Commercial General Building, Electrical, Plumbing work permitted November 4, 2024, with 32 permits through September 16, 2026, declaring $884,060 of work.
SINGLE PDF PROCESS/ DEVELOPMENT SERVICES HVAC 1ST & 2ND FLRS; INSTALL DUCTWORK, REPLACE AIR HANDLERS, WATER PUMPS, EXPANSION TANK, PIPING AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
32 permits issued Nov 4 – Sep 16, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 16 | #2026-068740-000-00-FA Facility Permit · Alteration 4th ave bld- Access control modification - Install automatic operator for FAB160 Status: Issued | Not published | — |
| applied Sep 16 | #2026-068716-000-00-FA Facility Permit · Alteration PSU- install (2) security cameras Status: Issued | Not published | — |
| applied Sep 16 | #2026-068742-000-00-FA Facility Permit · Alteration access controls-4th ave bld- Access control modification - Install automatic operator for FAB160. Status: Final | Not published | — |
| applied Sep 16 | #2026-068717-000-00-FA Facility Permit · Alteration cameras - PSU- install (2) security cameras Status: Final | Not published | — |
| applied Aug 5 | #2026-058047-000-00-FA Facility Permit · Alteration INSTALL NEW BOOSTER PUMP SKID. Status: Issued | Not published | — |
| applied Aug 5 | #2026-058056-000-00-FA Facility Permit · Alteration INSTALL BOOSTER PUMP SKID. Status: Issued | Not published | — |
| applied Jun 23 | #2026-045898-000-00-ET Electrical Permit · Addition/Alteration/Replacement WIRE FOR ELEVATOR MODERNIZATION *REPLACES PERMIT 25-031883* & WIRE FOR MINI-SPLIT - PSU 4TH AVE BLDG Status: Final | Not published | — |
| applied Mar 12 | #2026-018086-000-00-FA Facility Permit · Alteration 2 flr server room, install EPO Bypass switch for pre-action suppression system Status: Issued | Not published | — |
| applied Mar 12 | #2026-018087-000-00-FA Facility Permit · Alteration fire alarm- 2 flr server room, install EPO Bypass switch for pre-action suppression system Status: Final | Not published | — |
| applied Nov 16 | #2022-203491-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OMF 1900 BLDG REROOF; REROOF ENTIRE ROOF, NEW ROOF TIE OFF ANCHORS, LADDER AND CAGE, BIRD MESH OVER EXISTING LOUVERS, PLUMB, INSTALL 4 ROOF DRAINS, INSTALL 4 OVERFLOW DRAINS Status: Final | Not published | — |
| applied Nov 13 | #2022-202703-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OMF 1900 BLDG REROOF; VALUE ADDED REVISION TO REPLACE ALL ROOF ANCHORS AND GUARDRAILS Status: Final | Not published | $66K |
| applied Nov 25 | #2025-096100-000-00-FA Facility Permit · Alteration fire alarm - DEVELOPMENT SERVICES HVAC 1ST & 2ND FLRS; INSTALL DUCTWORK, REPLACE AIR HANDLERS, WATER PUMPS, EXPANSION TANK, PIPING AND ELEC Status: Final | Not published | — |
| applied Aug 7 | #2025-063833-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PSU FAB BUILDING ELEVATOR HVAC SUB BSMT & LWR LVL; INSTALL AIR HANDLING UNITS, CONDENSING UNITS, PIPING AND ELEC Status: Under Inspection | Not published | $26K |
| applied May 12 | #2025-037218-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PSU FAB BUILDING ELEVATOR HVAC SUB BSMT & LWR LVL; DEMOLISH, RELOCATE AND ADD SPRINKLERS TO ELEVATOR PITS, ADD SECTIONAL VALVES TO ELEVATOR PIT SPRINKLER LINES, DEMOLISH UNNECESSARY SPRINKLERS IN PITS, ELEVATOR MACHINE ROOM, 4 HEADS Status: Final | Not published | $11.5K |
| applied May 13 | #2025-037650-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Building elevators 46 & 47 and elevator 50 sump addition with alarm. Lovett will provide the labor, materials, and equipment to get this work completed. Status: Final | Not published | — |
| applied May 12 | #2025-037215-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PSU FAB BUILDING ELEVATOR HVAC SUB BSMT & LWR LVL; INSTALL AIR HANDLING UNITS, CONDENSING UNITS, PIPING AND ELEC Status: Issued | Not published | — |
| applied Apr 24 | #2025-032233-000-00-FA Facility Permit · Alteration hvac controls-DEVELOPMENT SERVICES HVAC 1ST & 2ND FLRS; INSTALL DUCTWORK, REPLACE AIR HANDLERS AHU 11 & 13 w/NEW AHU 2&3, WATER PUMPS, EXPANSION TANK, PIPING AND ELEC. Status: Final | Not published | — |
| applied Jun 1 | #2023-047313-000-00-FA Facility Permit · Alteration power DEVELOPMENT SERVICES HVAC 1ST & 2ND FLRS; INSTALL DUCTWORK, REPLACE AIR HANDLERS, WATER PUMPS, EXPANSION TANK, PIPING AND ELEC Status: Final | Not published | — |
| applied Mar 18 | #2025-021033-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ DEVELOPMENT SERVICES HVAC 1ST & 2ND FLRS; EXTENDING CURRENT OFFSET OF FIRE SPRINKLER RISER PIPING TO BE AS CLOSE AS POSSIBLE TO THE EXISTING EXHAUST DUCT, DEMO & RELOCATE 6" SPRINKLER RISER Status: Issued | Not published | $3.5K |
| applied Mar 18 | #2025-020833-000-00-FA Facility Permit · Alteration re-feed )1) level 2 EVCS in Parking garage Status: Final | Not published | — |
| applied Mar 18 | #2025-020840-000-00-FA Facility Permit · Alteration power-re-feed (1) level 2 EVCS in Parking garage Status: Final | Not published | — |
| applied May 31 | #2023-047034-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ DEVELOPMENT SERVICES HVAC 1ST & 2ND FLRS; INSTALL DUCTWORK, REPLACE AIR HANDLERS, WATER PUMPS, EXPANSION TANK, PIPING AND ELEC Status: Issued | Not published | $650K |
| applied Mar 6 | #2025-017560-000-00-FA Facility Permit · Alteration 4th Ave Garage; Replace (44) Level 2 EVCVS in Parking garage Status: Final | Not published | — |
| applied Mar 6 | #2025-017565-000-00-FA Facility Permit · Alteration power-4th Ave Garage; Replace (44) Level 2 EVCVS in Parking garage Status: Final | Not published | — |
| applied Feb 18 | #2025-012839-000-00-FA Facility Permit · Alteration Installation of overhead door open sensor for parking garage vehicle exit gate and replacement of existing exit gate hold open point sensor with a light curtain. Status: Final | Not published | — |
| applied Feb 18 | #2025-012837-000-00-FA Facility Permit · Alteration Installation of overhead door open sensor for parking garage vehicle exit gate and replacement of existing exit gate hold open point sensor with a light curtain. Status: Issued | Not published | — |
| applied Jan 10 | #2024-102583-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PSU 4TH AVE BLDG DOOR REPLACEMENT PLAZA LVL TI; VALUE ADDED REVISION TO REMOVE DOOR MAG HOLDS Status: Final | Not published | $500 |
| applied Dec 11 | #2022-202703-DFS-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ OMF 1900 BLDG REROOF; DFS FOR FIXED LADDER Status: Final | Not published | $5K |
| applied Dec 11 | #2024-103971-000-00-FA Facility Permit · Alteration access and video surveillance - PSU 4TH AVE BLDG DOOR REPLACEMENT PLAZA LVL TI; MINOR DEMO, INSTALL NEW FIRE DOORS, FINISHES AND ELEC Status: Final | Not published | — |
| applied Dec 5 | #2024-102583-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PSU 4TH AVE BLDG DOOR REPLACEMENT PLAZA LVL TI; MINOR DEMO, INSTALL NEW FIRE DOORS, FINISHES AND ELEC Status: Final | Not published | $122K |
| applied Dec 5 | #2024-102581-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PSU 4TH AVE BLDG DOOR REPLACEMENT PLAZA LVL TI; MINOR DEMO, INSTALL NEW FIRE DOORS, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Oct 24 | #2024-091460-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PSU FAB ROOM 135 1ST FLR TI: ADDING A COUPLE FIRE ALARM STROBES AND MOVING ONE STROBE TO AN EXISTING CIRCUIT Status: Final | Not published | $5K |