Get ProEvery project in every city · from $79/mo
Get Procommercial project · Portland, OR
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing, Sign work permitted December 10, 2024, with 94 permits through October 26, 2026, declaring $11,985,092 of work.
SINGLE PDF PROCESS/ OHSU HOSPITAL A WING ROOF HVAC UPGRADE; PARTIAL REROOF OF ROOF, INSTALL NEW RAISED PLATFORM, DOOR, SHIP LADDERS, STAIR W/ GUARDRAILS, METAL DECK LANDING, WALKWAY PADS, NEW EXTERIOR DOOR, FINISHES, PLUMB AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
94 permits issued Dec 10 – Oct 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 26 | #2026-079173-000-00-FA |
Facility Permit · Alteration
power-OHSU OHS Telecom rm grounding 1-15 flrs
Status: Issued
| Not published |
| — |
| applied Oct 26 | #2026-079172-000-00-FA Facility Permit · Alteration OHSU OHS Telecom rm grounding Status: Issued | Not published | — |
| applied Oct 13 | #2026-075917-000-00-FA Facility Permit · Alteration OHSU OHS 2flr Cubicles power Status: Issued | Not published | — |
| applied Oct 13 | #2026-075920-000-00-FA Facility Permit · Alteration power-OHSU OHS 2flr Cubicles power Status: Issued | Not published | — |
| applied Jul 17 | #2026-052881-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL A WING HVAC UPGRADE 15TH FLR; INSTALL SUPPLY FAN ARRAYS, COOLING COILS, FILTER RACKS, NEW DOOR FOR COILS, FINISHES, PIPING AND ELEC Status: Issued | Not published | $1.9M |
| applied Aug 25 | #2025-051676-DFS-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL EMERGENCY DEPARTMENT REMODEL 8TH FLR; DFS FOR MICROPILES Status: Issued | Not published | $143K |
| applied Sep 15 | #2026-068386-000-00-FA Facility Permit · Alteration power-OHSU OHS 8flr corridor C8001 install exit light Status: Final | Not published | — |
| applied Sep 15 | #2026-068383-000-00-FA Facility Permit · Alteration OHSU OHS 8flr corridor C8001 install exit light Status: Issued | Not published | — |
| applied Sep 14 | #2026-067987-000-00-FA Facility Permit · Alteration OHSU OHS 5C93-provide 1 new 20A 120v circuit for quad @ work bench. Status: Issued | Not published | — |
| applied Sep 14 | #2026-067989-000-00-FA Facility Permit · Alteration power-OHSU OHS 5C93 provide 1 new 20A 120v circuit for quad work bench. Status: Final | Not published | — |
| applied Jul 17 | #2026-052878-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL A WING HVAC UPGRADE 15TH FLR; INSTALL SUPPLY FAN ARRAYS, COOLING COILS, FILTER RACKS, NEW DOOR FOR COILS, FINISHES, PIPING AND ELEC Status: Issued | Not published | — |
| applied Jun 8 | #2026-041764-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU OHS FIRE ALARM UPGRADE 7TH FLR; ADD 1 FIRE ALARM STROBE, 1 SMOKE DETECTOR TO ROOM 7B20 Status: Issued | Not published | $8K |
| applied Jun 8 | #2026-041762-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU OHS FIRE ALARM UPGRADE 7TH FLR; ADD 1 FIRE ALARM STROBE, 1 SMOKE DETECTOR TO ROOM 7B20 Status: Issued | Not published | — |
| applied Apr 23 | #2026-029415-000-00-FA Facility Permit · Alteration power-OHSU OHS OR 11 BOOM REPLACEMENT 6TH FLR TI; MINOR DEMO, REMODEL OR 11, INSTALL BOOM EQUIPMENT, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | — |
| applied Jan 20 | #2026-004603-000-00-FA Facility Permit · Alteration power, data-OHSU HOSPITAL NEUROSCIENCES INPATIENT 7TH FLR TI; MINOR DEMO, REMODEL PATIENT RMS, CLEAN WORKRM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Feb 11 | #2026-010465-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL NEUROSCIENCES INPATIENT 7TH FLR TI; MINOR DEMO, REMODEL PATIENT RMS, CLEAN WORKRM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-MIXING VALVE, MED GAS O2 PIPING, 8-MED GAS OUTLETS Status: Final | Not published | — |
