Commercial General Building, Electrical work permitted November 14, 2024, with 43 permits through October 6, 2026, declaring $3,196,158 of work.
SINGLE PDF PROCESS/ USON COMPASS 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE WAITING AREA, RECEPTION, ELEC RM, OFFICES, TELECOM RM, BATHRMS, STAFF LOUNGE, SWING RM, PHYSICIAN RMS, EXAM RMS, PROCEDURE RM, PHARMACY RM, NURSE STATION, CLEAN STORAGE RMS, CHARTING STATION RM, BLOOD DRAW RM, CLINICAL LAB RM, SOILED STORAGE BIOHAZARD RM, NON CHEMO HOOD RM, ANTE RM, ADMIX RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
43 permits issued Nov 14 – Oct 6, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 18 | #2026-069664-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ USON COMPASS HVAC 3RD FLR TI; INSTALL WATER SOURCE HEAT PUMPS, DUCTWORK, PIPING, DIFFUSERS, GRILLES AND ELEC Status: Issued |
| Not published |
| $170K |
| applied Sep 18 | #2026-069660-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ USON COMPASS HVAC 3RD FLR TI; INSTALL WATER SOURCE HEAT PUMPS, DUCTWORK, PIPING, DIFFUSERS, GRILLES AND ELEC Status: Issued | Not published | — |
| applied Feb 11 | #2020-165016-REV-01-CO Commercial Building Permit · Alteration **submittal switched to PM Full ProjectDox see comments** SLABTOWN CENTER - EXTERIOR IMPROVEMENTS - REV-01 - The 2012 Conway Master Plan has expired, as of that expiration non-conforming upgrades are now required to be addressed with all future upgrades that exceed the NCU threshold. Associated… Status: Issued | Not published | — |
| applied Apr 16 | #2026-027494-000-00-FA Facility Permit · Alteration hvac controls-USON COMPASS 3RD FLR TI Status: Final | Not published | — |
| applied Mar 26 | #2025-099524-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ USON COMPASS 3RD FLR TI; REVISION MINOR DEMO, ADD STRUCTURAL SPECIAL INSPECTIONS, WALL FRAMING CHANGES, RELOCATE MECHANICAL DUCTOWRK, GRILLES, DIFFUSERS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $14K |
| applied Feb 27 | #2026-014905-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ USON COMPASS 3RD FLR TI; MODIFY AN EXISTING FIRE ALARM SYSTEM, 1 SMOKE DETECTOR, 7 STROBES, 15 HORN STROBES Status: Final | Not published | $16.5K |
| applied Mar 5 | #2026-016296-000-00-ET Electrical Permit · Addition/Alteration/Replacement INSTALL (1) ILLUMINATED INTERIOR SIGN. Status: Final | Not published | — |
| applied Feb 23 | #2026-013361-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ USON COMPASS 3RD FLR TI; ADD SPRINKLERS FROM EXISTING SYSTEM TO ACCOMMODATE NEW WALLS AND CEILINGS, 62 HEADS Status: Final | Not published | $10.2K |
| applied Mar 3 | #2026-015494-000-00-ET Electrical Permit · Addition/Alteration/Replacement Install Comcast backbone cable for Skin By Lovely from the 3W riser to suite 310. Status: Final | Not published | — |
| applied Mar 2 | #2026-015123-000-00-FA Facility Permit · Alteration data, fire alarm, nurse call - USON COMPASS 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE WAITING AREA, RECEPTION, ELEC RM, OFFICES, TELECOM RM, BATHRMS, STAFF LOUNGE, SWING RM, PHYSICIAN RMS, EXAM RMS, PROCEDURE RM, PHARMACY RM, NURSE STATION, CLEAN STORAGE RMS, CHARTING STATION RM, BLOOD DRAW RM,… Status: Final | Not published | — |
