Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Portland, OR
Multifamily General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted November 5, 2024, with 24 permits through October 28, 2026, declaring $1,080,964 of work.
PDOX - REMOVE EXISTING FAILED PODIUM WATERPROOFING AND REPLACE WITH NEW WATERPROOFING MEMBRANE.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
24 permits issued Nov 5 – Oct 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 28 | #2026-079790-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Replace 9 deck drains, install 9 overflow drains |
Status: Issued
| Not published |
| — |
| applied Oct 14 | #2026-076131-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Tub to Shower conversion with new valve & shower pan. Status: Under Inspection | Not published | — |
| applied Jul 16 | #2026-047261-000-00-CO Commercial Building Permit · Alteration PDOX - REMOVE EXISTING FAILED PODIUM WATERPROOFING AND REPLACE WITH NEW WATERPROOFING MEMBRANE. Status: Under Inspection | Not published | $968K |
| applied Aug 4 | #2026-056332-000-00-CO Commercial Building Permit · Alteration SINGLE PDF - INTERIOR REMODEL TO UNIT 502 AT KITCHEN AND BATHROOM AREAS. Status: Under Inspection | Not published | $75K |
| applied Aug 31 | #2026-064700-000-00-ET Electrical Permit · Addition/Alteration/Replacement AV cabling to TV location with new framing. Status: Final | Not published | — |
| applied Aug 18 | #2026-061160-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Unit 504. Bathroom remodel. Tub to shower conversion, Move 2 bathroom sinks. Install new toilets. Status: Under Inspection | Not published | — |
| applied Aug 8 | #2026-058856-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) INSTALLATION OF 20K BTU 2-HEAD DUCTLESS MINI SPLIT FOR UNIT 503B ON EXISTING BALCONY. THIS MEETS THE NEW EXEMPTION, BUT I UNDERSTAND THAT IF IT DOES NOT, I WILL BE REQUIRED TO SUBMIT FOR A FULL COMMERCIAL MECHANICAL REVIEW. 2-TON DUCTLESS HEADS, 2-TON OUTDOOR. NO NEW PENETRATIONS. SINGLE UNIT ONLY. Status: Final | Not published | — |
| applied Jun 30 | #2026-048125-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Replace domestic hot and cold water risers from water entry to 10th floor mechanical room. Status: Final | Not published | — |
| applied Jun 29 | #2026-047689-000-00-ET Electrical Permit · Addition/Alteration/Replacement UNIT 504: BATHROOM REMODEL Status: Final | Not published | — |
| applied Apr 21 | #2026-027371-000-00-CO Commercial Building Permit · Alteration SINGLE PDF - REMODEL EXISTING BATHROOM IN UNIT 504. Status: Under Inspection | Not published | $35K |
| applied May 13 | #2026-035278-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Furnish labor and material for remodel plumbing in the condo Status: Under Inspection | Not published | — |
| applied May 13 | #2026-034936-000-00-ET Electrical Permit · Addition/Alteration/Replacement Panel Change & Condo Remodel Status: Under Inspection | Not published | — |
| applied Jul 22 | #2025-058961-000-00-FS Fire Systems Permit · Removal SPRINKLER - DEMO (13) FIRE HOSE CABINTS. Status: Final | Not published | — |
| applied Jul 14 | #2025-056130-000-00-ET Electrical Permit · Addition/Alteration/Replacement PANEL REPLACEMENT AND KITCHEN UNDERCABINET LIGHTING Status: Final | Not published | — |
| applied Apr 4 | #2025-026323-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) SINGLEPDF - ADDING A 2-ZONE MINI-SPLIT SYSTEM Status: Final | Not published | — |
| applied Mar 24 | #2025-021121-000-00-CO Commercial Building Permit · Alteration SINGLE PDF - FURR OUT WALL IN KITCHEN FOR NEW ELECTRICAL PANEL Status: Final | Not published | $3K |
| applied Apr 14 | #2025-028905-000-00-ET Electrical Permit · Addition/Alteration/Replacement kitchen remodel project Status: Final | Not published | — |
| applied Mar 21 | #2025-021526-000-00-CO Commercial Building Permit · Alteration SINGLE PDF: REMOVAL OF (3) SECTIONS OF NON-STRUCTURAL WALLS TO OPEN UP FOR A KITCHEN REMODEL. Status: Final | Not published | $75K |
| applied Mar 11 | #2025-018838-000-00-ET Electrical Permit · Addition/Alteration/Replacement 81313-25 New panel and new feeders. Circuit to new mini split Status: Final | Not published | — |
| applied Mar 6 | #2025-017539-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Remodel : 2 showers, 2 Toilets, 3 Sinks, 1 Dishwasher, 1Disposal Status: Final | Not published | — |
| applied Apr 5 | #2019-143519-000-00-PT Plumbing Permit · Addition/Alteration/Replacement MASTER BATHROOM REMODEL - 3 FIXTURES IN UNIT#902 Status: Final | Not published | — |
| applied Jan 31 | #2012-109172-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) NEW FIREPLACE IN LOBBY AND GAS LINES INSTALLED PER MANUFACTURE LITERATURE ON SITE Status: Final | Not published | — |
| applied Jun 3 | #2019-172702-000-00-PT Plumbing Permit · Addition/Alteration/Replacement REMODEL KITCHEN AND BATHROOMS. NEW SHOWER DRAINS IN EACH, NEW SHOWER VALVES IN EACH, ADDITION OF WASHER BOX. SINKS AND TOILETS STAY IN SAME LOCATIONS Status: Final | Not published | — |
| applied Jun 27 | #2019-184952-000-00-PT Plumbing Permit · Addition/Alteration/Replacement KITCHEN SINK PLUMBING, ICE MAKER PIPING, AW AND SINK PIPING, 2 SHOWER DRAINS AND 2 SHOWER VALVES, DOUBLE LAV SINK PIPING Status: Final | Not published | — |