Commercial General Building, Electrical, Sign work permitted January 25, 2025, with 58 permits through October 9, 2026, declaring $3,204,505 of work.
SINGLE PDF PROCESS/ INSTRUMENT STE 600 6TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RMS, STORAGE RMS, STAGING AREA, COWORKING AREA, PANTRY, FOCUS RMS, WELLNESS RM, RESTRM, COPY RM, OFFICES, STREAMING RM, COLLAB AREAS, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
58 permits issued Jan 25 – Oct 9, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 9 | #2026-075060-000-00-FA Facility Permit · Alteration LANDLORD WORK FIRE ALARM STE 200 2ND FLR; ADDITION OF ONE CONTROL RELAY FOR FIRE RELEASE ON 2ND FLOOR ACCESS CONTROL SYSTEM Status: Issued |
| Not published |
| — |
| applied Sep 23 | #2026-070819-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK FIRE ALARM STE 200 2ND FLR; ADDITION OF ONE CONTROL RELAY FOR FIRE RELEASE ON 2ND FLOOR ACCESS CONTROL SYSTEM Status: Issued | Not published | $5.8K |
| applied Sep 23 | #2026-070816-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK FIRE ALARM STE 200 2ND FLR; ADDITION OF ONE CONTROL RELAY FOR FIRE RELEASE ON 2ND FLOOR ACCESS CONTROL SYSTEM Status: Issued | Not published | — |
| applied Aug 24 | #2026-062889-000-00-FA Facility Permit · Alteration Suite 200 - New access reader installation for existing tenant. Status: Issued | Not published | — |
| applied Aug 24 | #2026-062895-000-00-FA Facility Permit · Alteration power - Suite 200 - New access reader installation for existing tenant. Status: Issued | Not published | — |
| applied Aug 24 | #2026-062902-000-00-FA Facility Permit · Alteration access - Suite 200 - New access reader installation for existing tenant. Status: Issued | Not published | — |
| applied Feb 12 | #2026-011024-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ FOUR POINT LEGAL STE 200 2ND FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS, VAVS AND ELEC Status: Final | Not published | $22K |
| applied Feb 10 | #2026-010249-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ FOUR POINT LEGAL STE 200 2ND FLR TI; ADD 2 STROBES AND 2 SPEAKER STROBES TO ACCOMMODATE A TENANT EXPANSION Status: Final | Not published | $1.6K |
| applied Feb 10 | #2026-010100-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ FOUR POINT LEGAL STE 200 2ND FLR TI; ADD/RELOCATE SPRINKLERS FOR OFFICE TENANT IMPROVEMENT, 10 HEADS Status: Final | Not published | $4.5K |
| applied Feb 10 | #2026-010084-000-00-FA Facility Permit · Alteration data - FOUR POINT LEGAL STE 200 2ND FLR TI; DEMO WALLS, NEW WALLS TO CREATE OFFICES, FLEX RM, REMODEL ENTRY, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Feb 5 | #2026-009260-000-00-FA Facility Permit · Alteration hvac control - FOUR POINT LEGAL STE 200 2ND FLR TI; DEMO WALLS, NEW WALLS TO CREATE OFFICES, FLEX RM, REMODEL ENTRY, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Nov 24 | #2025-095499-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ FOUR POINT LEGAL STE 200 2ND FLR TI; DEMO WALLS, NEW WALLS TO CREATE OFFICES, FLEX RM, REMODEL ENTRY, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $200K |
| applied Dec 8 | #2025-098354-000-00-FA Facility Permit · Alteration power, fire alarm - FOUR POINT LEGAL STE 200 2ND FLR TI; DEMO WALLS, NEW WALLS TO CREATE OFFICES, FLEX RM, REMODEL ENTRY, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Nov 24 | #2025-095498-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ FOUR POINT LEGAL STE 200 2ND FLR TI; DEMO WALLS, NEW WALLS TO CREATE OFFICES, FLEX RM, REMODEL ENTRY, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Nov 13 | #2025-092974-000-00-ET Electrical Permit · Addition/Alteration/Replacement INSTALL QTY (1) INTERNALLY LED ILLUMINATED CHANNEL LETTER SIGN, CONNECT TO EXISTING CIRCUIT. Status: Final | Not published | — |
| applied Nov 13 | #2025-092508-000-00-FA Facility Permit · Alteration power - 2035 Bldg - Access card reader upgrade for the building (not tenant) Status: Final | Not published | — |
