Get Procommercial project · Portland, OR
Commercial General Building, Fire Protection, Hvac/Mechanical, Plumbing work permitted December 16, 2024, with 25 permits through November 12, 2025, declaring $24,851,000 of work.
Addition of new 2nd floor to replace double-height natatorium with classroom and meeting space. New stairs and elevator. renovate level 1 to include locker room, fitness studio and exercise science spaces. New exterior entrance and windows. Includes associated site work and landscaping. **w/24-083872-MT & 24-083939-MT**
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
25 permits issued Dec 16 – Nov 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 20 | #2024-020319-DFS-16-CO Commercial Building Permit · Addition DFS 16 - Rooftop Mechanical Platform |
Status: Final
| Not published |
| — |
| applied Jul 18 | #2025-055723-000-00-CO Commercial Building Permit · Alteration SINGLE PDF - REPLACE BUS SHELTER AND PAVEMENT ON PCC CAMPUS FRONTING K STREET. Status: Final | Not published | $18K |
| applied May 14 | #2024-020319-DFS-15-CO Commercial Building Permit · Addition DFS 15 - PV Panel System 103,400 kW Status: Final | Not published | — |
| applied Mar 28 | #2025-019282-000-00-FS Fire Systems Permit · Alteration ALARM - REPLACING ALL OBSOLETE SD-SERIES SLC DEVICES (revised descp: LIKE-FOR-LIKE SK SERIES DEVICES + 81 SPKR STROBES)***VALUE ADDED REVISION TO REPLACE 5000 SERIES FACP WITH 6000 SERIES, SD SERIES SLC DEVICES WITH NEW SK-SERIES DEVICES.*** Status: Final | Not published | — |
| applied Mar 10 | #2024-020319-DFS-05-CO Commercial Building Permit · Addition DFS 05 - Fiber Reinforced Polymer (FRP) Reinforcing. Status: Final | Not published | — |
| applied Mar 31 | #2024-020319-DFS-08-CO Commercial Building Permit · Addition DFS 08 - Mechanical Piping Seismic Status: Final | Not published | — |
| applied Apr 15 | #2024-020319-DFS-12-CO Commercial Building Permit · Addition DFS 12 - Plumbing Piping - Seismic Status: Final | Not published | — |
| applied Apr 28 | #2024-020319-DFS-14-CO Commercial Building Permit · Addition DFS 14 - Chiller - Seismic Anchoring Status: Final | Not published | — |
| applied Apr 18 | #2024-020319-DFS-13-CO Commercial Building Permit · Addition DFS 13 - Mini Split - Seismic Anchoring Status: Final | Not published | — |
| applied Apr 15 | #2024-020319-DFS-10-CO Commercial Building Permit · Addition DFS 10 - Mechanical Equipment - HRV, Pumps, Storage Tank, Expansion Tank Status: Final | Not published | — |
| applied Apr 15 | #2024-020319-DFS-11-CO Commercial Building Permit · Addition DFS 11 - Curtain wall / storefront Status: Final | Not published | — |
| applied Apr 14 | #2024-020319-DFS-09-CO Commercial Building Permit · Addition DFS 09 to STR - Fall Protection Status: Final | Not published | — |
| applied Dec 17 | #2024-104161-000-00-FS Fire Systems Permit · Alteration SPRINKLER - DESIGN AND INSTALL MODIFICATIONS TO THE WET AUTOMATIC FIRE SPRINKLER SYSTEM FOR THE PCC SY-HT BUILDING WEST SIDE RENOVATION ****NOTE: This is a Risk category III building. A deferred submittal is required to be approved by PP&D for the attachment of sprinkler piping support and bracing… Status: Final | Not published | — |
| applied Mar 17 | #2024-020319-DFS-06-CO Commercial Building Permit · Addition DFS 06 - Fire Sprinkler Seismic Status: Final | Not published | — |
| applied Mar 31 | #2024-020319-DFS-07-CO Commercial Building Permit · Addition DFS 07 - Chilled Water Pump and Heated Water Pump seismic Status: Final | Not published | — |
| applied Feb 7 | #2024-020319-DFS-01-CO Commercial Building Permit · Addition DFS 01 - Fireproofing Status: Final | Not published | — |
| applied Feb 24 | #2024-020319-DFS-04-CO Commercial Building Permit · Addition DFS 04 - Dry mechanical seismic support and anchorage Status: Final | Not published | — |
| applied Feb 24 | #2024-020319-DFS-03-CO Commercial Building Permit · Addition DFS 03 - Electrical Seismic Attachments Status: Final | Not published | — |
| applied Feb 21 | #2024-020319-DFS-02-CO Commercial Building Permit · Addition DFS 02 - Skylight Status: Final | Not published | — |
| applied Oct 2 | #2024-083939-000-00-MT Mechanical Permit · New Construction Dry-side mechanical scope including air handler equipment and ductwork installation **w/24-020319-CO & 24-083872-MT** Status: Final | Not published | — |
| applied Oct 2 | #2024-020319-000-00-CO Commercial Building Permit · Addition Addition of new 2nd floor to replace double-height natatorium with classroom and meeting space. New stairs and elevator. renovate level 1 to include locker room, fitness studio and exercise science spaces. New exterior entrance and windows. Includes associated site work and landscaping.… Status: Final | Not published | $24.8M |
| applied Oct 2 | #2024-083872-000-00-MT Mechanical Permit · New Construction Wet-side mechanical scope of work: HVAC controls and overall mechanical coordination **w/24-020319-CO & 24-083939-MT** Status: Final | Not published | — |
| applied Oct 3 | #2024-020319-REV-01-CO Commercial Building Permit · Addition REV 01 to STR - Revise occupancy safety during construction plan include temporary changing rooms and lockers. Status: Final | Not published | — |
| applied Dec 2 | #2024-020319-REV-02-CO Commercial Building Permit · Addition REV 02 to STR - Revise details Status: Final | Not published | — |
| applied Dec 12 | #2024-104689-000-00-PT Plumbing Permit · Addition/Alteration/Replacement REMOVAL AND REPLACEMENT OF EXISTING PLUMBING FIXTURES FOR REMODELING THE WEST AND SOUTH SECTOR OF THE HEALTH TECHNOLOGIES BUILDING. ASSOCIATED BUILDING PERMIT 24-020319-CO. Status: Final | Not published | — |