Commercial Electrical, Hvac/Mechanical, Plumbing, Sign work permitted March 24, 2025, with 16 permits through February 24, 2026.
INSTALLING APPROXIMATELY 20 LF OF 6" STORM SEWER THAT IS CONNECTED TO THE ROOF DRAIN OF A NEW BIKE RACK, AND AN EXISTING STORM LINE.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
16 permits issued Mar 24 – Feb 24, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Feb 23 | #2026-013364-000-00-PT Plumbing Permit · Addition/Alteration/Replacement INSTALLING APPROXIMATELY 20 LF OF 6" STORM SEWER THAT IS CONNECTED TO THE ROOF DRAIN OF A NEW BIKE RACK, AND AN EXISTING STORM LINE. Status: Final |
| Not published |
| — |
| applied Aug 15 | #2025-065178-000-00-SG Sign Permit · New Sign/Awning NEW 1 OF 2 SIGNS. 8.19 SQ FT NON-ILLUMINATED INDIVIDUAL LETTERED SIGN FOR SOUTH CAMPUS BUILDING AT DAVID DOUGLAS HS (SIGN 2), WEST ELEVATION. W/25-065178/181 SG Status: Issued | Not published | — |
| applied Aug 15 | #2025-065181-000-00-SG Sign Permit · New Sign/Awning NEW 2 OF 2 SIGNS. 24.12 SQ FT NON-ILLUMINATED INDIVIDUAL LETTERED SIGN FOR SOUTH CAMPUS BUILDING AT DAVID DOUGLAS HS (SIGN 1), SOUTH ELEVATION. W/25-065178/181 SG Status: Issued | Not published | — |
| applied Aug 28 | #2025-070133-000-00-ET Electrical Permit · Addition/Alteration/Replacement NSTALLATION OF NEW VOICE EVACUATION FIRE ALARM SYSTEM IN A REMODELED HIGH SCHOOL BUILDING COMPLEX. Status: Final | Not published | — |
| applied Aug 21 | #2025-067807-000-00-PT Plumbing Permit · Addition/Alteration/Replacement replace 20' of sewer lateral due to pipe failure. Status: Final | Not published | — |
| applied Jul 16 | #2025-057276-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) SINGLEPDF - PIPE GAS TO RTUS AND WELDING GAS Status: Final | Not published | — |
| applied Jul 7 | #2025-053699-000-00-PT Plumbing Permit · Addition/Alteration/Replacement install 2 catch basins, 1 storm filtered manhole and 170' of storm line for roof drains. Status: Final | Not published | — |
| applied Jun 24 | #2025-049923-000-00-ET Electrical Permit · Addition/Alteration/Replacement Limited Energy Cabling as applicable to paging system update/upgrade Status: Final | Not published | — |
| applied Jun 24 | #2025-049937-000-00-ET Electrical Permit · Addition/Alteration/Replacement *SOUTH RENOVATION PROJECT* LIMITED ENERGY CABLING AS APPLICABLE TO PAGING AND SECURITY UPGRADES Status: Final | Not published | — |
| applied Jun 24 | #2025-049926-000-00-ET Electrical Permit · Addition/Alteration/Replacement *CTE CENTER* - LIMITED ENERGY CABLING AS APPLICABLE TO PAGING SYSTEM UPGRADES Status: Final | Not published | — |
| applied Jun 5 | #2025-044329-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Piper Mechanical will provide and install hub drain for walk-in cooler and piping for DDHS South Campus Renovation. Status: Final | Not published | — |
| applied May 19 | #2025-039187-000-00-PT Plumbing Permit · Addition/Alteration/Replacement new food science lab, re-pipe gas supply to welding area in metal shop class, new sinks and restroom in sector E, new restroom and sinks in preschool area of sector E Status: Final | Not published | — |
| applied May 2 | #2025-034855-000-00-PT Plumbing Permit · New Construction Piper Mechanical will provide and install underground water piping, sprinkler piping, and hose bibs for greenhouse. Status: Final | Not published | — |
| applied Apr 23 | #2025-031840-000-00-ET Electrical Permit · Addition/Alteration/Replacement HVAC Control Wiring 24 volt or less Status: Final | Not published | — |
| applied Dec 31 | #2024-107608-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX - MAJOR RENOVATION OF SOUTH CAMPUS BLDG Status: Final | Not published | — |
| applied Mar 17 | #2025-017940-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX - INSTALL VARIOUS LOW VOLTAGE SYSTEM; FIRE ALARM; AND HVAC UPGRADES IN SOUTH CAMPUS BUILDING Status: Final | Not published | — |