Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted November 14, 2024, with 16 permits through July 23, 2026, declaring $30,000 of work.
SINGLE PDF - TENANT IMPROVEMENT TO INSTALL ANCHORAGE FOR TANK. NO CHANGE IN OCCUPANCY.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
16 permits issued Nov 14 – Jul 23, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 1 | #2026-043443-000-00-CO Commercial Building Permit · Alteration PDOX PS: NEW ANCHORAGE FOR GROUND SUPPORT CONVEYOR SECTION. Status: Issued | Not published |
| $5K |
| applied Jun 10 | #2026-042332-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX 80427-24: ELECTRICAL FEEDER TO NEW AIR COMPRESSOR WITH 100HP MOTOR Status: Final | Not published | — |
| applied Jun 12 | #2026-043262-000-00-ET Electrical Permit · Addition/Alteration/Replacement 90068-25: Rework five (5) 480-volt, 20-amp, 3-phase motor circuits. Demo four (4) 120-volt, single phase control circuits. Modify two (2) 120-volt, single phase control circuits. Install new 24VDC power supply and wiring to I/O Modules. Status: Final | Not published | — |
| applied Feb 12 | #2025-090106-REV-01-CO Commercial Building Permit · Alteration SINGLE PDF - NON-VALUE-ADDED REVISION TO REMOVE THE SPECIAL INSPECTIONS FOR STEEL CONSTRUCTION AND ADHESIVE ANCHORS. REVISION ALSO REMOVES ONE OF THE TANK ANCHORAGE OPTIONS FROM THE APPROVED PLAN SET. Status: Final | Not published | — |
| applied Nov 7 | #2025-090106-000-00-CO Commercial Building Permit · Alteration SINGLE PDF - TENANT IMPROVEMENT TO INSTALL ANCHORAGE FOR TANK. NO CHANGE IN OCCUPANCY. Status: Final | Not published | $25K |
| applied Sep 10 | #2025-073409-000-00-ET Electrical Permit · Addition/Alteration/Replacement 70194-24: Installation of five (5) feeders for new control panels. Installation of up to ten (10) branch circuits for control devices, lighting, and receptacles. Installation of seven (7) CAT 6 cables for data connection to plant network. Status: Final | Not published | — |
| applied Aug 27 | #2025-066225-000-00-FS Fire Systems Permit · New ALARM - PROVIDE & INSTALL A NEW AUTOMATIC AND MANUAL FIRE ALARM SYSTEM WITH VOICE EVACUATION. NEW SYSTEM WITH INCLUDE SPRINKLER MONITORING, FULL ADA VOICE NOTIFICATION, REPLACEMENT DUCT DETECTORS, AND MONITORING OF EXISTING HALON AND ELEVATOR CONTROL PANELS. Status: Final | Not published | — |
| applied Mar 15 | #2025-020297-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) SINGLEPDF - REPLACE 4 UNTIS ON (2) DIFFERENT ROOF AREAS: (2) RTUS (UNITS 011 AND 003): (1) CU (UNIT 104) AND (1) SPLIT HP (UNIT 101) ALL LIKE FOR LIKE UNITS Status: Final | Not published | — |
| applied May 15 | #2025-038580-000-00-ET Electrical Permit · Addition/Alteration/Replacement 84452-25: Disconnect feeder to four HVAC units on roof. Replace disconnect switches and reconnect existing feeder to new unit. Status: Final | Not published | — |
| applied May 8 | #2025-036504-000-00-ET Electrical Permit · Addition/Alteration/Replacement 82825-25: Add/modify four (4) 120volt circuits to power 24vdc power supplies to power four (4) 24vdc safety control circuits. Status: Final | Not published | — |
| applied Dec 4 | #2024-102190-000-00-ET Electrical Permit · Addition/Alteration/Replacement 80426-24: Installation of pathway lasers, crosswalk gobos, forklift and pedestrian gobos, PPE gobos, Door strobes, and activation switches in beverage warehouse Status: Final | Not published | — |
| applied Dec 4 | #2024-102197-000-00-ET Electrical Permit · Addition/Alteration/Replacement 80447-24: Installation of three 14' ventilation fans in warehouse. 15-20amp, 480v motor branch circuits feeding VFD cabinets. Fans to be cord and plug connected. Circuits will not be put into service until completion of future Fire alarm system upgrade. Status: Final | Not published | — |
| applied Dec 4 | #2024-102203-000-00-ET Electrical Permit · Addition/Alteration/Replacement 80427-24: Installation of breaker and motor branch circuit to 100hp, 480v Compressor unit with line reactor. Installation of breaker and 15 amp branch circuit to compressed air dryer. CAT 6 cable to each unit for network integration. Status: Final | Not published | — |
| applied Dec 4 | #2024-102207-000-00-ET Electrical Permit · Addition/Alteration/Replacement 25956: Line 1 merge conveyor swap Status: Final | Not published | — |
| applied Nov 27 | #2024-100887-000-00-ET Electrical Permit · Addition/Alteration/Replacement 26272: Replace existing 75G tank. Remove agitator motor and control devices from damaged tank. Remove/relocate electrical devices from CMU wall to allow for demolition. Install agitator motor and control devices from damaged tank in new 75G tank. Add door position monitoring switch. Relocate… Status: Final | Not published | — |
| applied Nov 14 | #2024-097394-000-00-ET Electrical Permit · Addition/Alteration/Replacement 80260-24 Install new VFD cabinet for control of three 20hp pump motors Status: Final | Not published | — |