| applied Apr 23 | #2026-029377-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU OHS OR 11 BOOM REPLACEMENT 6TH FLR TI; MINOR DEMO, REMODEL OR 11, INSTALL BOOM EQUIPMENT, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | $122K |
| applied May 12 | #2026-034805-000-00-FA Facility Permit · Alteration power-feeder & panel- OHSU HOSPITAL A WING ROOF HVAC UPGRADE; PARTIAL REROOF OF ROOF, INSTALL NEW RAISED PLATFORM, DOOR, SHIP LADDERS, STAIR W/ GUARDRAILS, METAL DECK LANDING, WALKWAY PADS, NEW EXTERIOR DOOR, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Apr 10 | #2025-028136-000-00-FA Facility Permit · Alteration power-branch circuits only OHSU HOSPITAL A WING ROOF HVAC UPGRADE; PARTIAL REROOF OF ROOF, INSTALL NEW RAISED PLATFORM, DOOR, SHIP LADDERS, STAIR W/ GUARDRAILS, METAL DECK LANDING, WALKWAY PADS, NEW EXTERIOR DOOR, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Mar 20 | #2026-020497-000-00-FA Facility Permit · Alteration power-OHSU MAIN HOSPITAL OR 5 6TH FLR TI; MINOR DEMO, REMODEL OR 5, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Apr 23 | #2026-029376-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU OHS OR 11 BOOM REPLACEMENT 6TH FLR TI; MINOR DEMO, REMODEL OR 11, INSTALL BOOM EQUIPMENT, CEILING, FLOORING, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Apr 20 | #2026-028218-000-00-FA Facility Permit · Alteration OHS 6C OR#5 Lighting-Replace existing OR #5 overhead fluorescent lighting with LED fixtures. Status: Issued | Not published | — |
| applied Apr 20 | #2026-028221-000-00-FA Facility Permit · Alteration power-OHS 6C OR#5 Lighting-Replace existing OR #5 overhead fluorescent lighting with LED fixtures. Status: Final | Not published | — |
| applied Mar 25 | #2026-021714-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU MAIN HOSPITAL OR 5 6TH FLR TI; MINOR DEMO, REMODEL OR 5, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, MEDICAL GAS FOR REPLACEMENT 2-BOOMS Status: Final | Not published | — |
| applied Mar 18 | #2026-019871-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU MAIN HOSPITAL OR 5 6TH FLR TI; MINOR DEMO, REMODEL OR 5, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $175K |
| applied Jan 20 | #2026-004498-000-00-FA Facility Permit · Alteration power-OHSU MAIN HOSPITAL OR 6 REMODEL 6TH FLR TI; MINOR DEMO, REMODEL OR 6, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Sep 19 | #2025-072293-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX REMOVE AND REPLACE PGE 12.5 SWITCHES, UNDERGROUND, GROUNDING, INSTALL TRANSFORMERS, PANEL BOARDS, LIGHTING INVERTER, LIGHTS, LV/DATA Status: Under Inspection | Not published | — |
| applied Mar 18 | #2026-019869-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU MAIN HOSPITAL OR 5 6TH FLR TI; MINOR DEMO, REMODEL OR 5, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jan 29 | #2026-007047-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU MAIN HOSPITAL OR 6 REMODEL 6TH FLR TI; MINOR DEMO, REMODEL OR 6, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, MED GAS FOR TWO NEW BOOMS Status: Final | Not published | — |
| applied Feb 25 | #2025-102280-REV-01-SG Sign Permit · New Sign/Awning SINGLE PDF - REV TO FOOTING Status: Issued | Not published | — |
| applied May 29 | #2025-042493-000-00-FA Facility Permit · Alteration power-OHSU 8A CORRIDOR 8TH FLR; DEMO WALLS, NEW WALLS TO CREATE CORRIDOR, SHELL SPACES, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | — |
