Get Procommercial project · Portland, OR
Commercial Electrical, Hvac/Mechanical work permitted June 27, 2025, with 3 permits through June 8, 2026.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Jun 27 – Jun 8, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 8 | #2026-041603-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) 2 LB GAS LINE FROM METER TO GENERATOR Status: Final | Not published | — |
| applied May 25 |
#2026-037922-000-00-ET
Electrical Permit · Addition/Alteration/Replacement
Generator hook-up with Automatic Transfer Switch the (ATS), tie into existing service for one existing panel.
Status: Final
| Not published |
| — |
| applied Jun 27 | #2025-051010-000-00-ET Electrical Permit · Addition/Alteration/Replacement Install new 200amp meter main, single phase service, location approved by PGE. Install 200amp sub-feed to second floor of (433 NE 22nd ave) same building, and replace existing FPE panel. Install (6) new 120v circuits and (8) outlets. Status: Final | Not published | — |