Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Portland, OR
Multifamily General Building, Demolition, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted December 19, 2024, with 53 permits through October 19, 2026, declaring $1,829,325 of work.
PEACEFUL VILLA - SOUTH BLDG #1 - REV-03 - Remove R01/R03 (asphalt shingles) and replace with R05/R06 (standing seam) *** w/23-035595-REV-02-CO & 23-035596-REV-02-CO ***
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
53 permits issued Dec 19 – Oct 19, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 5 | #2023-035590-REV-10-CO |
Commercial Building Permit · New Construction
PEACEFUL VILLA - SOUTH BLDG #1 - REV-10 to DFS-05 - Revision to update the standing-seam roof profile and associated fall-protection calculations and details *** w/23-035595-REV-07-CO and 23-035596-REV-06-CO ***
Status: Issued
| Not published |
| — |
| applied Aug 25 | #2023-035600-REV-03-MT Mechanical Permit · New Construction SINGLE PDF - REVISION TO SHOW REVISED DUCT WORK ROUTING Status: Under Inspection | Not published | — |
| applied Aug 3 | #2023-035590-REV-08-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - REV 08 to DFS-06 - Add intumescent paint scope at Sector C-D bridge Status: Under Inspection | Not published | $9K |
| applied Jul 30 | #2023-035590-REV-07-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - REV 07 - Retag trash chute discharge room wall to the 2-hour rated partition matching as-built assembly 70; upgrade discharge room door from 20-minute to 90-minute Status: Final | Not published | — |
| applied Jul 14 | #2023-035590-DFS-10-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - DFS-10 - Roof ladders Status: Issued | Not published | $11K |
| applied Jan 28 | #2023-035590-DFS-08-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - DFS-08 - Suspended ceiling systems Status: Issued | Not published | $116K |
| applied May 20 | #2023-035590-REV-06-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - REV 06 - Revise fire assembly Status: Under Inspection | Not published | — |
| applied May 19 | #2023-035600-REV-02-MT Mechanical Permit · New Construction MT - PEACEFUL VILLA -SOUTH BLDG #1 - REV 02 - Inspector requested revision to show booster fans *** w/23-035602-REV-01-MT and 23-035604-REV-01-MT *** Status: Final | Not published | — |
| applied Mar 27 | #2023-035590-REV-05-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - REV-05 - Revision to remove curtainwall and window wall from DFS list on architectural and structural sheets *** w/23-035595-REV-04-CO & 23-035596-REV-04-CO *** Status: Final | Not published | — |
| applied Mar 16 | #2023-035590-DFS-11-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - DFS-11 - Metal panels and connections at generator enclosure Status: Issued | Not published | $100K |
| applied Jan 22 | #2026-005586-000-00-FS Fire Systems Permit · New HAZARDOUS / TANK - INSTALLATION OF KOHLER STANDBY GENERATOR MODEL #150REOZJF AND SUBBASE TANK UL 142 DOUBLE WALL 595 GALLON CAPACITY Status: Under Inspection | Not published | — |
| applied Jan 5 | #2023-035590-DFS-07-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - DFS-07 - Glazing systems Status: Under Inspection | Not published | $200K |
| applied Dec 17 | #2023-035590-DFS-05-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - DFS-05 - Fall protection equipment Status: Issued | Not published | $35K |
| applied Nov 6 | #2023-035590-DFS-06-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - DFS-06 - Intumescent fire protection at canopies on Outdoor Lounges 281 and 390 Status: Under Inspection | Not published | $10K |
| applied Oct 21 | #2023-035590-DFS-04-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - DFS-04 - Anchorage for mechanical equipment Status: Issued | Not published | $25K |
| applied Dec 18 | #2023-035590-REV-04-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - REV-04 - Revision to roof/ceiling assemblies R05 and C12 to utilize UL Design No. P522, Option 6A *** w/23-035595-REV-03-CO & 23-035596-REV-03-CO *** Status: Final | Not published | — |
| applied Oct 21 | #2025-085911-000-00-CO Commercial Building Permit · Alteration SINGLEPDF- SOLAR INSTALLATION OF 381.150KW ROOF MOUNTED PV SYSTEM - PRESCRIPTIVE Status: Issued | Not published | $24.9K |
| applied Oct 20 | #2025-082302-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX 381.150 KW ROOF MOUNT, GRID TIED, PERSCRIPTIVE, PV SYSTEM. ASSOCIATED WITH SOLAR PERMIT REQUEST IVR 5197278 Status: Issued | Not published | — |