| applied Feb 18 | #2026-012346-000-00-FA Facility Permit · Alteration power-OHS 8A23 Outlets for wireless doorbells Status: Final | Not published | — |
| applied Feb 18 | #2026-012344-000-00-FA Facility Permit · Alteration OHS 8A23 Outlets for wireless doorbells Status: Issued | Not published | — |
| applied Feb 18 | #2026-012126-000-00-FA Facility Permit · Alteration nurse call- OHSU OHS 6A nurse call- cabling & devices 6flr A wing Status: Issued | Not published | — |
| applied Feb 18 | #2026-012125-000-00-FA Facility Permit · Alteration OHSU OHS 6A nurse call Status: Issued | Not published | — |
| applied Jan 20 | #2026-004566-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL NEUROSCIENCES INPATIENT 7TH FLR TI; MINOR DEMO, REMODEL PATIENT RMS, CLEAN WORKRM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $166K |
| applied Jul 28 | #2025-060610-000-00-FA Facility Permit · Alteration FULL PDOX PROCESS/ OHSU HOSPITAL EMERGENCY DEPARTMENT REMODEL 8TH FLR; EXTERIOR - NEW WALLS TO CREATE UNCONDITIONED ENTRY VESTIBULE, ENTRY CANOPY, SIDEWALKS, RAMPS W/ HANDRAILS, BOLLARDS, SEAT WALLS, RETAINING WALLS, PARKING LOT UPDATES, INTERIOR - DEMO WALLS, NEW WALLS TO CREATE OHSU POLICE RM,… Status: Under Inspection | Not published | — |
| applied Jan 20 | #2026-004567-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL NEUROSCIENCES INPATIENT 7TH FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS, TERMINAL UNITS, HEATING COILS AND ELEC Status: Final | Not published | $77K |
| applied Feb 11 | #2026-010415-000-00-ET Electrical Permit · New Construction Installing 3 Illuminated Freestanding sign for OHSU Campus Status: Final | Not published | — |
| applied Jan 16 | #2026-003960-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU MAIN HOSPITAL OR 6 REMODEL 6TH FLR TI; MINOR DEMO, REMODEL OR 6, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $176K |
| applied Jan 14 | #2026-003267-000-00-FA Facility Permit · Alteration power-OHSU MAIN HOSPITAL OR 14 REMODEL 6TH FLR TI; MINOR DEMO, REMODEL OR 14, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Dec 16 | #2025-100080-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX - ADDED FEEDERS. PANELS AND CIRCUITS FOR KITCHEN Status: Final | Not published | — |
| applied Jan 14 | #2026-003125-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU MAIN HOSPITAL OR 14 REMODEL 6TH FLR TI; MINOR DEMO, REMODEL OR 14, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $137K |
| applied Jan 20 | #2026-004565-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL NEUROSCIENCES INPATIENT 7TH FLR TI; MINOR DEMO, REMODEL PATIENT RMS, CLEAN WORKRM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jan 12 | #2026-002611-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL EMERGENCY DEPARTMENT REMODEL 8TH FLR; REMODEL OF 8TH FLOOR A & B WING INCLUDING NEW DETECTION AND NOTIFICATION, 59 SMOKE DETECTORS, 14 STROBES, 22 SPKRS/STROBES, 4 PULL STATIONS, 2 AUXILIARY PANELS Status: Issued | Not published | $230K |
| applied Jan 16 | #2026-003958-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU MAIN HOSPITAL OR 6 REMODEL 6TH FLR TI; MINOR DEMO, REMODEL OR 6, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jan 14 | #2026-003123-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU MAIN HOSPITAL OR 14 REMODEL 6TH FLR TI; MINOR DEMO, REMODEL OR 14, INSTALL NEW EQUIPMENT, MED GAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Dec 24 | #2025-102280-000-00-SG Sign Permit · New Sign/Awning SINGLE PDF - NEW 25.25 SQFT ILLUMINATED FREESTANDING SIGN ON NE FRONTAGE Status: Final | Not published | — |