| applied Oct 16 | #2025-084619-000-00-FA Facility Permit · Alteration Lemelson Foundation #501 - Access card reader - install at two of the suite entries. Status: Issued | Not published | — |
| applied Oct 16 | #2025-084623-000-00-FA Facility Permit · Alteration Lemelson Foundation #501 - Access card reader - install at two of the suite entries. Status: Final | Not published | — |
| applied Oct 16 | #2025-084656-000-00-FA Facility Permit · Alteration 2035 Bldg - Access card reader upgrade for the building (not tenant) Status: Issued | Not published | — |
| applied Oct 16 | #2025-084657-000-00-FA Facility Permit · Alteration 2035 Bldg - Access card reader upgrade for the building (not tenant) Status: Final | Not published | — |
| applied Sep 5 | #2025-030927-DFS-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ INSTRUMENT STE 600 6TH FLR TI; DFS FOR SUSPENDED METAL PLANT SHELVES Status: Final | Not published | $92.2K |
| applied Sep 29 | #2025-078282-000-00-SG Sign Permit · New Sign/Awning NEW 55.5 SQFT ILLUMINATED FLUSH MOUNT WALL SIGN FOR INSTRUMENT ON SOUTH ELEVATION OF NORTH BUILDING **ET SEPARATE** Status: Final | Not published | — |
| applied Sep 26 | #2025-078900-000-00-FA Facility Permit · Alteration access - INSTRUMENT STE 600 6TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RMS, STORAGE RMS, STAGING AREA, COWORKING AREA, PANTRY, FOCUS RMS, WELLNESS RM, RESTRM, COPY RM, OFFICES, STREAMING RM, COLLAB AREAS, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Sep 4 | #2025-071901-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK 5TH FLR SUITE ENTRY TI; MINOR DEMO, NEW WALLS TO CREATE TENANT SUITE ENTRIES, CEILING, FLOORING, FINISHES AND ELEC Status: Final | Not published | $30K |
| applied Sep 11 | #2025-073876-000-00-FA Facility Permit · Alteration terminate data, access, camera - INSTRUMENT STE 600 6TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RMS, STORAGE RMS, STAGING AREA, COWORKING AREA, PANTRY, FOCUS RMS, WELLNESS RM, RESTRM, COPY RM, OFFICES, STREAMING RM, COLLAB AREAS, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES, PLUMB AND… Status: Final | Not published | — |
| applied Sep 11 | #2025-073879-000-00-FA Facility Permit · Alteration cabling data, access, cameras - INSTRUMENT STE 600 6TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RMS, STORAGE RMS, STAGING AREA, COWORKING AREA, PANTRY, FOCUS RMS, WELLNESS RM, RESTRM, COPY RM, OFFICES, STREAMING RM, COLLAB AREAS, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES, PLUMB AND… Status: Final | Not published | — |
| applied Sep 5 | #2025-072287-000-00-ET Electrical Permit · Addition/Alteration/Replacement ADDING 1 LOW-VOLTAGE HVAC CONTROLS CIRCUIT FOR 7 VAVs. Status: Final | Not published | — |
| applied Sep 4 | #2025-071899-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK 5TH FLR SUITE ENTRY TI; MINOR DEMO, NEW WALLS TO CREATE TENANT SUITE ENTRIES, CEILING, FLOORING, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Aug 18 | #2025-030927-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ INSTRUMENT STE 600 6TH FLR TI; REVISION TO EXIT SIGN LOCATIONS, FINISHES AND ELEC Status: Final | Not published | $4.7K |
| applied Jul 22 | #2025-059006-000-00-ET Electrical Permit · Addition/Alteration/Replacement INSTALLING CATEGORY AND COMPOSITE CABLE FOR LV AND AV SYSTEMS. (see Facility permit 25-073879) Status: Final | Not published | — |
| applied Jul 8 | #2025-054154-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ INSTRUMENT STE 600 6TH FLR TI; SIXTH FLOOR FIRE ALARM UPGRADES FOR TENANT IMPROVEMENT IN SUITE 60, 9 STROBES, 23 HORNS/STROBES Status: Final | Not published | $21.7K |
| applied Jun 20 | #2025-048898-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LEMELSON FOUNDATION STE 501 5TH FLR TI; MODIFY AN EXISTING CENTRAL STATION FIRE ALARM SYSTEM, 8 STROBES, 8 HORN STROBES Status: Final | Not published | $22.2K |