| applied Feb 12 | #2026-009824-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ SKIN BY LOVELY 3RD FLR TI; TENANT IMPROVEMENT TO THE EXISTING FIRE ALARM SYSTEM, 7 SMOKE DETECTORS, 13 STROBES, 7 HORNS/STROBES Status: Final | Not published | $14K |
| applied Feb 20 | #2026-012945-000-00-ET Electrical Permit · Addition/Alteration/Replacement 301143550 US Oncology Suite 320 - wire run for Alarm installation Status: Final | Not published | — |
| applied Dec 11 | #2025-099525-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ USON COMPASS 3RD FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS, EXTERIOR LOUVER, WATER SOURCE HEAT PUMPS, EXHAUST FANS, ENERGY RECOVERY UNIT, FAN POWERED FILTER UNITS, PIPING AND ELEC Status: Final | Not published | $275K |
| applied Dec 11 | #2025-099524-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ USON COMPASS 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE WAITING AREA, RECEPTION, ELEC RM, OFFICES, TELECOM RM, BATHRMS, STAFF LOUNGE, SWING RM, PHYSICIAN RMS, EXAM RMS, PROCEDURE RM, PHARMACY RM, NURSE STATION, CLEAN STORAGE RMS, CHARTING STATION RM, BLOOD DRAW RM, CLINICAL… Status: Final | Not published | $1M |
| applied Jan 6 | #2026-001157-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ USON COMPASS 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE WAITING AREA, RECEPTION, ELEC RM, OFFICES, TELECOM RM, BATHRMS, STAFF LOUNGE, SWING RM, PHYSICIAN RMS, EXAM RMS, PROCEDURE RM, PHARMACY RM, NURSE STATION, CLEAN STORAGE RMS, CHARTING STATION RM, BLOOD DRAW RM, CLINICAL… Status: Final | Not published | — |
| applied Dec 11 | #2025-099542-000-00-FA Facility Permit · Alteration power- USON COMPASS 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE WAITING AREA, RECEPTION, ELEC RM, OFFICES, TELECOM RM, BATHRMS, STAFF LOUNGE, SWING RM, PHYSICIAN RMS, EXAM RMS, PROCEDURE RM, PHARMACY RM, NURSE STATION, CLEAN STORAGE RMS, CHARTING STATION RM, BLOOD DRAW RM, CLINICAL LAB RM, SOILED… Status: Final | Not published | — |
| applied Jan 22 | #2026-005249-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ SKIN BY LOVELY 3RD FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS, SUPPLY FAN, ELECTRIC HEATER AND ELEC Status: Final | Not published | $54K |
| applied Jan 6 | #2026-001264-000-00-ET Electrical Permit · Addition/Alteration/Replacement Installation of low voltage wiring for voice/data, security, and AV in suite 300. Status: Final | Not published | — |
| applied Dec 11 | #2025-099520-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ USON COMPASS 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE WAITING AREA, RECEPTION, ELEC RM, OFFICES, TELECOM RM, BATHRMS, STAFF LOUNGE, SWING RM, PHYSICIAN RMS, EXAM RMS, PROCEDURE RM, PHARMACY RM, NURSE STATION, CLEAN STORAGE RMS, CHARTING STATION RM, BLOOD DRAW RM, CLINICAL… Status: Issued | Not published | — |
| applied Aug 12 | #2025-065114-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ SKIN BY LOVELY 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE RECEPTION AREA, OFFICES, STORAGE RMS, LOUNGE AREA, CHECK OUT AREA, TREATMENT RMS, SERVER/PHOTO RM, PROVIDER BAY, MED SUPPLY/PREP RM, KITCHEN, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $475K |
| applied Nov 6 | #2025-090854-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ SKIN BY LOVELY 3RD FLR TI; ADD/RELOCATE/DEMO SPRINKLER HEADS AS NECESSARY TO ACCOMMODATE NEW TI SPACE, 27 HEADS Status: Final | Not published | $5.5K |
