Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted November 7, 2024, with 75 permits through October 8, 2026, declaring $7,217,846 of work.
SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB CORE LINE REPLACEMENT 1ST FLR; DEMO WALLS, NEW WALLS TO CREATE LAB, WORK AREA, CONTROL AREA, INSTALL STRUCTURAL ANCHORAGE FOR NEW EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
75 permits issued Nov 7 – Oct 8, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 29 | #2026-072313-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB KARDEX STORAGE EQUIPMENT REPLACEMENT; ADDING A HEAD TO THE TOP OF 5 CAROUSELS, 5 HEADS |
Status: Issued
| Not published |
| $11.3K |
| applied Jul 7 | #2026-049881-000-00-FA Facility Permit · Alteration power-KAISER PERMANENTE REGIONAL LAB MOLECULAR DEPARTMENT EQUIPMENT REPLACEMENT 1ST FLR; MINOR DEMO, INSTALL SEISMIC ANCHORAGE FOR ANALYZER, HOODS, FLOORING, FINISHES AND ELEC Status: Final | Not published | — |
| applied Feb 2 | #2026-008061-000-00-FA Facility Permit · Alteration power-KAISER PERMANENTE REGIONAL LAB KARDEX REMSTAR REPLACEMENT STE C; MINOR DEMO, INSTALL ANCHORAGE, STEEL FRAME Status: Final | Not published | — |
| applied Sep 3 | #2026-065858-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB KARDEX REMSTAR REPLACEMENT STE C; ADD ONE (1) DRY PENDENT SPRINKLER HEAD FOR NEW UNIT INSTALLATION, 1 HEAD Status: Final | Not published | $3.2K |
| applied Jul 28 | #2026-055602-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB KARDEX STORAGE EQUIPMENT REPLACEMENT; INSTALL ANCHORAGE FOR VERTICAL CAROUSEL MODULES, VERTICAL LIFT MODULES, CEILING, FLOORING, FINISHES AND ELEC Status: Issued | Not published | $23K |
| applied Jul 28 | #2026-055597-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB KARDEX STORAGE EQUIPMENT REPLACEMENT; INSTALL ANCHORAGE FOR VERTICAL CAROUSEL MODULES, VERTICAL LIFT MODULES, CEILING, FLOORING, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Jul 2 | #2026-049115-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB MOLECULAR DEPARTMENT EQUIPMENT REPLACEMENT 1ST FLR; MINOR DEMO, INSTALL SEISMIC ANCHORAGE FOR ANALYZER, HOODS, FLOORING, FINISHES AND ELEC Status: Final | Not published | $96.4K |
| applied Jul 2 | #2026-049112-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB MOLECULAR DEPARTMENT EQUIPMENT REPLACEMENT 1ST FLR; MINOR DEMO, INSTALL SEISMIC ANCHORAGE FOR ANALYZER, HOODS, FLOORING, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Jun 17 | #2026-044647-000-00-FA Facility Permit · Alteration Add Circuit for RPBA replacement Status: Final | Not published | — |
| applied Jun 17 | #2026-044646-000-00-FA Facility Permit · Alteration Add Circuit for RPBA replacement Status: Issued | Not published | — |
| applied Jan 6 | #2026-001272-000-00-FA Facility Permit · Alteration power-KAISER PERMANENTE REGIONAL LAB CART WASHER 1ST FLR TI; MINOR DEMO, INSTALL TEMPORARY WALL INFILLS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Jan 28 | #2026-006955-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB KARDEX REMSTAR REPLACEMENT STE C; MINOR DEMO, INSTALL ANCHORAGE, STEEL FRAME Status: Final | Not published | $103K |
| applied Mar 5 | #2026-016329-000-00-ET Electrical Permit · Addition/Alteration/Replacement Connect Cart Washer to existing circuit. Status: Final | Not published | — |
| applied Jan 6 | #2026-001242-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB CART WASHER 1ST FLR TI; MINOR DEMO, INSTALL TEMPORARY WALL INFILLS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $150K |
| applied Jan 28 | #2026-006953-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB KARDEX REMSTAR REPLACEMENT STE C; MINOR DEMO, INSTALL ANCHORAGE, STEEL FRAME Status: Issued | Not published | — |