| applied Jun 18 | #2025-048443-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ INSTRUMENT STE 600 6TH FLR TI; REMOVE, RELOCATE AND ADD NEW PENDENT SPRINKLERS TO CONFORM TO NEW WALL AND CEILING LAYOUT, 44 HEADS Status: Final | Not published | $5.7K |
| applied Jun 10 | #2025-015985-DFS-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LEMELSON FOUNDATION STE 501 5TH FLR TI; DFS FOR METAL STUD WALL FRAMING AND CEILINGS Status: Final | Not published | $7.5K |
| applied Jun 10 | #2025-046013-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITES 2ND & 3RD FLRS TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RM, REMODEL OFFICES, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES AND ELEC - CREATE SPEC SUITES FOR FUTURE TENANT BUILD OUTS Status: Final | Not published | $150K |
| applied Jun 18 | #2025-048620-000-00-FA Facility Permit · Alteration fire alarm, data - LEMELSON FOUNDATION STE 501 5TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE LOBBY AREA, BOARDRM, CONFERENCE RMS, PHONE RM, IT RM, PRIVACY RM, COPY RM, OFFICES, LUNCH RM/KITCHEN, STORAGE RM, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Apr 21 | #2025-030986-000-00-FA Facility Permit · Alteration power, fire alarm - INSTRUMENT STE 600 6TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RMS, STORAGE RMS, STAGING AREA, COWORKING AREA, PANTRY, FOCUS RMS, WELLNESS RM, RESTRM, COPY RM, OFFICES, STREAMING RM, COLLAB AREAS, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Jun 12 | #2025-046676-000-00-FA Facility Permit · Alteration power - LANDLORD WORK SPEC SUITES 2ND & 3RD FLRS TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RM, REMODEL OFFICES, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES AND ELEC - CREATE SPEC SUITES FOR FUTURE TENANT BUILD OUTS Status: Final | Not published | — |
| applied Apr 21 | #2025-030927-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ INSTRUMENT STE 600 6TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RMS, STORAGE RMS, STAGING AREA, COWORKING AREA, PANTRY, FOCUS RMS, WELLNESS RM, RESTRM, COPY RM, OFFICES, STREAMING RM, COLLAB AREAS, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $2M |
| applied Jun 10 | #2025-045702-000-00-FA Facility Permit · Alteration audio video - LEMELSON FOUNDATION STE 501 5TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE LOBBY AREA, BOARDRM, CONFERENCE RMS, PHONE RM, IT RM, PRIVACY RM, COPY RM, OFFICES, LUNCH RM/KITCHEN, STORAGE RM, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Jun 10 | #2025-046010-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK SPEC SUITES 2ND & 3RD FLRS TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RM, REMODEL OFFICES, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES AND ELEC - CREATE SPEC SUITES FOR FUTURE TENANT BUILD OUTS Status: Issued | Not published | — |
| applied Jun 2 | #2025-043283-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ INSTRUMENT STE 600 6TH FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS, VAV, EXHAUST FAN AND ELEC Status: Final | Not published | $116K |
| applied Apr 24 | #2025-032284-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ INSTRUMENT STE 600 6TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RMS, STORAGE RMS, STAGING AREA, COWORKING AREA, PANTRY, FOCUS RMS, WELLNESS RM, RESTRM, COPY RM, OFFICES, STREAMING RM, COLLAB AREAS, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC,… Status: Final | Not published | — |
| applied May 22 | #2025-040619-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LEMELSON FOUNDATION STE 501 5TH FLR TI; INSTALL TERMINAL UNITS, EXHAUST FAN, DUCTWORK, DIFFUSERS, GRILLES AND ELEC Status: Final | Not published | $174K |
| applied Jan 25 | #2025-006222-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PRIME PERFORMANCE FIELD OFFICE STE 206W TI; 1ST TIME TENANT, OCCUPANCY B, MINOR DEMO, NEW WALLS TO CREATE BREAKRM, TREATMENT RMS, ENTRY, STORAGE RM, OFFICE, TREATMENT AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $299K |
