Get Procommercial project · Portland, OR
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted May 23, 2025, with 15 permits through June 1, 2026, declaring $7,372,200 of work.
ARCHDIOCESE / ST MARY'S RENOVATION - *w. 25-026955-MT *Renovation and Seismic Strengthening to the North Building at the St. Mary's Cathedral. Includes Change of Occupancy to some spaces. The interiors of the structure will be gutted and new finishes, new MEP and new NFPA13 Fire suppression system (separate permits) will be installed. Demolition of connection to South Building (rats alley). SEISMIC UPGRADE TO BE COMPLETED UNDER A PHASED SEISMIC AGREEMENT IN TWO PHASES. SEE RELATED STR PERMITS FOR DESCRIPTIONS AND REQUIRED COMPLETION DATES FOR EACH PHASE.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
15 permits issued May 23 – Jun 1, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#2025-016678-DFS-02-CO Commercial Building Permit · Alteration ARCHDIOCESE / ST MARY'S RENOVATION -DFS-02- Water Heater/Tank Anchorage Status: Issued |
| Not published |
| $1.2K |
| applied Feb 26 | #2025-016678-REV-01-CO Commercial Building Permit · Alteration ARCHDIOCESE / ST MARY'S RENOVATION - REV-01 - Structural strengthening (bracing)at SW masonry chimney, modifications to a foundational grade beam (GB4), and removal of wood framed structure for egress protection at Rat's Alley Status: Issued | Not published | — |
| applied Jan 30 | #2025-016678-DFS-01-CO Commercial Building Permit · Alteration ARCHDIOCESE / ST MARY'S RENOVATION STR-02 - DFS-01 - Exterior Guardrails Status: Issued | Not published | $6.8K |
| applied Mar 16 | #2026-018971-000-00-ET Electrical Permit · Addition/Alteration/Replacement 25139 Archdiocese St. Joseph's Hall Project - Low Voltage wiring for installing (16) thermostats in the Pastoral Center Offices (North Building) Status: Final | Not published | — |
| applied Dec 23 | #2025-101505-000-00-FS Fire Systems Permit · Addition ALARM - INSTALLATION OF NEW FIRE ALARM DEVICES IN REMODELED SPACE ON (3) FLOORS OF EXISTING BUILDING AND INSTALLATION OF NEW ELEVATOR. ADDING (1) NAC PANEL AND DEVICES TO EXISTING FACP LOCATED IN ADJOINING BUILDING. Status: Issued | Not published | — |
| applied Apr 11 | #2025-016678-000-00-CO Commercial Building Permit · Alteration ARCHDIOCESE / ST MARY'S RENOVATION - *w. 25-026955-MT *Renovation and Seismic Strengthening to the North Building at the St. Mary's Cathedral. Includes Change of Occupancy to some spaces. The interiors of the structure will be gutted and new finishes, new MEP and new NFPA13 Fire suppression system… Status: Under Inspection | Not published | $7.4M |
| applied Oct 30 | #2025-089052-000-00-CO Commercial Building Permit · Alteration ARCHDIOCESE / ST. MARY'S RENOVATION - permit to document South building becomes "stand alone" detached from North building with PHASED SEISMIC AGREEMENT 25-016678-STR-02 demolition of "rats alley" connection. *** w. 25-016678-STR-02-CO** Status: Under Inspection | Not published | — |
| applied Sep 24 | #2025-016678-STR-02-CO Commercial Building Permit · Alteration **ISSUE MAIN PERMIT WITH THIS PHASE, NEED FEES IN 25-089052-CO PAID **ARCHDIOCESE / ST MARY'S RENOVATION - STR-02 -Phase 2 of 2 of Phased Seismic Agreement. Demolition of the connection between the North and South Building, known as Rats Alley. Completion date of July 30, 2029 Status: Under Inspection | Not published | — |
| applied Oct 13 | #2025-082987-000-00-FS Fire Systems Permit · New SPRINKLER - ADD NEW WET FIRE SPRINKLER SYSTEMS IN AN EXISTING BUILDING FOR LEVELS 1, 2, & 3. ADD A NEW DRY FIRE SPRINKLER SYSTEM IN THE EXISTING ATTIC Status: Under Inspection | Not published | — |
| applied Oct 13 | #2025-059541-000-00-FS Fire Systems Permit · New UNDERGROUND - INSTALL 16'-6" OF DUCTILE IRON PIPING FOR AN IN BUILDING RISER. Status: Under Inspection | Not published | — |
| applied Apr 11 | #2025-026955-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) ISSUE WITH 25-016678-STR-01-CO*** St. Mary's Renovation - Renovation of N portion of building and demo of "rats alley" under Phased Seismic Agreement **w. 25-016678 -CO** - Installation of (1) VRF system and (2) ERVs to serve the entire building including refrigerant and condensate piping and… Status: Final | Not published | — |
| applied Aug 7 | #2025-016678-STR-01-CO Commercial Building Permit · Alteration PLAN REVIEW / COMMENTS ARE IN PDOX UNDER 25-016678-CO** ARCHDIOCESE / ST MARY'S RENOVATION-STR-01- *w. 25-026955-MT * Phase 1 of 2 of Phased Seismic Agreement. Renovation and mandatory ASCE 41-17 BPOE seismic upgrade to the North Building at the St. Mary's Cathedral. Includes Change of Occupancy… Status: Under Inspection | Not published | — |
| applied Sep 19 | #2025-072361-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX 241060 - REPLACE (1) 1200A 120/208V SERVICE, REFEED (2) PANELS, INSTALL BRANCH CIRCUITS, FIRE ALARM AND ACCESS CONTROL FOR REMODEL Status: Under Inspection | Not published | — |
| applied Jun 13 | #2025-047077-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) Replace/relocate 100 ft of 2" gas piping in Rats Alley. About 110 ft of 1/2" NG piping for range on 3rd floor. Gas line to connect to existing service. Range/fixtures by others. Add (1) gas shutoff valve. Add (1) gas regulator. Mech Permit: 25-047077-000-00-MT Status: Under Inspection | Not published | — |
| applied May 22 | #2025-040609-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Provide Commercial Area Fixtures: (1) floor mount mop sink w/ faucet; (4) floor mount tank type toilets; (3) undermount restroom sinks w/ faucets; (2) counter mount kitchen sinks w/ faucets; (2) ice maker boxes for refrigerators; (1) elevator sump pump w/ piping; (2) floor drains; (1) floor sink;… Status: Final | Not published | — |