Commercial General Building, Electrical work permitted November 4, 2024, with 14 permits through October 27, 2026, declaring $406,572 of work.
SINGLE PDF PROCESS/ JACOBS ENGINEERING 2ND, 3RD & 4TH FLRS TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS, EXHAUST FANS, DAMPERS AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
14 permits issued Nov 4 – Oct 27, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied May 14 | #2026-035007-000-00-CO Commercial Building Permit · Alteration PDOX PS - PERSONAL WIRELESS SERVICE FACILITY - WIRELESS ROOFTOP - APPLICATION #3 - ROOFTOP: PROPOSED TO REMOVE EXISTING AHLOA RADIOS; TO RETAIN EXISTING EQUIPMENT AND TO INSTALL NEW AHLOB RADIOS. NO GROUNDWORK PROPOSED. Status: Issued | Not published | $20K |
| applied Jun 4 | #2026-041064-000-00-ET Electrical Permit · Addition/Alteration/Replacement Securitas will provide the below additional items for the Portland office location. a. Addition of access control for the Fitness Room door. i. New wire will be pulled from the new access control panel to the Fitness room door ii. New door contact will be installed on the Fitness room door, one… Status: Issued | Not published | — |
| applied Sep 22 | #2025-076990-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK FIRE ALARM 2ND FLR; INSTALL NEW FIRE ALARM CONTROL RELAY TO GIVE DOOR UNLOCK SIGNAL TO NEW SECURITY SYSTEM UPON FIRE ALARM SIGNAL Status: Issued | Not published | $6.6K |
| applied Sep 23 | #2025-077375-000-00-FA Facility Permit · Alteration fire alarm-LANDLORD WORK FIRE ALARM 2ND FLR; INSTALL NEW FIRE ALARM CONTROL RELAY TO GIVE DOOR UNLOCK SIGNAL TO NEW SECURITY SYSTEM UPON FIRE ALARM SIGNAL. **// replaces 25-077091ET pulled in error for Facilities project Status: Issued | Not published | — |
| applied Sep 22 | #2025-076986-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK FIRE ALARM 2ND FLR; INSTALL NEW FIRE ALARM CONTROL RELAY TO GIVE DOOR UNLOCK SIGNAL TO NEW SECURITY SYSTEM UPON FIRE ALARM SIGNAL. Status: Issued | Not published | — |
| applied May 8 | #2025-036467-000-00-FA Facility Permit · Alteration fire alarm wiring_LANDLORD WORK 2ND, 3RD, 6TH FLRS FIRE ALARM UPGRADE; REPLACE FAILING OBSOLETE VESDA UNITS THAT ARE MONITORING RET AIR DUCTS ON FLRS 2, 3 & 6, INSTALLING SPOT TYPE SMOKE DETECTORS MOUNTED IN FRONT OF THE DUCT WORK, 7 SMOKE DETECTORS Status: Final | Not published | — |
| applied Apr 28 | #2025-033096-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ FISHER & PHILLIPS LLP STE 400 4TH FLR TI; RELOCATING 1 SPEAKER/STROBE AND ADDING 8 NEW SPEAKER/STROBES, ADDING 8 STROBES, ADDING 1 NEW DOOR RELEASE MODULE, NO NEW DETECTION DEVICES, 8 STROBES, 9 SPEAKER/STROBES Status: Final | Not published | $27.1K |
| applied Apr 30 | #2025-034053-000-00-FA Facility Permit · Alteration access controls, cameras, intercom -JACOBS ENGINEERING 2ND, 3RD & 4TH FLRS TI; DEMO WALLS, NEW WALLS TO CREATE 2ND FLR - OFFICES, CONFERENCE RMS, PHONE RMS, BREAKRM, DESIGN AREA, 3RD FLR - OFFICES, CONFERENCE RM, MAIL RM, RESTRMS W/ SHOWERS, PHONE RMS, DESIGN AREA, REMODEL RECEPTION AREA, 4TH FLR… Status: Final | Not published | — |
| applied Apr 9 | #2025-027636-000-00-FA Facility Permit · Alteration LANDLORD WORK 2ND, 3RD, 6TH FLRS FIRE ALARM UPGRADE; REPLACE FAILING OBSOLETE VESDA UNITS THAT ARE MONITORING RET AIR DUCTS ON FLRS 2, 3 & 6, INSTALLING SPOT TYPE SMOKE DETECTORS MOUNTED IN FRONT OF THE DUCT WORK, 7 SMOKE DETECTORS Status: Final | Not published | $10K |
| applied Apr 9 | #2025-027634-000-00-FA Facility Permit · Alteration LANDLORD WORK 2ND, 3RD, 6TH FLRS FIRE ALARM UPGRADE; REPLACE FAILING OBSOLETE VESDA UNITS THAT ARE MONITORING RET AIR DUCTS ON FLRS 2, 3 & 6, INSTALLING SPOT TYPE SMOKE DETECTORS MOUNTED IN FRONT OF THE DUCT WORK, 7 SMOKE DETECTORS Status: Issued | Not published | — |
| applied Nov 20 | #2024-098903-000-00-FA Facility Permit · Alteration hvac control - JACOBS ENGINEERING 2ND, 3RD & 4TH FLRS TI; DEMO WALLS, NEW WALLS TO CREATE 2ND FLR - OFFICES, CONFERENCE RMS, PHONE RMS, BREAKRM, DESIGN AREA, 3RD FLR - OFFICES, CONFERENCE RM, MAIL RM, RESTRMS W/ SHOWERS, PHONE RMS, DESIGN AREA, REMODEL RECEPTION AREA, 4TH FLR - REMODEL OPEN OFFICE… Status: Final | Not published | — |
| applied Nov 12 | #2024-096594-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ JACOBS ENGINEERING 2ND, 3RD & 4TH FLRS TI; REWORKING EXISTING LOCATIONS AND PROVIDEING/REWORKING 43 SPEAKER STROBES Status: Final | Not published | $66.7K |
| applied Nov 12 | #2024-096645-000-00-FA Facility Permit · Alteration JACOBS ENGINEERING 2ND, 3RD & 4TH FLRS TI; ADD & RELOCATE FIRE SPRINKLERS AS NECESSARY FOR NEW ROOMS & UPDATED CEILING LAYOUTS ON LEVERLS 2 & 3 OF EXISTING BUILDING, 57 HEADS Status: Final | Not published | $26.2K |
| applied Oct 21 | #2024-090287-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ JACOBS ENGINEERING 2ND, 3RD & 4TH FLRS TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS, EXHAUST FANS, DAMPERS AND ELEC Status: Final | Not published | $250K |