| applied Dec 31 | #2025-103533-000-00-FA Facility Permit · Alteration REMOVE AND REPLACE OVERHEAD WASTE PIPE IN SEVERAL OPERATING ROOMS Status: Final | Not published | — |
| applied Dec 31 | #2025-103523-000-00-FA Facility Permit · Alteration REPLACE OVERHEAD WASTE PIPE IN OPERATION ROOMS Status: Issued | Not published | — |
| applied Dec 16 | #2025-100563-000-00-FA Facility Permit · Alteration FULL PDOX PROCESS/ OHSU HOSPITAL EMERGENCY DEPARTMENT REMODEL 8TH FLR; MODIFY EXISTING FIRE SPRINKLER LAYOUT FOR NEW FLOOR AND CEILING LAYOUT IN NORTH END OF LEVEL 8A, RELOCATE FDC LOCATION, 64 HEADS Status: Under Inspection | Not published | $40K |
| applied Dec 16 | #2025-100603-000-00-FA Facility Permit · Alteration power-OHSU OHS 10C17 Quad outlets- Add two quad outlets on one existing circuit Status: Issued | Not published | — |
| applied Dec 16 | #2025-100597-000-00-FA Facility Permit · Alteration OHSU OHS 10C17 Quad outlets Status: Issued | Not published | — |
| applied Aug 8 | #2025-064237-000-00-FA Facility Permit · Alteration power-OHSU PHARMACY CAROUSEL REPLACEMENT STE 4C 4TH FLR; MINOR DEMO, INSTALL ANCHORAGE FOR CAROUSEL STORAGE UNITS, CEILING, FINISHES AND ELEC Status: Final | Not published | — |
| applied Nov 10 | #2025-061774-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU PHARMACY CAROUSEL REPLACEMENT STE 4C 4TH FLR; VALUE ADDED REVISION TO UPPER SUPPORTS FOR CAROUSELS Status: Final | Not published | $6.6K |
| applied Nov 10 | #2025-091745-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU 8A CORRIDOR 8TH FLR; REMODEL OF 8TH FLOOR SOUTH CORRIDOR CONNECTION TO IPA INCLUDING NEW DETECTION AND NOTIFICATION, 5 SMOKE DETECTORS, 4 SPRKS/STROBES, 1 PULL STATION Status: Final | Not published | $10.6K |
| applied Oct 28 | #2025-088073-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU 8A CORRIDOR 8TH FLR; MODIFY EXISTING FIRE SPRINKLER LAYOUT FOR NEW FLOOR AND CEILING PLAN, 9 HEADS Status: Final | Not published | $5K |
| applied Oct 30 | #2025-088796-000-00-FA Facility Permit · Alteration power-OHSU OHS C805 - Add 10 receptacles on two critical branch circuits Status: Final | Not published | — |
| applied Oct 30 | #2025-088794-000-00-FA Facility Permit · Alteration OHSU OHS C805 - Add 10 receptacles on two critical branch circuits Status: Issued | Not published | — |
| applied Jun 9 | #2025-045332-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU 8A CORRIDOR 8TH FLR; DEMO WALLS, NEW WALLS TO CREATE CORRIDOR, SHELL SPACES, CEILING, FLOORING, FINISHES AND ELEC, DEMO 1-SINK, 2-MED GAS OUTLETS, H20, AND DWV, INSTALL 2-SINKS, 2-SUPPLY BOXES Status: Final | Not published | — |
| applied Feb 24 | #2022-116354-000-00-PT Plumbing Permit · New Construction New private sanitary sewer manhole and storm sewer manhole for OHSU IPA project Package 1 Scope Status: Final | Not published | — |
| applied Sep 26 | #2022-186622-000-00-PT Plumbing Permit · New Construction Install 27LF of new 6" sanitary sewer line for OHSU Package G1. Connect to existing 18" combined sewer with inserta tee and run to stub in at Garage F Status: Final | Not published | — |
| applied Sep 22 | #2022-185866-000-00-PT Plumbing Permit · New Construction new sanitary sewer and storm drainage utilities and structures associated with construction of the OHSU Multi Modal Hub Temporary Construction Truck Turnaround project Status: Final | Not published | — |