| applied Aug 13 | #2025-065467-000-00-FA Facility Permit · Alteration power, fire alarm- SKIN BY LOVELY 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE RECEPTION AREA, OFFICES, STORAGE RMS, LOUNGE AREA, CHECK OUT AREA, TREATMENT RMS, SERVER/PHOTO RM, PROVIDER BAY, MED SUPPLY/PREP RM, KITCHEN, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Aug 26 | #2025-069038-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ SKIN BY LOVELY 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE RECEPTION AREA, OFFICES, STORAGE RMS, LOUNGE AREA, CHECK OUT AREA, TREATMENT RMS, SERVER/PHOTO RM, PROVIDER BAY, MED SUPPLY/PREP RM, KITCHEN, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 11-SINKS,… Status: Final | Not published | — |
| applied Aug 12 | #2025-065107-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ SKIN BY LOVELY 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE RECEPTION AREA, OFFICES, STORAGE RMS, LOUNGE AREA, CHECK OUT AREA, TREATMENT RMS, SERVER/PHOTO RM, PROVIDER BAY, MED SUPPLY/PREP RM, KITCHEN, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jan 22 | #2024-005511-000-00-FA Facility Permit · Alteration power-CHROMACORE HVAC 1ST FLR TI; INSTALL DUCTWORK, GRILLES AND ELEC Status: Final | Not published | — |
| applied May 2 | #2024-107859-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ NW UROLOGY STE 380 3RD FLR TI; REVISION TO WALLS, DOORS, CEILING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Apr 25 | #2025-032641-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK CORRIDORS 3RD FLR TI; UPDATE FIRE SYSTEM TO ACCOMMODATE A TI, INCLUDES INSTALLATION OF 14 SMOKE DETECTORS AND 9 HORN STROBE NOTIFICATION DEVICES Status: Final | Not published | $14.7K |
| applied May 7 | #2025-036186-000-00-ET Electrical Permit · Addition/Alteration/Replacement D250239 Install Comcast service to suite 300 (NW Urology) IT rack from service tap in MPOE. Status: Final | Not published | — |
| applied Apr 7 | #2025-026802-000-00-FA Facility Permit · Alteration hvac control - NW UROLOGY STE 380 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE RECEIVING RM, STORAGE RM, PROCEDURE RMS, LAB, OFFICES, EXAM RMS, RESTRMS, JANITOR RM, BREAK RM, MED WORK RM, MA AREA, PROCEDURE RMS, INTAKE/STORAGE AREA, RECEPTION, WAITING RM, CEILING, FLOORING, FINISHES, PLUMB, AND ELEC Status: Final | Not published | — |
| applied Apr 7 | #2025-026724-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ NW UROLOGY STE 380 3RD FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS, TERMINAL UNITS, EXHAUST FAN AND ELEC Status: Final | Not published | $60K |
| applied Apr 11 | #2025-028515-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK CORRIDORS 3RD FLR TI; RELOCATE/ADD 35 SPRINKLER HEAD DROPS OFF OF EXISTING WET SYSTEM FOR NEW CORRIDOR AND ELEVATOR LOBBIES, 35 HEADS Status: Final | Not published | $9.8K |
| applied Mar 27 | #2025-023863-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ NW UROLOGY STE 380 3RD FLR TI; DEMO EXISTING FA EQUIPMENT, ASSOCIATED CABLING AS REQUIRED WITHIN THE AREA OF WORK, INSTALL NEW FA EQUIPMENT, NOTIFICATION DEVICES, ADDRESSABLE DUCT DETECTOR AND SAMPLING TUBE, 1 ADDRESSABLE RELAY MODULE, 22 STROBES, 8 HORN STROBES Status: Final | Not published | $15K |