| applied Jan 6 | #2026-001240-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB CART WASHER 1ST FLR TI; MINOR DEMO, INSTALL TEMPORARY WALL INFILLS, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Oct 22 | #2024-027294-REV-03-CO Commercial Building Permit · Alteration REV 03 - equipment location changes Status: Final | Not published | — |
| applied Oct 1 | #2025-015544-DFS-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KP AWL OPTICAL LAB 1ST FLR INT & EXT; DFS FOR EQUIPMENT ANCHORAGE AND OEVERHEAD ELECTRICAL CONDUIT RACKING Status: Final | Not published | $3.6K |
| applied Sep 16 | #2025-015544-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KP AWL OPTICAL LAB 1ST FLR INT & EXT; REVISION TO NEW WALLS, FLOOR PLAN LAYOUTS, DUST COLLECTOR RM LAYOUT, LOADING DOCK, ROOFTOP SCREENING, WALL TYPES, HVAC EQUIPMENT SCHEDULE, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Oct 21 | #2025-085965-000-00-FA Facility Permit · Alteration data- KAISER PERMANENTE REGIONAL LAB CORE LINE REPLACEMENT 1ST FLR; DEMO WALLS, NEW WALLS TO CREATE LAB, WORK AREA, CONTROL AREA, INSTALL STRUCTURAL ANCHORAGE FOR NEW EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jul 22 | #2025-058949-000-00-FA Facility Permit · Alteration power- KAISER PERMANENTE REGIONAL LAB CORE LINE REPLACEMENT 1ST FLR; DEMO WALLS, NEW WALLS TO CREATE LAB, WORK AREA, CONTROL AREA, INSTALL STRUCTURAL ANCHORAGE FOR NEW EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Under Inspection | Not published | — |
| applied May 28 | #2025-042069-000-00-ET Electrical Permit · Addition/Alteration/Replacement data cable add, terminations Status: Final | Not published | — |
| applied Apr 29 | #2024-027294-DFS-02-CO Commercial Building Permit · Alteration Kaiser - DFS 02 - Stairs at loading dock and AHU platform Status: Final | Not published | — |
| applied Sep 19 | #2025-056389-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB CORE LINE REPLACEMENT 1ST FLR; REVISION TO STRUCTURAL ANCHORING, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Aug 7 | #2025-064070-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB CORE LINE REPLACEMENT 1ST FLR; DEMO WALLS, NEW WALLS TO CREATE LAB, WORK AREA, CONTROL AREA, INSTALL STRUCTURAL ANCHORAGE FOR NEW EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Under Inspection | Not published | — |
| applied Aug 20 | #2025-067527-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB ROOF REPAIR AREA D; MINOR DEMO, REROOF ROOF SECTION D, INSTALL NEW INSULATION, SHIP LADDER, SKYLIGHT, RAIN GUTTER & DOWN SPOUT, CURBS, RAISE PARAPET, FINISHES AND PLUMB Status: Issued | Not published | $900K |
| applied Jul 15 | #2025-056390-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB CORE LINE REPLACEMENT 1ST FLR; INSTALL TERMINAL UNITS, AHUS, DUCTWORK, PIPING, DIFFUSERS, GRILLES AND ELEC Status: Issued | Not published | $30.5K |
| applied Jul 15 | #2025-056389-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB CORE LINE REPLACEMENT 1ST FLR; DEMO WALLS, NEW WALLS TO CREATE LAB, WORK AREA, CONTROL AREA, INSTALL STRUCTURAL ANCHORAGE FOR NEW EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Under Inspection | Not published | $2.2M |
| applied Aug 12 | #2025-065053-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER REGIONAL LAB MAIN SECURITY COMMAND CENTER 1ST FLR TI; ADD 1 STROBE FOR NEW TI Status: Final | Not published | $1.8K |
| applied Aug 20 | #2025-067523-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB ROOF REPAIR AREA D; MINOR DEMO, REROOF ROOF SECTION D, INSTALL NEW INSULATION, SHIP LADDER, SKYLIGHT, RAIN GUTTER & DOWN SPOUT, CURBS, RAISE PARAPET, FINISHES AND PLUMB Status: Issued | Not published | — |
| applied Jun 30 | #2024-027294-DFS-03-CO Commercial Building Permit · Alteration Kaiser - DFS 03 - Seismic engineering / equipment attachments Status: Final | Not published | — |
| applied Jun 30 | #2024-027294-DFS-06-CO Commercial Building Permit · Alteration Kaiser - DFS 06 - RTU-104 Anchoring Status: Final | Not published | — |