| applied Nov 10 | #2025-091319-000-00-FS Fire Systems Permit · New ALARM (DAS) - EMERGENCY RESPONDER RADIO COVERAGE SYSTEM FOR ALL BUILDINGS Status: Issued | Not published | — |
| applied Jul 30 | #2023-035590-DFS-02-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - DFS-02 - Joists Status: Final | Not published | $60K |
| applied Oct 10 | #2025-082792-000-00-ET Electrical Permit · New Construction LV stat/control systems -5 buildings Status: Under Inspection | Not published | — |
| applied Apr 15 | #2023-035590-REV-01-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - REV-01 - Change cast-in-place to pile driven piles Status: Final | Not published | — |
| applied Sep 9 | #2023-035590-REV-03-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - REV-03 - Remove R01/R03 (asphalt shingles) and replace with R05/R06 (standing seam) *** w/23-035595-REV-02-CO & 23-035596-REV-02-CO *** Status: Final | Not published | $988K |
| applied Jul 2 | #2023-035590-REV-02-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - REV-02 - Revise deferred submittal lists on Architectural and Structural code sheets *** w/23-035595-REV-01-CO & 23-035596-REV-01-CO *** Status: Final | Not published | — |
| applied Aug 6 | #2023-035590-DFS-03-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - DFS-03 - Shop-Fabricated Wood Trusses Status: Final | Not published | $250K |
| applied May 16 | #2025-034978-000-00-ET Electrical Permit · New Construction PDOX - INSTALL ELECTRICAL IN 113 UNITS 3 STORY BUILDING. LARGEST UNIT IS 1400 SQ FT. OAR 918 REDUCED FEES APPLY ONLY TO RESIDENTIAL UNITS. 4 INSPECTIONS WILL BE ALLOWED PER FLOOR. Status: Under Inspection | Not published | — |
| applied Aug 19 | #2025-066833-000-00-FS Fire Systems Permit · New UNDERGROUND - INSTALL NEW 6" FROM COP CONNECTION AT RIGHT-OF-WAY TO NEW 6" DOUBLE CHECK & VAULT AND CONNECT TO BLDGS VIA 560 LF OF C900 PIPE WITH MEGALUG RETAINING SYSTEM. Status: Final | Not published | — |
| applied Apr 11 | #2023-035590-DFS-01-CO Commercial Building Permit · New Construction PEACEFUL VILLA - SOUTH BLDG #1 - DFS-01 - Tie downs Status: Final | Not published | $60K |
| applied Jun 23 | #2023-035600-REV-01-MT Mechanical Permit · New Construction MT - PEACEFUL VILLA -SOUTH BLDG #1 - REV-01 - Revision to change split systems to R32 Status: Final | Not published | — |
| applied Jun 5 | #2025-041985-000-00-FS Fire Systems Permit · New SPRINKLER & UNDERGROUND - INSTALLING NEW 4" STANDPIPE IN ALL FOUR STAIRS, WITH FLOOR CONTROLS AT EACH FLOOR. DRY SYSTEM TO COVER THE THREE ATTICS, AN UNDERGROUND I.B.R. AND A SMALL FIRE PUMP Status: Under Inspection | Not published | — |
| applied May 28 | #2025-039013-000-00-FS Fire Systems Permit · New ALARM - NEW FIRE ALARM FOR 3 STORY, 25 APARTMENT BUILDING Status: Issued | Not published | — |
| applied May 30 | #2025-042756-000-00-PT Plumbing Permit · New Construction install new sanitary sewer system to new apartment buildings - 560 ln ft of piping, 9 cleanouts, connect to 2 existing sewer combination sewer manholes. Install new 4" domestic water DCDA in underground vault with 436 ln ft of piping. Install new 6" fire water DCDA in underground vault with 576 ln… Status: Under Inspection | Not published | — |
| applied May 2 | #2025-034902-000-00-PT Plumbing Permit · New Construction PEACEFUL VILLA - SOUTH BLG #1 - Plumbing on new 4 story, 117-unit affordable housing building. Status: Under Inspection | Not published | — |
| applied Apr 15 | #2025-029380-000-00-PT Plumbing Permit · New Construction Storm - 4" ln ft 2056 ln ft, 6" ln ft 1475 ln ft, 8" 483 ln ft, 10" 59 ln ft, 12" 635 ln ft, 2 ea 10" clean outs, 6 ea 8" clean outs, 23 ea 6" clean outs, 16 ea 4" clean outs, 15 ea drywells, 8 ea manholes, 61 catch basin / area drains, 69 each rain drains, 3300 ln ft footing drains, 5 each clean… Status: Under Inspection | Not published | — |
