Commercial General Building, Electrical, Fire Protection work permitted November 13, 2024, with 7 permits through March 19, 2026, declaring $33,926 of work.
SINGLE PDF PROCESS/ PPS CHAPMAN ELEMENTARY ADA UPGRADES TI; DFS FOR METAL ADA RAMPS
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
7 permits issued Nov 13 – Mar 19, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Mar 4 | #2026-015973-000-00-FS Fire Systems Permit · Removal SPRINKLER - REMOVAL OF (6) FIRE HOSES. HOSES ARE LOCATED NEXT TO RM 2, NEAR FACILITIES RR, NEXT TO RM 10, RM 15, RM 19 AND RM 23. Status: Final | Not published | — |
| applied Dec 30 | #2025-103212-000-00-ET Electrical Permit · Addition/Alteration/Replacement Repair existing raceways. Complete previously unfinished circuits installed by others **JBotkin - No plan review required Status: Final | Not published | — |
| applied Dec 18 | #2024-044778-000-00-FA Facility Permit · Alteration 3-SINKS, 2-WC, 2-FIXTURE CAPS Status: Final | Not published | — |
| applied Sep 25 | #2023-038661-DFS-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PPS CHAPMAN ELEMENTARY ADA UPGRADES TI; DFS FOR METAL ADA RAMPS Status: Final | Not published | $33.9K |
| applied Jan 21 | #2025-004826-000-00-ET Electrical Permit · Addition/Alteration/Replacement 12 strand OS2 SM Fiber Backbone install from MDF to a new cabinet in Classroom and 2nd floor Auditorium rack Status: Final | Not published | — |
| applied Jan 16 | #2025-004056-000-00-ET Electrical Permit · Addition/Alteration/Replacement Cabling Infrastructure Upgrade - Providing Power to Low Voltage Cabinet Status: Final | Not published | — |
| applied May 10 | #2023-039872-000-00-FA Facility Permit · Alteration pwr_PPS CHAPMAN ELEMENTARY ADA UPGRADES TI; EXTERIOR - NEW ADA RAMP W/ HANDRAILS, STAIRS W/ HANDRAILS, REPLACE HANDRAILS, INTERIOR - DEMO WALLS, REMODEL BATHRMS, CLASSRMS, AUDITORIUM SEATING, INSTALL NEW PLATFORM LIFT IN AUDITORIUM, REPLACE STAIR HANDRAILS, CEILING, FINISHES, ELEC Status: Final | Not published | — |