Commercial Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted November 12, 2024, with 9 permits through January 30, 2026.
SINGLEPDF - VALUE ADDED REVISION TO UPDATE TO A POWER VENTING SYSTEM
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
9 permits issued Nov 12 – Jan 30, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jan 16 | #2025-101553-REV-01-MT Mechanical Permit · Addition/Alteration/Replace (MT) SINGLEPDF - VALUE ADDED REVISION TO UPDATE TO A POWER VENTING SYSTEM Status: Final | Not published |
| — |
| applied Dec 19 | #2025-101553-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) SINGLEPDF - "NO HEAT" REPLACING BOILER AND ADDING LINER TO CHIMNEY; USING EXISTING WATER AND GAS LINES Status: Final | Not published | — |
| applied May 1 | #2025-034500-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) GAS LINE TO ROOFTOP UNIT/MAKEUP AIR HANDLER. THIS APPLICATION DOES NOT NEED PLAN REVIEW. Status: Final | Not published | — |
| applied Apr 28 | #2021-041295-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX - NEW 400 AMP SERVICE, NO ADDED LOAD. Status: Final | Not published | — |
| applied Mar 11 | #2021-024446-000-00-ET Electrical Permit · Addition/Alteration/Replacement single circuit Status: Final | Not published | — |
| applied Oct 29 | #2021-101411-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Complete plumbing system for (4) WMB Status: Final | Not published | — |
| applied Nov 27 | #2024-100801-000-00-ET Electrical Permit · Addition/Alteration/Replacement Install new fire alarm panel Status: Final | Not published | — |
| applied Nov 18 | #2024-098038-000-00-ET Electrical Permit · Addition/Alteration/Replacement Hook up new hood installation to existing fire alarm panel. Status: Final | Not published | — |
| applied Oct 29 | #2024-091889-000-00-FS Fire Systems Permit · New FIXED SYSTEM - CONNECTION OF A FACTORY INSTALLED CAPTIVE AIRE TANK FIRE SUPPRESSION SYSTEM WITH OVERLAPPING APPLIANCE PROTECTION. Status: Final | Not published | — |