| applied Aug 1 | #2024-027296-REV-02-MT Mechanical Permit · Addition/Alteration/Replace (MT) Kaiser - REV 02 - HVAC lab changes related to hoods. w/24-027294-REV-02-CO. Status: Final | Not published | — |
| applied Aug 1 | #2024-027294-REV-02-CO Commercial Building Permit · Alteration Kaiser - REV 02 - Removal of an existing exterior door and addition of new 1-hr. wall for equipment sound mitigation. Added structural anchoring and calculations for additional equipment. **w/24-027296-REV-02-MT**. Status: Final | Not published | — |
| applied Jul 21 | #2025-058279-000-00-FA Facility Permit · Alteration KP AWL OPTICAL LAB 1ST FLR INT & EXT; ADD SMOKES AND STROBES FOR NEW TI, 18 SMOKE DETECTORS, 4 STROBES, 10 HORNS/STROBES AND 2 HEAT DETECTORS Status: Final | Not published | $10.5K |
| applied Jun 27 | #2024-027294-DFS-07-CO Commercial Building Permit · Alteration Kaiser - DFS 07 - Attachment of Switchgear Status: Final | Not published | — |
| applied Jun 30 | #2024-027294-DFS-04-CO Commercial Building Permit · Alteration Kaiser - DFS 04 - HVAC Seismic Bracing Status: Final | Not published | — |
| applied Jun 30 | #2024-027294-DFS-05-CO Commercial Building Permit · Alteration Kaiser - DFS 05 - PT Seismic Bracing Status: Final | Not published | — |
| applied Jul 15 | #2025-056386-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER PERMANENTE REGIONAL LAB CORE LINE REPLACEMENT 1ST FLR; DEMO WALLS, NEW WALLS TO CREATE LAB, WORK AREA, CONTROL AREA, INSTALL STRUCTURAL ANCHORAGE FOR NEW EQUIPMENT, CEILING, FLOORING, FINISHES, MED GAS, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jun 25 | #2025-050345-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER REGIONAL LAB MAIN SECURITY COMMAND CENTER 1ST FLR TI; ADD 5 NEW PENDENT SPRINKLERS AND RELOCATE 5 EXISTING PENDENT SPRINKLERS TO ACCOMMODATE NEW OFFICE BUILD OUT, 10 HEADS Status: Final | Not published | $3.4K |
| applied Jul 3 | #2025-052826-000-00-FA Facility Permit · Alteration paging - KP AWL OPTICAL LAB 1ST FLR INT & EXT; EXTERIOR - INSTALL LOADING DOCK ROLLUP DOORS, DOCK LEVELER, ROOF TOP METAL SCREEN WALL, INTERIOR - DEMO WALLS, NEW WALLS TO CREATE SHIPPING DEPT AREA, WORKSTATION ALCOVES, SERVER RM, SUPERVISOR ALCOVES, FINISHING DEPT AREA, FRAME/LENS INVENTORY AREA,… Status: Final | Not published | — |
| applied Jul 3 | #2025-052829-000-00-FA Facility Permit · Alteration data - KP AWL OPTICAL LAB 1ST FLR INT & EXT; EXTERIOR - INSTALL LOADING DOCK ROLLUP DOORS, DOCK LEVELER, ROOF TOP METAL SCREEN WALL, INTERIOR - DEMO WALLS, NEW WALLS TO CREATE SHIPPING DEPT AREA, WORKSTATION ALCOVES, SERVER RM, SUPERVISOR ALCOVES, FINISHING DEPT AREA, FRAME/LENS INVENTORY AREA,… Status: Final | Not published | — |
| applied Jul 2 | #2025-052636-000-00-FA Facility Permit · Alteration paging - KAISER REGIONAL LAB MAIN SECURITY COMMAND CENTER 1ST FLR TI; DEMO WALLS, NEW WALLS TO CREATE SCURITY OPERATIONS CENTER RMS, OFFICE, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Jul 1 | #2025-052273-000-00-FA Facility Permit · Alteration data - KAISER REGIONAL LAB MAIN SECURITY COMMAND CENTER 1ST FLR TI; DEMO WALLS, NEW WALLS TO CREATE SCURITY OPERATIONS CENTER RMS, OFFICE, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied May 22 | #2025-003418-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER AWL CORE LINE BRIDGE STRATEGY TI 1ST FLR; REVISION TO REMOVE STRUCTURAL SEISMIC ANCHORING Status: Final | Not published | — |
| applied May 15 | #2025-034942-000-00-FS Fire Systems Permit · New HAZARDOUS / TANK - NEW OUTSIDE GENERATOR INSTALLATION. SELF CONTAINED FUEL TANK BELOW GEN-SET Status: Final | Not published | — |
| applied May 6 | #2025-035705-000-00-FA Facility Permit · Alteration KP AWL OPTICAL LAB 1ST FLR INT & EXT - MODIFICATION TO EXISTING SPRINKLER SYSTEM TO ACCOUNT FOR NEW CEILINGS AND WALLS Status: Final | Not published | — |
| applied Mar 10 | #2025-018436-000-00-FA Facility Permit · Alteration power, access control, fire alarm- KAISER REGIONAL LAB MAIN SECURITY COMMAND CENTER 1ST FLR TI; DEMO WALLS, NEW WALLS TO CREATE SCURITY OPERATIONS CENTER RMS, OFFICE, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Mar 20 | #2024-027294-DFS-01-CO Commercial Building Permit · Alteration Kaiser - DFS 01 - Acoustical and Dry Wall Ceilings Status: Final | Not published | — |
| applied Feb 27 | #2025-015820-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER REGIONAL LAB MAIN SECURITY COMMAND CENTER 1ST FLR TI; DEMO WALLS, NEW WALLS TO CREATE SCURITY OPERATIONS CENTER RMS, OFFICE, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-SUPPLY BOX Status: Final | Not published | — |
| applied Apr 2 | #2025-025379-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER AWL CORE LINE BRIDGE STRATEGY TI 1ST FLR; MINOR DEMO, INSTALL STRUCTURAL ANCHORAGE FOR NEW EQUIPMENT, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, INSTALL RO-DI WATER PIPING, 1-DRAIN PUMP Status: Final | Not published | — |
| applied Mar 11 | #2025-018827-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KP AWL OPTICAL LAB 1ST FLR INT & EXT; EXTERIOR - INSTALL LOADING DOCK ROLLUP DOORS, DOCK LEVELER, INTERIOR - DEMO WALLS, NEW WALLS TO CREATE SHIPPING DEPT AREA, WORKSTATION ALCOVES, SERVER RM, SUPERVISOR ALCOVES, FINISHING DEPT AREA, FRAME/LENS INVENTORY AREA, SANDBLASTER/DUST… Status: Final | Not published | — |
| applied Jan 7 | #2025-001379-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER AWL EQUIPMENT VALIDATION TI 1ST FLR; DEMO WALLS, NEW WALL TO CREATE TRAINING RM, VALIDATION AREA, NEW DOORWAY, STRUCTURAL ANCHORAGE OF NEW EQUIPMENT, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-FLOOR SINK, 1-TRAP PRIMER, 1-MIXING VALVE, 1-EMERGENCY EYE WASH, 2-SINKS Status: Final | Not published | — |
| applied Mar 4 | #2025-016676-000-00-FA Facility Permit · Alteration power-KP AWL OPTICAL LAB 1ST FLR INT & EXT; EXTERIOR - INSTALL LOADING DOCK ROLLUP DOORS, DOCK LEVELER, INTERIOR - DEMO WALLS, NEW WALLS TO CREATE SHIPPING DEPT AREA, WORKSTATION ALCOVES, SERVER RM, SUPERVISOR ALCOVES, FINISHING DEPT AREA, FRAME/LENS INVENTORY AREA, SANDBLASTER/DUST COLLECTOR RM,… Status: Final | Not published | — |
| applied Mar 28 | #2025-024370-000-00-ET Electrical Permit · Addition/Alteration/Replacement SINGLE FEEDER FOR UPS REPLACEMENT Status: Final | Not published | — |
| applied Feb 27 | #2025-015544-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KP AWL OPTICAL LAB 1ST FLR INT & EXT; EXTERIOR - INSTALL LOADING DOCK ROLLUP DOORS, DOCK LEVELER, ROOF TOP METAL SCREEN WALL, INTERIOR - DEMO WALLS, NEW WALLS TO CREATE SHIPPING DEPT AREA, WORKSTATION ALCOVES, SERVER RM, SUPERVISOR ALCOVES, FINISHING DEPT AREA, FRAME/LENS… Status: Final | Not published | $2.1M |
| applied Feb 27 | #2025-015545-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KP AWL OPTICAL LAB 1ST FLR INT & EXT; ROOFTOP - AIR HANDLING UNITS, HEAT PUMP, EXHAUST FANS, INTERIOR - UNIT HEATER, TERMINAL UNITS, CONDENSATE PUMP, EXHAUST HOOD, DUCTWORK, DIFFUSERS, GRILLES AND ELEC Status: Final | Not published | $710K |
| applied Jan 15 | #2025-003602-000-00-FA Facility Permit · Alteration power-KAISER AWL CORE LINE BRIDGE STRATEGY TI 1ST FLR; MINOR DEMO, INSTALL STRUCTURAL ANCHORAGE FOR NEW EQUIPMENT, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Feb 27 | #2025-015555-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER REGIONAL LAB MAIN SECURITY COMMAND CENTER 1ST FLR TI; DEMO WALLS, NEW WALLS TO CREATE SCURITY OPERATIONS CENTER RMS, OFFICE, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $356K |
| applied Feb 27 | #2025-015558-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER REGIONAL LAB MAIN SECURITY COMMAND CENTER 1ST FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS AND ELEC Status: Final | Not published | $46K |