| applied Jul 24 | #2025-059526-000-00-FA Facility Permit · Alteration power, Fire alarm, data, access controls, stats, sound mask-OHSU HOSPITAL EMERGENCY DEPARTMENT REMODEL 8TH FLR; EXTERIOR - NEW WALLS TO CREATE UNCONDITIONED ENTRY VESTIBULE, ENTRY CANOPY, SIDEWALKS, RAMPS W/ HANDRAILS, BOLLARDS, SEAT WALLS, RETAINING WALLS, PARKING LOT UPDATES, INTERIOR - DEMO… Status: Under Inspection | Not published | — |
| applied Aug 18 | #2025-066537-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL OR 7 REMODEL 6TH FLR; MINOR DEMO, REMODEL OR 7, INSTALL EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Final | Not published | $59.4K |
| applied May 13 | #2025-037586-000-00-FA Facility Permit · Alteration power-OHSU HOSPITAL A WING HVAC UPGRADE 15TH FLR; INSTALL AIR HANDLING UNITS, RETURN FANS AND ELEC Status: Under Inspection | Not published | — |
| applied Aug 2 | #2023-062674-000-00-FS Fire Systems Permit · New SPRINKLER - PROVIDE NEW SPRINKLER SYSTEMS, STANDPIPES, AND FIRE PUMPS TO MEET NFPA 13 VERSION 2016 FOR ALL AREAS IN SCOPE OF WORK FOR NEW HOSPITAL TOWER Status: Final | Not published | — |
| applied Aug 19 | #2025-067272-000-00-FA Facility Permit · Alteration power, controls - OHSU HOSPITAL OR 7 REMODEL 6TH FLR; MINOR DEMO, REMODEL OR 7, INSTALL EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Final | Not published | — |
| applied Aug 18 | #2025-066535-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL OR 7 REMODEL 6TH FLR; MINOR DEMO, REMODEL OR 7, INSTALL EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jul 31 | #2025-061774-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU PHARMACY CAROUSEL REPLACEMENT STE 4C 4TH FLR; MINOR DEMO, INSTALL ANCHORAGE FOR CAROUSEL STORAGE UNITS, CEILING, FINISHES AND ELEC Status: Final | Not published | $170K |
| applied Jul 31 | #2025-061769-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU PHARMACY CAROUSEL REPLACEMENT STE 4C 4TH FLR; MINOR DEMO, INSTALL ANCHORAGE FOR CAROUSEL STORAGE UNITS, CEILING, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Jul 7 | #2025-039684-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU 8A CORRIDOR 8TH FLR; REVISION TO REMOVE DOOR, CORRIDOR EAST WALL CLARIFICATION Status: Final | Not published | — |
| applied May 6 | #2023-044487-REV-01-MT Mechanical Permit · New Construction OHSU IPA / MT related to new line kitchen / REV 01 **w/18-232006-REV-32-MG** Status: Final | Not published | — |
| applied May 20 | #2025-039686-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU 8A CORRIDOR 8TH FLR; INSTALL TERMINAL UNITS, DUCTWORK, DIFFUSERS, GRILLES, MED GAS, PIPING AND ELEC Status: Final | Not published | $138K |
| applied May 20 | #2025-039684-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU 8A CORRIDOR 8TH FLR; DEMO WALLS, NEW WALLS TO CREATE CORRIDOR, SHELL SPACES, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | $693K |
| applied Jun 9 | #2025-045215-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL BIOSAFETY CABINET REPLACEMENTS RM 4C60B 4TH FLR; MINOR DEMO, INSTALL BIOSAFETY CABINETS WITH ANCHORING, FLOORING AND FINISHES Status: Final | Not published | $20K |
| applied Jun 9 | #2025-045203-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL BIOSAFETY CABINET REPLACEMENTS RM 4C60B 4TH FLR; MINOR DEMO, INSTALL BIOSAFETY CABINETS WITH ANCHORING, FLOORING AND FINISHES Status: Issued | Not published | — |
| applied Jun 4 | #2025-044067-000-00-FA Facility Permit · Alteration OHS 4C28 Freezers, 3 new emergency 20A 120v circuits. Status: Issued | Not published | — |
| applied Jun 4 | #2025-044069-000-00-FA Facility Permit · Alteration power-OHS 4C28 Freezers, 3 new emergency 20A 120v circuits Status: Final | Not published | — |
| applied May 13 | #2025-037570-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL A WING HVAC UPGRADE 15TH FLR; INSTALL AIR HANDLING UNITS, RETURN FANS AND ELEC Status: Under Inspection | Not published | $800K |
| applied May 20 | #2025-039681-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU 8A CORRIDOR 8TH FLR; DEMO WALLS, NEW WALLS TO CREATE CORRIDOR, SHELL SPACES, CEILING, FLOORING, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Apr 9 | #2025-027794-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL A WING ROOF HVAC UPGRADE; INSTALL DUCTWORK, AIR HANDLING UNIT, PUMPS, PIPING AND ELEC Status: Issued | Not published | $2.2M |
| applied Apr 9 | #2025-027793-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL A WING ROOF HVAC UPGRADE; PARTIAL REROOF OF ROOF, INSTALL NEW RAISED PLATFORM, DOOR, SHIP LADDERS, STAIR W/ GUARDRAILS, METAL DECK LANDING, WALKWAY PADS, NEW EXTERIOR DOOR, FINISHES, PLUMB AND ELEC Status: Issued | Not published | $4.7M |
| applied May 13 | #2025-037559-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL A WING HVAC UPGRADE 15TH FLR; INSTALL AIR HANDLING UNITS, RETURN FANS AND ELEC Status: Issued | Not published | — |
| applied Apr 9 | #2025-027791-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU HOSPITAL A WING ROOF HVAC UPGRADE; PARTIAL REROOF OF ROOF, INSTALL NEW RAISED PLATFORM, DOOR, SHIP LADDERS, STAIR W/ GUARDRAILS, METAL DECK LANDING, WALKWAY PADS, NEW EXTERIOR DOOR, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Apr 15 | #2020-136724-000-00-MT Mechanical Permit · New Construction MT/FND - MT permit associated with the FND permit for the OHSU Hospital Expansion (OHEP) Project. With 18-232006-FND-01-MG Status: Final | Not published | — |
| applied Jan 31 | #2025-008225-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU SURGICAL BOOM REPLACEMENT OR1 6TH FLR; MINOR DEMO, INSTALL NEW REPLACEMENT LIGHT BOOM, CEILING, FINISHES AND ELEC Status: Final | Not published | $68K |
| applied Mar 6 | #2025-017532-000-00-FA Facility Permit · Alteration power-OHS D-wing elevator machine room; power for new condensate pumps on existing mini-splits Status: Final | Not published | — |
| applied Mar 6 | #2025-017531-000-00-FA Facility Permit · Alteration OHS D-wing elevator machine room; power for new condensate pumps on existing mini-splits Status: Issued | Not published | — |
| applied Mar 5 | #2025-017383-000-00-FA Facility Permit · Alteration power-OHSU SURGICAL BOOM REPLACEMENT OR1 6TH FLR; MINOR DEMO, INSTALL NEW REPLACEMENT LIGHT BOOM, CEILING, FINISHES AND ELEC Status: Final | Not published | — |
| applied Oct 13 | #2003-165463-000-00-ET Electrical Permit · Alteration 200A TEMP SERVICE & 1 BRANCH CIRCUIT FOR MOBIL OFFICE TRAILERS LOCATED AT EMMA JONES HALL PARKING LOT - 10/24/03 ADD 6 CKTS Status: Final | Not published | — |
| applied Jan 31 | #2025-008221-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU SURGICAL BOOM REPLACEMENT OR1 6TH FLR; MINOR DEMO, INSTALL NEW REPLACEMENT LIGHT BOOM, CEILING, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Dec 10 | #2024-103468-000-00-FA Facility Permit · Alteration OHS 3A10B; add one new 20A duplex from existing 20A 120v circuit. Status: Issued | Not published | — |
| applied Dec 10 | #2024-103469-000-00-FA Facility Permit · Alteration power-OHS 3A10B; add one new 20A duplex from existing 20A 120v circuit. Status: Final | Not published | — |