| applied Dec 26 | #2024-025063-REV-01-CO Commercial Building Permit · Demolition SB871 - 4626 SE CLINTON - BLDG 8 (UNITS 29-32) - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025037/039/041/059/060/063/065/081/089/100/103-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 26 | #2024-025041-REV-01-CO Commercial Building Permit · Demolition SB871 - 4626 SE CLINTON - BLDG 4 (UNITS 13-16) - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025037/039/041/059/060/063/065/081/089/100/103-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 26 | #2024-025059-REV-01-CO Commercial Building Permit · Demolition SB871 - 4626 SE CLINTON - BLDG 6 (UNITS 21-24) - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025037/039/041/059/060/063/065/081/089/100/103-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 26 | #2024-025060-REV-01-CO Commercial Building Permit · Demolition SB871 - 4626 SE CLINTON - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025037/039/041/059/060/063/065/081/089/100/103-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 26 | #2024-025065-REV-01-CO Commercial Building Permit · Demolition SB871 - 4626 SE CLINTON - BLDG 9 (UNITS 33-36) - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025037/039/041/059/060/063/065/081/089/100/103-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 26 | #2024-025081-REV-01-CO Commercial Building Permit · Demolition 4626 SE CLINTON - BLDG 14 (UNITS 53-58 & 67-70) - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025037/039/041/059/060/063/065/081/089/100/103-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 26 | #2024-025089-REV-01-CO Commercial Building Permit · Demolition SB871 - 4626 SE CLINTON - BLDG 15 (UNITS 59-62) - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement ***** w/24-025037/039/041/059/060/063/065/081/089/100/103-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 26 | #2024-025100-REV-01-CO Commercial Building Permit · Demolition 4626 SE CLINTON - BLDG 17 - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025037/039/041/059/060/063/065/081/089/100/103-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 26 | #2024-025103-REV-01-CO Commercial Building Permit · Demolition 4626 SE CLINTON - BLDG 18 - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement **** w/24-025037/039/041/059/060/063/065/081/089/100/103-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 26 | #2024-025037-REV-01-CO Commercial Building Permit · Demolition SB871 - 4626 SE CLINTON - BLDG 2 (UNITS 5-8) - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025037/039/041/059/060/063/065/081/089/100/103-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 26 | #2024-025039-REV-01-CO Commercial Building Permit · Demolition SB871 - 4626 SE CLINTON - BLDG 3 (UNITS 9-12) - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025037/039/041/059/060/063/065/081/089/100/103-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 23 | #2024-106980-000-00-PT Plumbing Permit · New Construction Install 2" double check for temporary water for demolition / Abatement Status: Final | Not published | — |
| applied Dec 16 | #2024-025071-REV-01-CO Commercial Building Permit · Demolition SB871 - 4626 SE CLINTON - BLDG 10 (UNITS 37-40) - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025035/52/71/72/73/78/91-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 16 | #2024-025072-REV-01-CO Commercial Building Permit · Demolition SB871 - 4626 SE CLINTON - BLDG 11 (UNITS 41-44) - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025035/52/71/72/73/78/91-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 16 | #2024-025073-REV-01-CO Commercial Building Permit · Demolition SB871 - 4626 SE CLINTON - BLDG 12 (UNITS 45-48) - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025035/52/71/72/73/78/91-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 16 | #2024-025078-REV-01-CO Commercial Building Permit · Demolition SB871 - 4626 SE CLINTON - BLDG 13 (UNITS 49-52) - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025035/52/71/72/73/78/91-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 16 | #2024-025091-REV-01-CO Commercial Building Permit · Demolition SB871 - 4626 SE CLINTON - BLDG 16 (UNITS 63-66) - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025035/52/71/72/73/78/91-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 16 | #2024-025052-REV-01-CO Commercial Building Permit · Demolition SB871 - 4626 SE CLINTON - BLDG 5 (UNITS 17-20) - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025035/52/71/72/73/78/91-REV-01-CO *** Status: Final | Not published | — |
| applied Dec 16 | #2024-025035-REV-01-CO Commercial Building Permit · Demolition SB871 - 4626 SE CLINTON - BLDG 1 (UNITS 1-4) - REV-01 - Revision to remove exemption for removal of lead-based paint and to complete partial abatement *** w/24-025035/52/71/72/73/78/91-REV-01-CO *** Status: Final | Not published | — |