| applied Feb 27 | #2025-015554-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER REGIONAL LAB MAIN SECURITY COMMAND CENTER 1ST FLR TI; DEMO WALLS, NEW WALLS TO CREATE SCURITY OPERATIONS CENTER RMS, OFFICE, CEILING, FLOORING, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Feb 27 | #2025-015543-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KP AWL OPTICAL LAB 1ST FLR INT & EXT; EXTERIOR - INSTALL LOADING DOCK ROLLUP DOORS, DOCK LEVELER, INTERIOR - DEMO WALLS, NEW WALLS TO CREATE SHIPPING DEPT AREA, WORKSTATION ALCOVES, SERVER RM, SUPERVISOR ALCOVES, FINISHING DEPT AREA, FRAME/LENS INVENTORY AREA, SANDBLASTER/DUST… Status: Issued | Not published | — |
| applied Jan 16 | #2024-027296-REV-01-MT Mechanical Permit · Addition/Alteration/Replace (MT) Kaiser - REV 01 - MT revisions related demolition of microbiology hood and associated ductwork. **w/24-027294-REV-01-CO**. Status: Final | Not published | — |
| applied Jan 16 | #2024-027294-REV-01-CO Commercial Building Permit · Alteration REV 01 - Revision to new chiller PCH-201 and CH-102 location which as a result requires revisions to proposed location of new ADA parking stalls, striping and bollards. Bike locker and landscaping changes per final P&Z Review comments. Added demolition of microbiology hood and associated ductwork.… Status: Final | Not published | — |
| applied Jan 15 | #2025-003418-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER AWL CORE LINE BRIDGE STRATEGY TI 1ST FLR; MINOR DEMO, INSTALL STRUCTURAL ANCHORAGE FOR NEW EQUIPMENT, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $165K |
| applied Jan 15 | #2025-003415-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER AWL CORE LINE BRIDGE STRATEGY TI 1ST FLR; MINOR DEMO, INSTALL STRUCTURAL ANCHORAGE FOR NEW EQUIPMENT, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Dec 13 | #2024-104830-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER AWL EQUIPMENT VALIDATION TI 1ST FLR; INSTALL TERMINAL UNITS, DUCTWORK, GRILLES, DIFFUSERS AND ELEC Status: Final | Not published | $40K |
| applied Dec 13 | #2024-104828-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER AWL EQUIPMENT VALIDATION TI 1ST FLR; DEMO WALLS, NEW WALL TO CREATE TRAINING RM, VALIDATION AREA, NEW DOORWAY, STRUCTURAL ANCHORAGE OF NEW EQUIPMENT, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $260K |
| applied Dec 13 | #2024-105007-000-00-FA Facility Permit · Alteration power-KAISER AWL EQUIPMENT VALIDATION TI 1ST FLR; DEMO WALLS, NEW WALL TO CREATE TRAINING RM, VALIDATION AREA, NEW DOORWAY, STRUCTURAL ANCHORAGE OF NEW EQUIPMENT, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Dec 19 | #2024-105743-000-00-FS Fire Systems Permit · Alteration ALARM - FIRE ALARM INITIATION NOTIFICATION OF THE OUTLINED AREAS OF WORK. ADD NEW 4009 TRANSPONDER IN THE 1ST FLOOR TR ROOM 1203 Status: Final | Not published | — |
| applied Oct 31 | #2024-093279-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX ADD SERVICE AND LABS, PLUS UPGRADING THE HVAC SYSTEMS. Status: Final | Not published | — |
| applied Dec 13 | #2024-104824-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ KAISER AWL EQUIPMENT VALIDATION TI 1ST FLR; DEMO WALLS, NEW WALL TO CREATE TRAINING RM, VALIDATION AREA, NEW DOORWAY, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Aug 13 | #2024-069556-000-00-FS Fire Systems Permit · Alteration SPRINKLER - MODIFICATION OF EXISTING SPRINKLER SYSTEM TO ACCOUNT FOR NEW CEILINGS, WALLS, AND JOISTS Status: Final | Not published | — |
| applied Nov 7 | #2024-095633-000-00-ET Electrical Permit · Addition/Alteration/Replacement HVAC Control Wiring 24 volt or less Status: Final | Not published | — |
| applied Nov 7 | #2024-095627-000-00-ET Electrical Permit · Addition/Alteration/Replacement HVAC Control Wiring 24 volt or less Status: Final | Not published | — |