Commercial General Building, Electrical, Fire Protection, Plumbing work permitted November 21, 2024, with 31 permits through September 15, 2026.
HAZARDOUS / TANK - FUEL OIL PIPING TO DIESEL FUEL GENERATOR SUPPLIED BY OTHERS (700 GALLON)
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
31 permits issued Nov 21 – Sep 15, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 27 | #2026-054546-000-00-FS Fire Systems Permit · New HAZARDOUS / TANK - FUEL OIL PIPING TO DIESEL FUEL GENERATOR SUPPLIED BY OTHERS (700 GALLON) Status: Final | Not published |
| — |
| applied Apr 30 | #2023-110909-DFS-20-CO Commercial Building Permit · New Construction PSU A+D - DFS 20 - Exterior handrails at Main Entry Status: Final | Not published | — |
| applied May 15 | #2023-110909-DFS-21-CO Commercial Building Permit · New Construction PSU A+D - DFS 21 - HVAC roof duct support anchorage Status: Final | Not published | — |
| applied Apr 15 | #2023-110909-REV-03-CO Commercial Building Permit · New Construction PSU A+D - REV-03 - Revision to structural drawings to support equipment in DFS-15. New penetration in glulam roof beam. Modifications to canopy framing and elevator overrun roof. Status: Final | Not published | — |
| applied Feb 10 | #2023-110909-DFS-15-CO Commercial Building Permit · New Construction PSU A+D - DFS-15 - Mechanical penthouse piping and equipment seismic attachments Status: Final | Not published | — |
| applied Mar 18 | #2023-110909-DFS-19-CO Commercial Building Permit · New Construction PSU A+D - DFS 19 - Prefabricated ladders Status: Final | Not published | — |
| applied Mar 23 | #2023-110909-DFS-18-CO Commercial Building Permit · New Construction PSU A+D - DFS 18 - Guardrails and handrails at loading dock Status: Final | Not published | — |
| applied Feb 28 | #2023-110909-DFS-16-CO Commercial Building Permit · New Construction PSU A+D - DFS-16 - Fiberglass window attachments Status: Final | Not published | — |
| applied Feb 27 | #2023-110909-DFS-17-CO Commercial Building Permit · New Construction PSU A+D - DFS-17 - Plumbing seismic attachments Status: Final | Not published | — |
| applied Oct 14 | #2023-110909-DFS-14-CO Commercial Building Permit · New Construction PSU A+D - DFS-14 - Mechanical seismic attachments Status: Final | Not published | — |
| applied Dec 3 | #2023-110909-REV-02-CO Commercial Building Permit · New Construction PSU A+D - REV-02 to DFS-06 - Revision to design of the interior non-structural light-gauge suspended soffits supporting recessed roller shades on Level 01 Status: Final | Not published | — |
| applied Dec 17 | #2025-100998-000-00-ET Electrical Permit · New Construction Pulling Cat6 and composite cable for data and security installation Status: Final | Not published | — |
| applied Sep 29 | #2023-110909-DFS-12-CO Commercial Building Permit · New Construction PSU A+D - DFS-12 - Seismic bracing for fire suppression system Status: Final | Not published | — |
| applied Oct 1 | #2023-110909-DFS-13-CO Commercial Building Permit · New Construction PSU A+D - DFS-13 - HVAC duct riser seismic anchorage Status: Final | Not published | — |
| applied Oct 21 | #2025-085427-000-00-FS Fire Systems Permit · New UNDERGROUND - INSTALL NEW 6" UNDERGROUND FOR NEW FIRE SPRINKLER FEED Status: Final | Not published | — |
| applied Sep 2 | #2023-110909-DFS-11-CO Commercial Building Permit · New Construction PSU A+D - DFS-11 - Aluminum curtain wall and glazing system Status: Final | Not published | — |
| applied Aug 27 | #2023-110909-DFS-10-CO Commercial Building Permit · New Construction PSU A+D - DFS-10 - Suspended interior ceilings Status: Final | Not published | — |
| applied Jul 28 | #2023-110909-DFS-09-CO Commercial Building Permit · New Construction PSU A+D - DFS-09 - Precast concrete anchorage Status: Final | Not published | — |
| applied Jul 25 | #2023-110909-DFS-08-CO Commercial Building Permit · New Construction PSU A+D - DFS-08 - Electrical equipment seismic anchorage Status: Final | Not published | — |
| applied Jun 16 | #2023-110909-DFS-07-CO Commercial Building Permit · New Construction PSU A+D - DFS-07 - Fall tie-off anchors for window cleaning Status: Final | Not published | — |
| applied Jul 21 | #2025-056810-000-00-FS Fire Systems Permit · New ALARM - EMERGENCY RESPONDER RADIO COVERAGE SYSTEM - REMOTE UNIT OF A FIBER SYSTEM. Status: Final | Not published | — |
| applied Jun 3 | #2023-110909-DFS-06-CO Commercial Building Permit · New Construction PSU A+D - DFS-06 - Non-structural metal framing Status: Final | Not published | — |
| applied May 29 | #2023-110909-DFS-05-CO Commercial Building Permit · New Construction PSU A+D - DFS-05 - Intumescent paint Status: Final | Not published | — |
| applied Apr 22 | #2023-110909-DFS-02-CO Commercial Building Permit · New Construction PSU A+D - DFS-02 - Spray applied fireproofing Status: Final | Not published | — |
| applied Apr 21 | #2023-110909-DFS-04-CO Commercial Building Permit · New Construction PSU A+D - DFS-04 - Prefabricated metal skylights and curbs Status: Final | Not published | — |
| applied Apr 21 | #2023-110909-DFS-03-CO Commercial Building Permit · New Construction PSU A+D - DFS-03 - Composite metal wall panels and attachment Status: Final | Not published | — |
| applied Feb 19 | #2025-008276-000-00-FS Fire Systems Permit · New SPRINKLER - INSTALL NEW FIRE SPRINKLER SYSTEM FOR NEW PSU ART BUILDING; INCLUDING A FIRE PUMP AND 3 STANDPIPES **U/G NOT INCLUDED IN SCOPE PER SWIFT FIRE. MISSTAKE IN THEIR SUBMITTAL APPLICATION** Status: Final | Not published | — |
| applied Dec 12 | #2024-104176-000-00-FS Fire Systems Permit · New ALARM - FIRE ALARM INSTALLATION IN NEW CONSTRUCTION (+ 127 SPEAKER STROBES) Status: Final | Not published | — |
| applied Dec 6 | #2024-102981-000-00-PT Plumbing Permit · New Construction PROVIDE AND INSTALL STORM, WASTE, RADON & DOMESTIC WATER SYSTEMS. Status: Final | Not published | — |
| applied Nov 6 | #2023-110909-REV-01-CO Commercial Building Permit · New Construction PSU A+D - REV-01 - Revise structural drawings and calculations for the bucking restraint braces (BRBs) to align with DFS-01 Status: Final | Not published | — |
| applied Oct 8 | #2023-110909-DFS-01-CO Commercial Building Permit · New Construction PSU A+D - DFS-01 - Seismic buckling restrained braces (BRB) Status: Final | Not published | — |