Commercial General Building work permitted November 19, 2024, with 7 permits through March 25, 2026, declaring $557,041 of work.
SINGLE PDF PROCESS/ OHSU KCRB DIESEL PARTICULATE FILTER; INSTALL NEW DIESEL PARTICULATE FILTER, PIPING AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
7 permits issued Nov 19 – Mar 25, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Mar 25 | #2026-021679-000-00-FA Facility Permit · Alteration REPLACE PUMP Status: Issued | Not published | — |
| applied Mar 25 | #2026-021681-000-00-FA Facility Permit · Alteration |
REP.LACE 1 OLD PUMP WITH NEW
Status: Final
| Not published |
| — |
| applied Oct 16 | #2024-088993-000-00-FA Facility Permit · Alteration power-OHSU KCRB DIESEL PARTICULATE FILTER; INSTALL NEW DIESEL PARTICULATE FILTER, PIPING AND ELEC Status: Final | Not published | — |
| applied Feb 6 | #2025-009859-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KCRB DIESEL PARTICULATE FILTER; DEMO EXISTING DROP & ARMOVER TO ALLOW GC TO INSTALL NEW GENERATOR, INSTALL NEW GALVANIZED PIPE & UPRIGHT HEAD(S) TO NEW FLOOR LAYOUT TO MAINTAIN COVERAGE IN AREA OF WORK ONCE NEW GENERATOR IS INSTALLED, 2 HEADS Status: Final | Not published | $6.8K |
| applied Dec 9 | #2024-103085-000-00-FA Facility Permit · Alteration KCRB corridor 5059; Convert 208V recept into two dedicated 120V recepts Status: Issued | Not published | — |
| applied Dec 9 | #2024-103086-000-00-FA Facility Permit · Alteration power-KCRB corridor 5059; Convert 208V recept into two dedicated 120V recepts Status: Final | Not published | — |
| applied Oct 16 | #2024-088882-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OHSU KCRB DIESEL PARTICULATE FILTER; INSTALL NEW DIESEL PARTICULATE FILTER, PIPING AND ELEC Status: Final | Not published | $550K |