| applied May 13 | #2025-037807-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LEMELSON FOUNDATION STE 501 5TH FLR TI; MODIFY EXISTING FIRE SPRINKLER COVERAGE TO ACCOMMODATE MODIFIED WALLS IN EXISTING STEEL & CONCRETE WAREHOUSE USING NO-CALC CALIBRATED VICFLEX VS2 SPRINKLER FITTING SYSTEMS, 71 HEADS Status: Final | Not published | $16.6K |
| applied Feb 28 | #2025-016019-000-00-FA Facility Permit · Alteration power - LEMELSON FOUNDATION STE 501 5TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE LOBBY AREA, BOARDRM, CONFERENCE RMS, PHONE RM, IT RM, PRIVACY RM, COPY RM, OFFICES, LUNCH RM/KITCHEN, STORAGE RM, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Mar 25 | #2025-023109-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LEMELSON FOUNDATION STE 501 5TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE LOBBY AREA, BOARDRM, CONFERENCE RMS, PHONE RM, IT RM, PRIVACY RM, COPY RM, OFFICES, LUNCH RM/KITCHEN, STORAGE RM, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-DISHWASHER, 1-WATER… Status: Final | Not published | — |
| applied Apr 21 | #2025-030925-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ INSTRUMENT STE 600 6TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE CONFERENCE RMS, STORAGE RMS, STAGING AREA, COWORKING AREA, PANTRY, FOCUS RMS, WELLNESS RM, RESTRM, COPY RM, OFFICES, STREAMING RM, COLLAB AREAS, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Feb 28 | #2025-015985-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LEMELSON FOUNDATION STE 501 5TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE LOBBY AREA, BOARDRM, CONFERENCE RMS, PHONE RM, IT RM, PRIVACY RM, COPY RM, OFFICES, LUNCH RM/KITCHEN, STORAGE RM, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $2M |
| applied Mar 25 | #2025-022933-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PRIME PERFORMANCE FIELD OFFICE STE 206W TI; MODIFY AN EXISTING FIRE ALARM SYSTEM, 5 STROBES, 3 SPEAKER STROBES Status: Final | Not published | $5.9K |
| applied Mar 25 | #2025-022990-000-00-FA Facility Permit · Alteration fire alarm - PRIME PERFORMANCE FIELD OFFICE STE 206W TI; 1ST TIME TENANT, OCCUPANCY B, MINOR DEMO, NEW WALLS TO CREATE BREAKRM, TREATMENT RMS, ENTRY, STORAGE RM, OFFICE, TREATMENT AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Mar 11 | #2025-019020-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PRIME PERFORMANCE FIELD OFFICE STE 206W TI; INSTALL TERMINAL UNITS, DUCTWORK, DIFFUSERS, GRILLES AND ELEC Status: Final | Not published | $25K |
| applied Feb 26 | #2025-015200-000-00-FA Facility Permit · Alteration PRIME PERFORMANCE FIELD OFFICE STE 206W TI; SPRINKLER - RELOCATE (12) EXISTING SPRINKLERS AS NECESSARY TO COMPLY WITH NFPA 13 AND THE CITY OF PORTLAND. Status: Final | Not published | — |
| applied Feb 4 | #2025-009009-000-00-FA Facility Permit · Alteration power - PRIME PERFORMANCE FIELD OFFICE STE 206W TI; 1ST TIME TENANT, OCCUPANCY B, MINOR DEMO, NEW WALLS TO CREATE BREAKRM, TREATMENT RMS, ENTRY, STORAGE RM, OFFICE, TREATMENT AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Feb 3 | #2025-008620-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PRIME PERFORMANCE FIELD OFFICE STE 206W TI; 1ST TIME TENANT, OCCUPANCY B, MINOR DEMO, NEW WALLS TO CREATE BREAKRM, TREATMENT RMS, ENTRY, STORAGE RM, OFFICE, TREATMENT AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-DISHWASHER, 2-SINKS, 1-SUPPLY BOX, 1-DRINKING FOUNTAIN,… Status: Final | Not published | — |
| applied Feb 28 | #2025-015983-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LEMELLSON FOUNDATION STE 501 5TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE LOBBY AREA, BOARDRM, CONFERENCE RMS, PHONE RM, IT RM, PRIVACY RM, COPY RM, OFFICES, LUNCH RM/KITCHEN, STORAGE RM, OPEN OFFICE AREAS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jan 25 | #2025-006220-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PRIME PERFORMANCE FIELD OFFICE STE 206W TI; 1ST TIME TENANT, OCCUPANCY B, MINOR DEMO, NEW WALLS TO CREATE BREAKRM, TREATMENT RMS, ENTRY, STORAGE RM, OFFICE, TREATMENT AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |