Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted November 10, 2025, with 15 permits through August 24, 2026, declaring $455,000 of work.
PDOX PS - ORIGINAL 2-STORY, B OCCUPANCY OFFICE BUNGALOW TO BE REMOVED IN COMPLIANCE WITH COP DEMOLITION PERMANENT RULE AND REBUILT AS NEW SINGLE-STORY A-2 OCCUPANCY BAR WITH VAULTED CEILING ABOVE EXISTING BASEMENT. PARTIAL CHANGE OF OCCUPANCY IN THE EXISTING S-1 OCCUPANCY BASEMENT TO CREATE B OCCUPANCY LOUNGE. MAIN FLOOR LEVEL OF REBUILT STRUCTURE WILL BE LOWERED TO ALIGN WITH ADJACENT GRADE AND THE BASEMENT FLOOR LEVEL WILL BE EXCAVATED AND LOWERED TO BE APPROXIMATELY 4'-11" BELOW ITS EXISTING LEVEL. DEMOLISH 1994 ADDITION TO BUILD NEW A-2 OCCUPANCY COVERED OUTDOOR PATIO, RESTROOMS, S-1…
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
15 permits issued Nov 10 – Aug 24, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#2025-034137-DFS-04-CO Commercial Building Permit · Alteration SINGLE PDF - DFS FOR STEEL HANDRAILS AND GUARDRAIL SYSTEM Status: Final |
| Not published |
| — |
| applied May 21 | #2025-034137-DFS-03-CO Commercial Building Permit · Alteration SINGLE PDF - DFS FOR ROOFTOP MECH ANCHORAGE Status: Final | Not published | — |
| applied May 19 | #2025-034137-DFS-02-CO Commercial Building Permit · Alteration SINGLE PDF - DFS FOR FOLDING DOOR Status: Final | Not published | — |
| applied Mar 26 | #2025-034137-DFS-01-CO Commercial Building Permit · Alteration SINGLE PDF - DFS FOR ROOF TRUSSES Status: Final | Not published | — |
| applied Mar 2 | #2025-034137-REV-02-CO Commercial Building Permit · Alteration PDOX - NON-VALUE-ADDED REVISION TO ROOF FRAMING, ROOFING, AND ASSOCIATED ADJUSTMENTS TO MEP. Status: Final | Not published | — |
| applied Feb 17 | #2026-009702-000-00-FS Fire Systems Permit · New SPRINKLER & UNDERGROUND - SPRINKLER PIPING & HEADS, EARTHQUAKE BRACING, HANGARS & BRACING, SPARE HEADS & HEAD BOX, DRY VALVE. FIRE VAULT, DOUBLE CHECK ASSEMBLY, U/G PIPE & FITTINGS Status: Final | Not published | — |
| applied Apr 23 | #2026-028126-000-00-FS Fire Systems Permit · New ALARM - DEDICATED SPRINKLER MONITORING SYSTEM FOR A/B/S OCCUPANCY WITH OCCUPANT LOAD LESS THAN 300 Status: Final | Not published | — |
| applied Apr 21 | #2026-028594-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) 10 UNDERGROUND GAS LINES, 9 FOR FOOD CARTS AND 1 FOR THE HOUSE. Status: Final | Not published | — |
| applied May 13 | #2025-037414-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) PDOX PS - DEMO EXISTING MECHANICAL SYSTEM AND INSTALL NEW SYSTEM TO INCLUDE: CENTRAL HEATING/AIR CONDITIONG, FAN COIL UNITS, CADET HEATERS, AND GAS HEATERS. w/25-034137-CO Status: Final | Not published | — |
| applied Apr 9 | #2026-025955-000-00-ET Electrical Permit · New Construction Installation of sprinkler monitoring fire alarm system Status: Final | Not published | — |
| applied Jan 14 | #2025-092692-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX - (9) FOOD CARTS AND BAR, INSTALL 800A SVC Status: Final | Not published | — |
| applied Jan 8 | #2025-034137-REV-01-CO Commercial Building Permit · Alteration PDOX PS - VALUE ADDED REVISION TO CHANGE SITEWORK AND CHANGE IN FOOD CART LAYOUT. SITEWORKS INCLUDES REMOVAL OF TREES AND ROW WORKS. Status: Final | Not published | $5K |
| applied Jan 15 | #2026-003707-000-00-ET Electrical Permit · New Construction Full wiring Status: Final | Not published | — |
| applied Dec 20 | #2025-101881-000-00-PT Plumbing Permit · New Construction Food cart plumbing - restrooms - kitchen - bar Status: Final | Not published | — |
| applied May 14 | #2025-034137-000-00-CO Commercial Building Permit · Alteration PDOX PS - ORIGINAL 2-STORY, B OCCUPANCY OFFICE BUNGALOW TO BE REMOVED IN COMPLIANCE WITH COP DEMOLITION PERMANENT RULE AND REBUILT AS NEW SINGLE-STORY A-2 OCCUPANCY BAR WITH VAULTED CEILING ABOVE EXISTING BASEMENT. PARTIAL CHANGE OF OCCUPANCY IN THE EXISTING S-1 OCCUPANCY BASEMENT TO CREATE B… Status: Final | Not published | $450K |