Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted July 24, 2025, with 13 permits through October 23, 2026, declaring $738,200 of work.
PDOX PS: TI FOR EXISTING TENANT ON PORTION OF BOTH FLOOR OF AN EXISTING TWO -STORY BUILDING. INCLUDES NEW PARTITIONS, DOORS, STOREFRONT SYSTEM, RECONFIGURE RESTROOMS. NEW ACCESSIBLE CONCRETE RAMP AND PARKING ON EXTERIOR. w/26-034008-MT
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
13 permits issued Jul 24 – Oct 23, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 23 | #2026-078779-000-00-ET Electrical Permit · Addition/Alteration/Replacement |
Electrical revamp in maintenance shop.
Status: Issued
| Not published |
| — |
| applied May 18 | #2026-034008-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) *PDOX PS: HVAC RENOVATION ASSOCIATED WITH TI. W26-034007-CO Status: Issued | Not published | — |
| applied May 19 | #2026-034007-000-00-CO Commercial Building Permit · Alteration PDOX PS: TI FOR EXISTING TENANT ON PORTION OF BOTH FLOOR OF AN EXISTING TWO -STORY BUILDING. INCLUDES NEW PARTITIONS, DOORS, STOREFRONT SYSTEM, RECONFIGURE RESTROOMS. NEW ACCESSIBLE CONCRETE RAMP AND PARKING ON EXTERIOR. w/26-034008-MT Status: Issued | Not published | $738K |
| applied Jun 22 | #2026-045705-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Replace 2 backflow devices Status: Final | Not published | — |
| applied May 20 | #2026-037152-000-00-ET Electrical Permit · Addition/Alteration/Replacement Install (2) 480V outlets for forklift chargers. Status: Final | Not published | — |
| applied Apr 13 | #2026-026465-000-00-ET Electrical Permit · Addition/Alteration/Replacement Relocate (4) 480V forklift charging outlets. Status: Final | Not published | — |
| applied Feb 26 | #2026-014477-000-00-ET Electrical Permit · Addition/Alteration/Replacement Terminate LV to install automated swing gate and run wire in existing conduit. Status: Final | Not published | — |
| applied Jan 21 | #2026-005089-000-00-ET Electrical Permit · Addition/Alteration/Replacement Temporary power for spider boxes Status: Final | Not published | — |
| applied Jan 20 | #2025-102080-000-00-FS Fire Systems Permit · Removal HAZARDOUS/TANK - REMOVAL AND DISPOSAL OF REMAINING FUEL IN TANKS 1 & 3; TRIPLE RINSE (UP TO 400 GALLONS DISPOSAL). REMOVAL AND DISPOSAL OF TANKS 1 & 3 AT A LOCAL METAL RECYCLER. Status: Final | Not published | — |
| applied Dec 30 | #2025-103286-000-00-ET Electrical Permit · Addition/Alteration/Replacement Restroom remodel. Status: Under Inspection | Not published | — |
| applied Dec 2 | #2025-097166-000-00-PT Plumbing Permit · Addition/Alteration/Replacement INSTALLATION OF PLUMBING FIXTURES Status: Final | Not published | — |
| applied Aug 25 | #2025-068908-000-00-ET Electrical Permit · Addition/Alteration/Replacement Install (4) twist lock 480V receptacles for forklift chargers Status: Final | Not published | — |
| applied Jul 23 | #2025-059185-000-00-ET Electrical Permit · Addition/Alteration/Replacement RECONNECT POWER TO 10 REPLACEMENT DOOR OPERATORS. Status: Final | Not published | — |