| applied Mar 27 | #2025-023885-000-00-FA Facility Permit · Alteration fire alarm - NW UROLOGY STE 380 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE RECEIVING RM, STORAGE RM, PROCEDURE RMS, LAB, OFFICES, EXAM RMS, RESTRMS, JANITOR RM, BREAK RM, MED WORK RM, MA AREA, PROCEDURE RMS, INTAKE/STORAGE AREA, RECEPTION, WAITING RM, CEILING, FLOORING, FINISHES, PLUMB, AND ELEC Status: Final | Not published | — |
| applied Mar 18 | #2025-020814-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ NW UROLOGY STE 380 3RD FLR TI; ADD/RELOCATE 67 SPRINKLERS FOR NEW FLOOR PLAN, DEMO EXISTING DROPS AS NECESSARY Status: Final | Not published | $6.5K |
| applied Jan 7 | #2025-001415-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ NW UROLOGY STE 380 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE RECEIVING RM, STORAGE RM, PROCEDURE RMS, LAB, OFFICES, EXAM RMS, RESTRMS, JANITOR RM, BREAK RM, MED WORK RM, MA AREA, PROCEDURE RMS, INTAKE/STORAGE AREA, RECEPTION, WAITING RM, CEILING, FLOORING, FINISHES, PLUMB,… Status: Final | Not published | — |
| applied Dec 27 | #2024-107859-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ NW UROLOGY STE 380 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE RECEIVING RM, STORAGE RM, PROCEDURE RMS, LAB, OFFICES, EXAM RMS, RESTRMS, JANITOR RM, BREAK RM, MED WORK RM, MA AREA, PROCEDURE RMS, INTAKE/STORAGE AREA, RECEPTION, WAITING RM, CEILING, FLOORING, FINISHES, PLUMB,… Status: Final | Not published | $750K |
| applied Dec 31 | #2024-108441-000-00-FA Facility Permit · Alteration power/ data - NW UROLOGY STE 380 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE RECEIVING RM, STORAGE RM, PROCEDURE RMS, LAB, OFFICES, EXAM RMS, RESTRMS, JANITOR RM, BREAK RM, MED WORK RM, MA AREA, PROCEDURE RMS, INTAKE/STORAGE AREA, RECEPTION, WAITING RM, CEILING, FLOORING, FINISHES, PLUMB, AND ELEC Status: Final | Not published | — |
| applied Jan 24 | #2024-097480-REV-02-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK CORRIDORS 3RD FLR TI; REVISION TO ADD DEMISING WALL, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | — |
| applied Nov 15 | #2024-097685-000-00-FA Facility Permit · Alteration power- LANDLORD WORK CORRIDORS 3RD FLR TI; MINOR DEMO, NEW WALLS TO CREATE COMMON CORRIDORS, ELEVATOR LOBBIES, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | — |
| applied Dec 27 | #2024-097480-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK CORRIDORS 3RD FLR TI; REVISION TO ADD EGRESS CORRIDOR, CHANGE EAST LOBBY DOOR, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | — |
| applied Dec 27 | #2024-107858-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ NW UROLOGY STE 380 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE RECEIVING RM, STORAGE RM, PROCEDURE RMS, LAB, OFFICES, EXAM RMS, RESTRMS, JANITOR RM, BREAK RM, MED WORK RM, MA AREA, PROCEDURE RMS, INTAKE/STORAGE AREA, RECEPTION, WAITING RM, CEILING, FLOORING, FINISHES, PLUMB,… Status: Issued | Not published | — |
| applied Nov 14 | #2024-097480-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK CORRIDORS 3RD FLR TI; MINOR DEMO, NEW WALLS TO CREATE COMMON CORRIDORS, ELEVATOR LOBBIES, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | $320K |
| applied Nov 14 | #2024-097477-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK CORRIDORS 3RD FLR TI; MINOR DEMO, NEW WALLS TO CREATE COMMON CORRIDORS, ELEVATOR LOBBIES, CEILING, FLOORING, FINISHES AND ELEC Status: Issued | Not published | — |