Student Union Elliot Student Center Sullivan Greywood ETC GriAen/McKinley - restrooms Woodbridge - restrooms Chittick - restrooms Physical plant Vollum Psychology Chemistry… Status: Final | Not published | — |
| applied May 4 | #2026-031815-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE FOSTER SCHOLZ HALL FIRE ALARM UPGRADE; REPLACE FIRE ALARM SYSTEM, 129 SMOKE DETECTORS, 13 STROBES, 20 HORNS/STROBES, 92 SPKRS/STROBES, 23 HEAT DETECTORS, 13 PULL STATIONS, 1 AUXILIARY PANELS Status: Final | Not published | $275K |
| applied Apr 29 | #2026-031241-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE MACNAUGHTON HALL FIRE ALARM UPGRADE; FIRE ALARM REPLACEMENT FOR MACNAUGHTON HALL BUILDING, 90 SMOKE DETECTORS, 7 STROBES, 10 HORNS/STROBES, 69 SPKRS/STROBES, 15 HEAT DETECTORS, 6 PULL STATIONS, 1 AUXILIARY PANEL Status: Final | Not published | $214K |
| applied May 4 | #2026-032092-000-00-FA Facility Permit · Alteration fire alarm- REED COLLEGE FOSTER SCHOLZ HALL FIRE ALARM UPGRADE; REPLACE FIRE ALARM SYSTEM, 129 SMOKE DETECTORS, 13 STROBES, 20 HORNS/STROBES, 92 SPKRS/STROBES, 23 HEAT DETECTORS, 13 PULL STATIONS, 1 AUXILIARY PANELS Status: Issued | Not published | — |
| applied May 4 | #2026-032097-000-00-FA Facility Permit · Alteration fire alarm- REED COLLEGE MACNAUGHTON HALL FIRE ALARM UPGRADE; FIRE ALARM REPLACEMENT FOR MACNAUGHTON HALL BUILDING, 90 SMOKE DETECTORS, 7 STROBES, 10 HORNS/STROBES, 69 SPKRS/STROBES, 15 HEAT DETECTORS, 6 PULL STATIONS, 1 AUXILIARY PANEL Status: Issued | Not published | — |
| applied May 1 | #2026-031810-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE FOSTER SCHOLZ HALL FIRE ALARM UPGRADE; REPLACE FIRE ALARM SYSTEM, 129 SMOKE DETECTORS, 13 STROBES, 20 HORNS/STROBES, 92 SPKRS/STROBES, 23 HEAT DETECTORS, 13 PULL STATIONS, 1 AUXILIARY PANELS Status: Issued | Not published | — |
| applied Apr 29 | #2026-031231-000-00-FA Facility Permit · Alteration power - REED COLLEGE PSYCHOLOGY BUILDING HVAC; LIKE FOR LIKE REPLACEMENT OF AHU, PIPING AND ELEC Status: Final | Not published | — |
| applied Apr 29 | #2026-031238-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE MACNAUGHTON HALL FIRE ALARM UPGRADE; FIRE ALARM REPLACEMENT FOR MACNAUGHTON HALL BUILDING, 90 SMOKE DETECTORS, 7 STROBES, 10 HORNS/STROBES, 69 SPKRS/STROBES, 15 HEAT DETECTORS, 6 PULL STATIONS, 1 AUXILIARY PANEL Status: Issued | Not published | — |
| applied Apr 23 | #2026-29470-000-00-FA Facility Permit · Master Status: Issued | Not published | — |
| applied Apr 23 | #2026-29462-000-00-FA Facility Permit · Master Status: Issued | Not published | — |
| applied Oct 22 | #2025-086297-000-00-FA Facility Permit · Alteration power- REED COLLEGE GRAY CAMPUS CENTER CONFERENCE ROOM HVAC REPLACEMENT 1ST FLR & ROOF; INSTALL ROOF - HEAT PUMP, AIR CONDITIONING UNIT, INTERIOR - FAN COIL UNITS, DUCTWORK, DIFFUSERS, GAS PIPING, PIPING AND ELEC Status: Final | Not published | — |
| applied Jan 27 | #2025-006099-DFS-06-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; DFS FOR ASI 2 SCOPE OF WORK OUTDOOR UNITS SEISMIC BRACING Status: Issued | Not published | $1K |
| applied Feb 12 | #2026-010831-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE KAUL AUDITORIUM HVAC REPLACEMENT; INSTALL RTU AND ELEC Status: Issued | Not published | — |
| applied Aug 21 | #2025-006099-DFS-03-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; DFS FOR OUTDOOR HVAC UNIT SEISMIC BRACING Status: Issued | Not published | $3K |
| applied Dec 1 | #2025-096572-000-00-FA Facility Permit · Alteration controls-(replaces 25-041169ET) REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; ROOF/EXTERIOR - INSTALL ROOF MEMBRANE, GUARDRAILS, PARAPET BRACING, EXTEND SCUPPER, 2ND FLR EAST ELEV - REPLACE WINDOWS, WEST ELEV - INSTALL LOUVER, SOUTH ELEV - INFILL WALL, INSTALL LOUVER,… Status: Final | Not published | — |
| applied Nov 13 | #2025-006099-DFS-05-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; DFS FOR FUEL OIL POLISHER SEISMIC BRACING Status: Issued | Not published | $2K |
| applied Oct 22 | #2025-086284-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE GRAY CAMPUS CENTER HVAC REPLACEMENT 1ST FLR & ROOF; INSTALL ROOF - HEAT PUMP, AIR CONDITIONING UNIT, INTERIOR - FAN COIL UNITS, DUCTWORK, DIFFUSERS, GAS PIPING, PIPING AND ELEC Status: Under Inspection | Not published | $117K |
| applied Oct 15 | #2025-006099-REV-03-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; VALUE ADDED REVISION TO INSTALL ROOFTOP VRF UNITS, WALKWAY PAD, 3RD FLOOR - EXTERIOR LOUVER, FCU, VRF UNITS, DUCTWORK, DIFFUSER, PIPING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | $247K |
| applied Oct 9 | #2025-006099-REV-02-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; REVISION TO DFS-02 ANCHORING METHOD Status: Issued | Not published | — |
| applied Oct 21 | #2025-085688-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE GRAY CAMPUS CENTER HVAC REPLACEMENT 1ST FLR & ROOF; INSTALL ROOF - HEAT PUMP, AIR CONDITIONING UNIT, INTERIOR - FAN COIL UNITS, DUCTWORK, DIFFUSERS, GAS PIPING, PIPING AND ELEC Status: Issued | Not published | — |
| applied Sep 29 | #2025-006099-DFS-04-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; DFS FOR SEISMIC BRACING OF EQUIPMENT Status: Issued | Not published | $18K |
| applied Aug 15 | #2025-066369-000-00-CO Commercial Building Permit · Alteration SINGLEPDF - BALLASTED SOLAR INSTALLATION OF 96.04KW ROOF MOUNTED PV SYSTEM - ENGINEERED Status: Final | Not published | $24.9K |
| applied Jul 28 | #2025-059165-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX 96.04 KWDC, ROOF MOUNT, GRID TIED, PV, SOLAR SYSTEM Status: Final | Not published | — |
| applied Jul 28 | #2025-006099-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; REVISION TO ADD DUPLEX CONDENSATE PUMP, PIPING Status: Issued | Not published | $8K |
| applied Jul 10 | #2025-006099-DFS-02-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; DFS FOR MECHANICAL AND DUCTING SEISMIC Status: Issued | Not published | $25K |
| applied Jun 17 | #2025-047765-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PSYCHOLOGY BUILDING HVAC; LIKE FOR LIKE REPLACEMENT OF AHU, PIPING AND ELEC Status: Final | Not published | $301K |
| applied Jun 17 | #2025-047763-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PSYCHOLOGY BUILDING HVAC/ LIKE FOR LIKE REPLACEMENT OF AHU, PIPING AND ELEC Status: Issued | Not published | — |
| applied Jun 5 | #2025-044626-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE ELLIOTT HALL EXTERIOR STAIR LANDING TI; MINOR DEMO, REPLACE EXISTING STAIR LANDING ON EAST ELEVATION, HANDRAILS, GUARDRAILS AND FINISHES Status: Final | Not published | $25K |
| applied Jun 5 | #2025-044625-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE ELLIOTT HALL EXTERIOR STAIR LANDING TI; MINOR DEMO, REPLACE EXISTING STAIR LANDING ON EAST ELEVATION, HANDRAILS, GUARDRAILS AND FINISHES Status: Issued | Not published | — |
| applied May 14 | #2025-006099-DFS-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; DFS FOR COREBRACE Status: Issued | Not published | — |
| applied Jan 24 | #2025-006100-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; ROOF/EXT - VRF OUTDOOR UNITS, STEAM SILENCER, INT - STEAM BOILERS, HOT WATER PUMP, DEAERATOR FEEDWATER SYSTEM, CONDENSATE TANK, FUEL OIL PUMP, CONVERTER, BOILER, BLOWDOWN SEPARATOR, DUPLEX CONDENSATE PUMPS,… Status: Final | Not published | $3.8M |
| applied Jan 24 | #2025-006099-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; MANDATORY ASCE 41-17 BPOE UPGRADE OF BOILER BUILDING DUE TO EXCEEDANCE OF TITLE 24.85.065 COST TRIGGER; ROOF/EXTERIOR - INSTALL ROOF MEMBRANE, GUARDRAILS, PARAPET BRACING, EXTEND SCUPPER, 2ND FLR EAST ELEV -… Status: Under Inspection | Not published | $2.7M |
