Get Procommercial project · Portland, OR
Commercial Electrical work permitted October 21, 2025, with 5 permits through June 15, 2026.
101831-26: Replace one existing 400 amp panel with one new 400 amp panel. Install two new 60 amp disconnects for transformer primary conductors. Replace 10 existing breakers with new breakers.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
5 permits issued Oct 21 – Jun 15, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 15 | #2026-043609-000-00-ET Electrical Permit · Addition/Alteration/Replacement 101831-26: Replace one existing 400 amp panel with one new 400 amp panel. Install two new 60 amp disconnects for transformer primary conductors. Replace 10 existing breakers with new breakers. Status: Issued | Not published | — |
#2026-024403-000-00-ET Electrical Permit · Addition/Alteration/Replacement KP outlet install for vending machine. Status: Final |
| Not published |
| — |
| applied Jan 29 | #2026-007343-000-00-ET Electrical Permit · Addition/Alteration/Replacement 700504 Harder@GPR - Upgrades on 3x Cargo Elevator Aprons - Tap fore 480v power from existing control panel to added panel and controls x 3 Status: Final | Not published | — |
| applied Nov 13 | #2025-092631-000-00-ET Electrical Permit · Addition/Alteration/Replacement 89223-25: Install one 100 amp 277/480 volt three phase feeder for new sub panel. Install one 30 amp 480 volt three phase circuit for heater out of new panel. Status: Final | Not published | — |
| applied Oct 21 | #2025-085754-000-00-ET Electrical Permit · Addition/Alteration/Replacement 700522 GP NWSC - MTS for Office Backup Generator. - Replace existing disconnect with 3 position manual transfer switch. Status: Final | Not published | — |