Get ProEvery project in every city · from $79/mo
Get Procommercial project · Portland, OR
Commercial General Building, Electrical, Plumbing work permitted June 6, 2025, with 7 permits through June 12, 2026, declaring $617,000 of work.
PDOX PS: REMODEL TO 5 CLASSROOMS ON EXISTING SCHOOL BUILDING. INCLUDES INTERIOR FINISHES, FIXTURE CHANGE AND WINDOW AND DOOR PANEL REPLACEMENT.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
7 permits issued Jun 6 – Jun 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 12 | #2026-043394-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Replace approx 115' of sewer line Status: Final | Not published | — |
| applied Jan 9 | #2025-045704-REV-01-CO Commercial Building Permit · New Construction PDOX PS: REVISION TO MOVE LOCATION OF BUILDING PER SITE CONDITION. Status: Final | Not published | — |
| applied Jul 23 | #2025-045704-000-00-CO Commercial Building Permit · New Construction PDOX PS: NEW 50'X80' PREFAB METAL BUILDING FOR SHELTERED PLAY AREA OVER EXISTING ASPHALT. Status: Final | Not published | $167K |
| applied Jul 14 | #2025-055822-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Add new sinks and drinking fountain Status: Final | Not published | — |
| applied Aug 21 | #2025-067891-000-00-ET Electrical Permit · Addition/Alteration/Replacement 25-0149 CSD PARKLANE ELEMENTARY SCHOOL CLASSROOM RENOVATION. SERVICE CHANGE AND 10 BRANCH CIRCUITS. Status: Final | Not published | — |
| applied Aug 4 | #2025-062796-000-00-ET Electrical Permit · Addition/Alteration/Replacement 25-0149 CSD Parklane Elementary School Classroom Renovation, (2) panel changes (Pnl F outside room # 26, Panl E outside of classroom 21), lighting disconnect and re-install for classrooms (19, 23-26), re-route surface line voltage behind sheetrock in same classrooms Status: Final | Not published | — |
| applied Mar 28 | #2025-014998-000-00-CO Commercial Building Permit · Alteration PDOX PS: REMODEL TO 5 CLASSROOMS ON EXISTING SCHOOL BUILDING. INCLUDES INTERIOR FINISHES, FIXTURE CHANGE AND WINDOW AND DOOR PANEL REPLACEMENT. Status: Final | Not published | $450K |