| applied Apr 23 | #2025-031913-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE BRAGDON HALL FIRE ALARM UPGRADE; PART FOR PART REPLACEMENT OF AN EXISTING OUTDATED SYSTEM, 53 SMOKE DETECTORS, 15 HEAT DETECTORS, 22 STROBES, 10 PULL STATIONS, 18 HORN STROBES, 6 AUXILIARY PANELS Status: Final | Not published | $200K |
| applied Apr 30 | #2025-033997-000-00-ET Electrical Permit · Addition/Alteration/Replacement Furnish & Install HVAC Controls Status: Final | Not published | — |
| applied Apr 23 | #2025-031911-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE BRAGDON HALL FIRE ALARM UPGRADE; PART FOR PART REPLACEMENT OF AN EXISTING OUTDATED SYSTEM, 53 SMOKE DETECTORS, 15 HEAT DETECTORS, 22 STROBES, 10 PULL STATIONS, 18 HORN STROBES, 6 AUXILIARY PANELS Status: Issued | Not published | — |
| applied Apr 23 | #2025-031938-000-00-FA Facility Permit · Alteration fire alarm- REED COLLEGE BRAGDON HALL FIRE ALARM UPGRADE; PART FOR PART REPLACEMENT OF AN EXISTING OUTDATED SYSTEM, 53 SMOKE DETECTORS, 15 HEAT DETECTORS, 22 STROBES, 10 PULL STATIONS, 18 HORN STROBES, 6 AUXILIARY PANELS Status: Issued | Not published | — |
| applied Feb 6 | #2025-009816-000-00-FA Facility Permit · Alteration power - REED COLLEGE NUCLEAR REACTOR HVAC UPGRADE; ROOFTOP - INSTALL RTUS, INTERIOR - INSTALL EXHAUST FAN, TERMINAL UNITS, DIFFUSERS, GRILLES AND ELEC Status: Final | Not published | — |
| applied Jan 29 | #2025-007353-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE NUCLEAR REACTOR HVAC UPGRADE; ROOFTOP - INSTALL RTUS, INTERIOR - INSTALL EXHAUST FAN, TERMINAL UNITS, DIFFUSERS, GRILLES AND ELEC Status: Final | Not published | $492K |
| applied Mar 16 | #2001-130926-000-00-ET Electrical Permit · Alteration TEMP 200AMP AND 400 AMP - REFEED TEMP SERVICE TO LIBRARY & GRAYWOOD BLDG Status: Final | Not published | — |
| applied May 25 | #2000-150766-000-00-ET Electrical Permit · Alteration 3-200AMP TEMP SERVICES AND 4 CIRCUITS Status: Final | Not published | — |
| applied Jan 29 | #2025-007350-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE NUCLEAR REACTOR HVAC UPGRADE; ROOFTOP - INSTALL RTUS, INTERIOR - INSTALL EXHAUST FAN, TERMINAL UNITS, DIFFUSERS, GRILLES AND ELEC Status: Issued | Not published | — |
| applied Jan 27 | #2025-006336-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; ROOF/EXTERIOR - INSTALL ROOF MEMBRANE, GUARDRAILS, PARAPET BRACING, EXTEND SCUPPER, 2ND FLR EAST ELEV - REPLACE WINDOWS, WEST ELEV - INSTALL LOUVER, SOUTH ELEV - INFILL WALL, INSTALL LOUVER, INTERIOR - DEMO… Status: Final | Not published | — |
| applied Jan 24 | #2025-006091-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; ROOF/EXTERIOR - INSTALL ROOF MEMBRANE, GUARDRAILS, PARAPET BRACING, EXTEND SCUPPER, 2ND FLR EAST ELEV - REPLACE WINDOWS, WEST ELEV - INSTALL LOUVER, SOUTH ELEV - INFILL WALL, INSTALL LOUVER, INTERIOR - DEMO… Status: Issued | Not published | — |
| applied Jan 24 | #2025-006142-000-00-FA Facility Permit · Alteration power, data-REED COLLEGE PHYSICAL PLANT UPGRADE 1ST, 2ND FLRS, MEZZANINE & ROOF; ROOF/EXTERIOR - INSTALL ROOF MEMBRANE, GUARDRAILS, PARAPET BRACING, EXTEND SCUPPER, 2ND FLR EAST ELEV - REPLACE WINDOWS, WEST ELEV - INSTALL LOUVER, SOUTH ELEV - INFILL WALL, INSTALL LOUVER, INTERIOR - DEMO WALLS, NEW… Status: Final | Not published | — |
| applied Nov 14 | #2024-097251-000-00-FA Facility Permit · Alteration power- REED COLLEGE PSYCHOLOGY LAB HVAC TI; INSTALL ROOF TOP CONDENSING UNIT, COIL, PIPING AND ELEC Status: Issued | Not published | — |
| applied Nov 12 | #2024-096588-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PSYCHOLOGY LAB HVAC TI; INSTALL ROOF TOP CONDENSING UNIT, COIL, PIPING AND ELEC Status: Under Inspection | Not published | $70K |
| applied Nov 12 | #2024-096586-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ REED COLLEGE PSYCHOLOGY LAB HVAC TI; INSTALL ROOF TOP CONDENSING UNIT, COIL, PIPING AND ELEC Status: Issued | Not published | — |